| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.0 LAccepted-AOC | L1 | Accepted-AOC Agg with L1 | |
| 2 | L2₹9.1 L+₹10,736.42 (1.20%)Rejected-AOC 107 AAJNOKH BARSANA CHHATA MATHURA | MATHURA | MATHURA | UTTAR PRADESH | L2 | Rejected-AOC Agg with L1 | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 4 | Not Admitted-Fee/PreQual/Technical HANS BHAWAN KALAGARH ROAD DHAMPUR DISTRICT BIJNOR UTTAR PRADESH | DHAMPUR | BIJNOR | UTTAR PRADESH | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Sanjay Kumar Contractor L2 | AASHTA CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in foundation in all types of soil including lift upto 1.50m and lead 30m and including back filling ,watering and ramming of excavated earth into the trenches or into the space between or into the plinth with removal and disposal of surplus earth as directed by the engineer in charge upto a distance of 30m from the foundation tranches | 78.92 | Cum | 82.24 ₹6,490.38 Lowest | 90 ₹7,102.8 |
| 2.00 | Centering and shuttering forP.C.C. work for including cost of material T&P etc complete | 12.96 | Cum | 472.88 ₹6,128.53 | 300 ₹3,888 Lowest |
| 3.00 | P.C.C. 1:3:6 (M10) in foundation with crushed aggregate & coarse sand with all cost of material, T&P and labour complete. | 10.06 | cum | 4,137.03 ₹41,618.56 | 4,000 ₹40,240 Lowest |
| 4.00 | Centering and shuttering for R.C.C. work including cost of material T&P etc complete | 125.9 | Sqm | 945.76 ₹1,19,071.18 | 301.6 ₹37,971.44 Lowest |
| 5.00 | Placing steel Reinforcement for Rcc Work including cost of material ,cutting, bending, binding, welding etc Complete | 5.58 | MT | 66,994.35 ₹3,73,828.47 Lowest | 80,000 ₹4,46,400 |
| 6.00 | Providing and laying RCC (M-20) 1:1.5:3 with crushed stone ballast and coarse sand with cost of material including T&P, labour etc. as per directed by Engineer in charge. | 45.92 | Cum | 5,038.96 ₹2,31,389.04 | 4,600 ₹2,11,232 Lowest |
| 7.00 | C.C. 1:1:2 (M25) in wearing coat with crushed aggregate & coarse sand with all cost of material, T&P and labour complete. | 2.06 | Cum | 7,352.52 ₹15,146.19 | 5,000 ₹10,300 Lowest |
| 8.00 | 1st Class Brick work in 1:4 cement coarse sand mortar including all cost of material & labour etc all completion of work (per cum ) | 25.81 | Cum | 4,399.28 ₹1,13,545.44 Lowest | 5,400 ₹1,39,374 |
| 9.00 | Supplying & fixing of G.I Pipe For Drainage Spout 75 mm dia and 0.60 mtr. long with all cost of material, T&P and labour complete. | 8 | Nos | 123.36 ₹986.88 | 120 ₹960 Lowest |
Tender Value
₹11 L
EMD Value
₹22,000
Closing Date
15 Sept 2026, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE MDGC MUZAFFARNAGAR
EE MDGC MUZAFFARNAGAR
Construction Of VRB Bhaisani Dy at Km 13.050
2026_UPIDC_1173256_21
TN-02/EE/2026-27
Open Tender
Civil Works
Item Wise
45 days
as per tender notice
as per tender notice
2 documents required · 2 mandatory
₹854
₹22,000
9 Oct 2026
10 Sept 2026
15 Sept 2026
10 Sept 2026
15 Sept 2026
10 Sept 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation in all types of soil including lift upto 1.50m and lead 30m and including back filling ,watering and ramming of excavated earth into the trenches or into the space between or into the plinth with removal and disposal of surplus earth as directed by the engineer in charge upto a distance of 30m from the foundation tranches | 78.92 | Cum | - | - |
| 2 | Centering and shuttering forP.C.C. work for including cost of material T&P etc complete | 12.96 | Cum | - | - |
| 3 | P.C.C. 1:3:6 (M10) in foundation with crushed aggregate & coarse sand with all cost of material, T&P and labour complete. | 10.06 | cum | - | - |
| 4 | Centering and shuttering for R.C.C. work including cost of material T&P etc complete | 125.9 | Sqm | - | - |
| 5 | Placing steel Reinforcement for Rcc Work including cost of material ,cutting, bending, binding, welding etc Complete | 5.58 | MT | - | - |
| 6 | Providing and laying RCC (M-20) 1:1.5:3 with crushed stone ballast and coarse sand with cost of material including T&P, labour etc. as per directed by Engineer in charge. | 45.92 | Cum | - | - |
| 7 | C.C. 1:1:2 (M25) in wearing coat with crushed aggregate & coarse sand with all cost of material, T&P and labour complete. | 2.06 | Cum | - | - |
| 8 | 1st Class Brick work in 1:4 cement coarse sand mortar including all cost of material & labour etc all completion of work (per cum ) | 25.81 | Cum | - | - |
| 9 | Supplying & fixing of G.I Pipe For Drainage Spout 75 mm dia and 0.60 mtr. long with all cost of material, T&P and labour complete. | 8 | Nos | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.87 MB
Tendernotice_2.pdf
PDF • 1.92 MB
BOQ_2227463.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .