Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.7 LAccepted-AOC FLAT NO 151 BLOCK NO 1 DIAMOND SQUARE CGHS LTD PLOT NO 13A SECTOR 6 DWARKA NEW DELHI 110075 | NEW DELHI | SOUTH WEST DELHI | DELHI | 110075 | L1 | Accepted-AOC Being L1 Bidder | |
| 2 | L2₹42.9 L+₹56,184 (1.33%)Rejected-Finance 1 225 5 6 SADAR BAZAR DELHI CANTT 110010 | NEW DELHI | DELHI | 110010 | L2 | Rejected-Finance OTHER THAN L1 | |
| 3 | L3₹44.5 L+₹2.2 L (5.12%)Rejected-Finance | L3 | Rejected-Finance OTHER THAN L1 | |
| 4 | L4₹47.4 L+₹5.1 L (12.1%)Rejected-Finance RZ H 5 NANDA BLOCK MAHAVIR ENCLAVE PART 1 PAL AM SOUTH WEST DELHI DELHI 110045 | SOUTH WEST DELHI | DELHI | 110045 | L4 | Rejected-Finance OTHER THAN L1 | |
| 5 | L5₹49.1 L+₹6.8 L (16.0%)Rejected-Finance BUILDING NO FLAT NO 19 6TH CROSS ROAD SANJEEVINI NAGAR MUDALAPALYA BANGALORE 560072 | BANGALORE | BANGALORE | KARNATAKA | 560072 | L5 | Rejected-Finance OTHER THAN L1 |
| Sl No | Description | Qty | Unit | MRITUNJYA ASSOCIATES L9 | KISHORE ENTERPRISES L3 | Rahul Enterprises L5 | M/s Naresh Kumar Gupta & Co. L6 | SM CONSTRUCTION COMPANY L4 | MAHABIR SINGH L10 | M P TYAGI ENGINEERS AND CONTRACTORS L2 | YANSHIKA SECURITY SERVICES L7 | BRIJ MOHAN LAL AND CO. L1 | SALUJA CONSTRUCTION CO L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches not exc 1.5 M wide and not exc 1.5 M in depth for pipe line, etc in soft/ loose soil getting out and levelling of bottom surface to required level complete all as specified and as directed. | 216 | CUM | 199 ₹42,984 | 250 ₹54,000 | 160 ₹34,560 | 150 ₹32,400 | 350 ₹75,600 | 200 ₹43,200 | 149 ₹32,184 | 157 ₹33,912 | 120 ₹25,920 | 100 ₹21,600 Lowest |
| 2.00 | Returning filling in, including spreading, leveling, watering and well ramming in layers not exc 25 cm thick complete all as specified and as directed. | 206 | CUM | 99 ₹20,394 | 170 ₹35,020 | 90 ₹18,540 | 80 ₹16,480 | 350 ₹72,100 | 250 ₹51,500 | 19 ₹3,914 Lowest | 110 ₹22,660 | 80 ₹16,480 | 100 ₹20,600 |
| 3.00 | Removing excavated material to a distance not exc 50 m and depositing where directed not exc 1.5 meters above the starting point complete all as specified and as directed. | 10 | CUM | 199 ₹1,990 | 210 ₹2,100 | 90 ₹900 | 100 ₹1,000 | 350 ₹3,500 | 150 ₹1,500 | 29 ₹290 Lowest | 115 ₹1,150 | 95 ₹950 | 120 ₹1,200 |
| 4.00 | Excavation in trenches by cutting of road crossing, PCC hard standing for taking out/laying of pipe lines including PCC (1:2:4) type B-2 (with 40 mm graded aggregate) in foundations,filling and mass concrete complete including making good the existing surface all as specified and directed. | 2 | CUM | 999 ₹1,998 | 1,000 ₹2,000 | 250 ₹500 Lowest | 300 ₹600 | 3,500 ₹7,000 | 250 ₹500 Lowest | 2,999 ₹5,998 | 1,550 ₹3,100 | 500 ₹1,000 | 655 ₹1,310 |
| 5.00Taking up CI/GI/Nidhi/DI/MS Pipes including all fitting of the following sizes as specified and directed by Engineer-in-Charge :- | |||||||||||||
| 5.01 | 100 mm bore | 200 | RM | 49 ₹9,800 | 50 ₹10,000 | 30 ₹6,000 | 20 ₹4,000 | 50 ₹10,000 | 50 ₹10,000 | 19 ₹3,800 Lowest | 70 ₹14,000 | 25 ₹5,000 | 30 ₹6,000 |
| 5.02 | 150 mm bore | 250 | RM | 49 ₹12,250 | 50 ₹12,500 | 30 ₹7,500 | 30 ₹7,500 | 50 ₹12,500 | 55 ₹13,750 | 29 ₹7,250 Lowest | 65 ₹16,250 | 35 ₹8,750 | 30 ₹7,500 |
| 6.00Supply, laying jointing, testing of DI pipe with class-K-7 spigot socketed ends, conforming to IS-8329 laid in trenches including providing route indicators of suitable height and laying at spacing of @ 50m center to center at GL mentioning name of contractor, date of execution & CA No with name of work & rubber gasket (Tyton) joints with jointing material & route indicators of the following sizes including taking down of existing CI/DI pipe complete all as specified and directed by Engineer-in-Charge. Note 1: - Excavation & earth work shall be measured and paid seperately under respective items of BOQ. Note 2:- Contractors will provide route indicators mild steel body with top 150 mm plate 3mm thick and height not less than 300mm above finished GL at suitable intervals as directed by EIC. Cost of route indicators shall be deemed included in quoted unit rates. Note 3:- DI pipe whole quantity of tender shall be procured by contractor in one time from the authorised dealer of approved make and PV's, MTC & e-way bill will produced by contractor during payment of 1st RAR as material laying at site. Note 4:- Piece meal site for laying of pipe shall be given by EIC and contractor arrange to transport the DI pipe accordingly at his own arrangement. No any additional payment for transportation will be given to contractor. Contractors are requested to quote rate accordingly. Note 5:- Layout plan for laying of DI pipe shall be given by EIC in writing. | |||||||||||||
| 6.01 | 100 mm bore | 200 | RM | 1,349 ₹2,69,800 | 1,350 ₹2,70,000 | 1,700 ₹3,40,000 | 1,600 ₹3,20,000 | 50 ₹10,000 Lowest | 1,950 ₹3,90,000 | 1,299 ₹2,59,800 | 1,658 ₹3,31,600 | 1,400 ₹2,80,000 | 50 ₹10,000 Lowest |
| 6.02 | 150 mm bore | 250 | RM | 1,849 ₹4,62,250 | 1,800 ₹4,50,000 | 2,050 ₹5,12,500 | 1,900 ₹4,75,000 | 50 ₹12,500 Lowest | 2,150 ₹5,37,500 | 1,499 ₹3,74,750 | 2,325 ₹5,81,250 | 1,700 ₹4,25,000 | 50 ₹12,500 Lowest |
Tender Value
₹48 L
EMD Value
₹96,000
Closing Date
18 Jul 2026, 6:00 pmClosed
GE U WATER SUPPLY DELHI CANTT 10
GE U WATER SUPPLY DELHI CANTT 10
REPAIR MAINTENANCE TO THE WATER SUPPLY INSTALLATIONS PUMP HOUSES FENCING HEADER FOUNDATION ETC AND IMPROVE WATER SUPPLY AND DISTRIBUTION SYSTEMS OF AGE U WATER SUPPLY NO I UNDER GE U WATER SUPPLY DELHI CANTT 10
2026_MES_770023_2
GE/WS/Token No-08 OF 2026-27
Open Tender
Civil Works
Item Rate
180 days
GE U WATER SUPPLY DELHI CANTT 10
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
GE U WATER SUPPLY DELHI CANTT 10
₹96,000
Yes
31 Jul 2026
4 Jul 2026
20 Jul 2026
4 Jul 2026
18 Jul 2026
12 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in trenches not exc 1.5 M wide and not exc 1.5 M in depth for pipe line, etc in soft/ loose soil getting out and levelling of bottom surface to required level complete all as specified and as directed. | 216 | CUM | 1 | ₹216 |
| 2 | Returning filling in, including spreading, leveling, watering and well ramming in layers not exc 25 cm thick complete all as specified and as directed. | 206 | CUM | 1 | ₹206 |
| 3 | Removing excavated material to a distance not exc 50 m and depositing where directed not exc 1.5 meters above the starting point complete all as specified and as directed. | 10 | CUM | 1 | ₹10 |
| 4 | Excavation in trenches by cutting of road crossing, PCC hard standing for taking out/laying of pipe lines including PCC (1:2:4) type B-2 (with 40 mm graded aggregate) in foundations,filling and mass concrete complete including making good the existing surface all as specified and directed. | 2 | CUM | 2 | ₹4 |
| 5 | Taking up CI/GI/Nidhi/DI/MS Pipes including all fitting of the following sizes as specified and directed by Engineer-in-Charge :- | - | - | - | - |
| - | 100 mm bore | 200 | RM | 1 | ₹200 |
| - | 150 mm bore | 250 | RM | 1 | ₹250 |
| 6 | Supply, laying jointing, testing of DI pipe with class-K-7 spigot socketed ends, conforming to IS-8329 laid in trenches including providing route indicators of suitable height and laying at spacing of @ 50m center to center at GL mentioning name of contractor, date of execution & CA No with name of work & rubber gasket (Tyton) joints with jointing material & route indicators of the following sizes including taking down of existing CI/DI pipe complete all as specified and directed by Engineer-in-Charge.
Note 1: - Excavation & earth work shall be measured and paid seperately under respective items of BOQ.
Note 2:- Contractors will provide route indicators mild steel body with top 150 mm plate 3mm thick and height not less than 300mm above finished GL at suitable intervals as directed by EIC. Cost of route indicators shall be deemed included in quoted unit rates.
Note 3:- DI pipe whole quantity of tender shall be procured by contractor in one time from the authorised dealer of approved make and PV's, MTC & e-way bill will produced by contractor during payment of 1st RAR as material laying at site.
Note 4:- Piece meal site for laying of pipe shall be given by EIC and contractor arrange to transport the DI pipe accordingly at his own arrangement. No any additional payment for transportation will be given to contractor. Contractors are requested to quote rate accordingly.
Note 5:- Layout plan for laying of DI pipe shall be given by EIC in writing. | - | - | - | - |
| - | 100 mm bore | 200 | RM | 1 | ₹200 |
| - | 150 mm bore | 250 | RM | 1 | ₹250 |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.62 MB
BOQ_869565.xls
BOQ • 0.42 MB
tender.pdf
Tender Documents • 0.77 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .