Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC AVANTIKA COLONY NEAR RICE MILL AMROHA | AMROHA | AMROHA | UTTAR PRADESH | ₹1.1 Cr | L1 | Accepted-AOC accepted |
| 2 | L2₹1.3 Cr+₹17.8 L (15.9%)Rejected-AOC | ₹1.3 Cr+₹17.8 L (15.9%) | L2 | Rejected-AOC rejected |
| 3 | Rejected-Technical 0 AJAY KUMAR 85 HASTAM HASTAM BANDA UTTAR PRADESH 210001 HASTAM BANDA UTTAR PRADESH 210001 UDYAM UP 13 0007628 | BANDA | UTTAR PRADESH | 210001 | - | - | Rejected-Technical all technical documents not complete. |
| 4 | Rejected-Technical NA | NA | NA | 121004 | - | - | Rejected-Technical all technical documents not complete. |
Tender Value
₹1.1 Cr
EMD Value
₹2.3 L
Closing Date
5 Apr 2023, 12:00 pmClosed
SE IWC MBD
Office of the SE IWC MBD
Rampur nahar khand rampur ke niyantranadhin udhamsingh nagar mai (Nirmanadhin Kichha Marg NH-74 par) NHAI Ke Dwara Shatigrast Bagaiya Head Regulator ke punarsthapna ka karya
2023_UPIDC_790788_1
09/SEIWC/2022-23
Open Tender
Civil Works - Canal
Item Rate
90 days
rampur
as per NIT
2 documents required · 2 mandatory
₹2,354
₹2.3 L
16 Jul 2023
28 Mar 2023
5 Apr 2023
28 Mar 2023
5 Apr 2023
28 Mar 2023
Amount
Laying and Jointing PVC Pipe. Heading
Earth work in filling or in embankment in ordinary soil,excavation to be in the form of regular pits and earth work in embankment to be in 20cm layers including ramming and dressing the surface to be required levels and slope and also including All lead and lift with dressing, compaction etc. complete.
Supplying And Packing of earth filled old E.C. bags in Proper position to make plateform base i/c all cost of material labour etc. complete.
Earth work in excavation in foundation in all kind of soil including all leads, lifts and T&P with removal and disposal of surplus earth as directed by engineer-in-charge.
Laying P.C.C.(M-15) cement Concrete with cement , coarse sand & 10-20 mm down graded stone ballast including cost of all material, labour and T&P etc. complete but excludiing cost of Centering, shuttering & Reinforcement. And also including dewatering work with all cost of material, T & P and carriage/lift with respect all site conditions etc. complete.
Laying R.C.C. Mix (M-20) with Cement, coarse sand 10 & 20 mm stone ballast including cost of all material, labour and T&P etc. complete but excluding cost of Centering, shuttering & Reinforcement. And also including dewatering work with all cost of material, T & P and carriage/lift with respect all site conditions etc. complete.
Laying R.C.C. Mix (M-25) with Cement, coarse sand 10 & 20 mm stone ballast including cost of all material, labour and T&P etc. complete but excluding cost of Centering, shuttering & Reinforcement.etc complete.
Centering & shuttering for R.C.C. Work including cost of labour for centering & shuttering upto required height for proper complection of job as directed by Engineer-in-charge.
Providing and laying steel reinforcement including cost of steel cutting, bending with steel by binding wire etc including all cost of materials, labour, T&P with all leads and lifts for proper complection of job as directed by engineer-in-charge.
Supplying & laying 20-40 kg weight boulder in U/S protection work including all cost of material, labour, T&P ,dewatering with all leads and lifts for proper completion as directed by Engineer-in-charge.
Supplying & laying Coarse Sand below CC Blocks including all cost of material, labour, T&P with all leads and lifts for proper completion as directed by Engineer-in-charge.
Supplying & laying 4 to 10 mm aggrigate below CC blocks including all cost of material, labour, T&P with all leads and lifts for proper completion as directed by Engineer-in-charge.
Supplying & laying 10 to 20 mm aggrigate below CC blocks including all cost of material, labour, T&P with all leads and lifts for proper completion as directed by Engineer-in-charge.
Supplying and fabrication and erection of structural steel vertical lift crest gates, as per IS: 4622 with bearing plate, skin plate stiffeners, guides, embedded parts, sill beam, fitted with steel flat, track beam and sealing frame fitted with steel flat, roller, rubber seals ,manual operating etc. complete as per design and drawing and direction of the Engineer-in-charge.
Supplying and fixing rubber water stop in position including cost of all material labour T&P all leads and lifts cutting forming brazing fixing and maitaining.
M/S ARUN CONSTRUCTION
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .