ADDL CE(P AND W),SSTPP
ADDL CE(P AND W),SSTPP
AOH of Boiler Pressure Parts of Unit No. 3 and 4 at 2X660 MW, SSTPP, MPPGCL, Dongalia.
2021_MPPGC_174687_1
WT - 1551
Open Tender
Miscellaneous Works
Item Rate
60 days
ADDL CE(P AND W), SSTPP
As per NIT
19 documents required · 19 mandatory
₹5,000
Yes
₹2.0 L
Yes
24 Feb 2023
21 Jan 2022
28 Feb 2022
21 Jan 2022
26 Feb 2022
21 Jan 2022
SECTION-1
PREPARATION OF QUICK ERECT SCAFFOLDING SYSTEM (CUP-LOCK SYSTEM) IN FIRST PASS FROM BOTTOM ASH HOPPER TO ROOF OF FURNACE INCLUDING SECONDARY SUPER HEATER
INTERNAL CLEANING OF BOILER I ST PASS WITH THE HELP OF SKY CLIMBER BY PREPARATION OF SCAFFOLDING AT ASH PANEL FOR ASSEMBLY OF SKY-CLIMBER AND INSPECTION OF ASH PANEL TUBE
INTERNAL CLEANING OF BOILER II ND PASS
CLEANING OF ASH FROM ECONOMIZER HOPPER, DEAD CHAMBER, PENT HOUSE.
PREPARATION OF SCAFFOLDING IN BOILER HORIZONTAL PASS (SCREEN TUBES, RE-HEATER HANGER, SUPER HEATER HANGER TUBES,ECONOMIZER HANGER )
PREPARATION OF SCAFFOLDING ABOVE ECONOMIZER HOPPER FOR INSPECTION OF ECONOMISER LOWER BANK COILS.
PREPARATION OF SCAFFOLDING AT WW RING HEADER FOR INSPECTION OF RING HEADER & REFIXING/REPLACEMENT OF ORIFICES.
INSPECTION OF COMPLETE BOILER PRESSURE PARTS (I ST & II ND PASS)
INSPECTION/REPAIR OF ALL PEEP HOLES IN BOILER
CLEANING AND REPAIR OF All WIND BOXES
SERVICING OF SECONDARY/ADDITIONAL AIR PORT DAMPERS
PREPARATION OF SCAFFOLDING IN BOTTOM ASH HOPPER FOR REPAIR AND RE-FIXING OF SEAL PLATES OF WATERWALL ASH PANEL TROUGH SEAL AND FOR REFRATORY WORK IN BOTTOM ASH HOPPERS.
DYE PENETRATIONN TEST (DPT)
TRANSPORTATION OF ASH, SCRAPS,DEBRIS AND OTHER WASTE MATERIAL(INCL. LOADING./UNLOADING)
THOROUGH CLEANING OF BOILER FROM INSIDE BY USING HYDRO-JETTING METHOD
SECTION-2
RECTIFICATION, REPLACEMENT AND REFIXING OF PROTECTION SLEEVE (SHIELDING) IN VARIOUS AREAS OF BOILER TUBES.
PREPARATION OF BOILER TUBE SURFACE FOR TUBE THICKNESS SURVEY
SECTION-3 WELDING OF HP JOINTS AND ALIGHMENTOF BOILER TUBES/COILS/BANKS
WATER WALL TUBES( PRIMARY AND SECONDARY PASS)/RIFLE TUBES,SCREEN TUBES, HANGER TUBES ETC.
PRIMARY SUPER HEATER TUBES
SECONDARY SUPER HEATER TUBES
TERTIARY SUPER HEATER TUBES
PRIMARY SUPERHEATER SUPPORT/HANGER TUBES
PRIMARY REHEATER SUPPORT/HANGER TUBES
PRIMARY AND SECONDARY REHEATER TUBES
ROOF TUBES
ECONOMIZER SUPPORT TUBES
ECONOMIZER COILS IN REHEATER AND SUPERHEATER PASS
ALIGNMENT OF COILS OF TERTIARY/FINAL SUPERHEATERS
ALIGNMENT OF COILS OF SECONDARY SUPERHEATERS
ALIGNMENT OF COILS OF SECONDRY/FINAL REHEATERS
ALIGNMENT OF COIL OF ECONOMIZER
ALIGNMENT OF COIL OF PRIMARY SUPERHEATER
ALIGNMENT OF PRIMARY REHEATER COIL
WELDING OF FINS
RE-ENFORCEMENT OF WELDED JOINTS
PAD WELDING OF BOILER TUBES AT VARIOUS LOCATIONS ( SIZE 50mmX50mm)
CHECKING AND RECTIFICATION OF SUPPORTS/HANGERS OF CRITICAL PIPE LINES
CHECKING AND RECTIFICATION OF EXPANSION INDICATOR IN BOILER AREA
APPLICATION/REPAIR OF REFRACTORY(WHYTHEAT C/WHYTHEAT C PATCH) / BSF BLANKET AT VARIOUS LOCATIONS OF BOILER
BOTTOM ASH HOPPER GR-C
PENT HOUSE, DOORS & WINDOWS ETC. (ADDITIONAL AIR PORT/WATERWALL TUBES) GR.-C/HTC
MAN HOLES, PEEP HOLES, ROOF SEAL BOXES GR-C
HYDRAULIC TEST OF BOILER PRESSURE PART & PREPARATION FOR BOILER LIGHT UP
SECTION-5
COMPLETE SERVICING/OVERHAULING OF HP VALVES (MIV)
>25 mm & upto 50 mm
>50mm & upto 100 mm
>100 mm & upto200 mm
Above 200 mm
COMPLETE SERVICING OF VALVES (EXCLUDING ACTUATOR):
>25 mm & upto 50 mm
>50mm & upto 100 mm
>100 mm & upto200 mm
Above 200 mm
REPLACEMENT OF VALVES (WELDED TYPE)
Upto 25 mm
>25 mm & upto 50 mm
>50mm & upto 100 mm
COMPLETE SERVICING OF SPRING LOADED SAFETY VALVES
WATER SEPARATOR SV
MAIN STEAM LINES SV
CRH LINES SV
HRH LINES SV
ELECTROMATIC RELIEF VALVE AND PILOT VALVE
SECTION-7
PREPARATION OF HP TUBE BENDS
REPAIR OF PENT HOUSE/SKIN CASING OF BOILER
REPAIRING OF DEAD CHAMBER
APPLICATION OF THERMAL INSULATION
COMPLETE BOILER FROM BOTTOM ASH HOPPER TO PENT HOUSE
STEAM AND WATER PIPING
AIR HEATER & HOPPER
FUEL OIL AND ITS STEAM PIPING INCLUDING HEATERS FILTERS ETC.
SECTION-9
SERVICING OF MAIN STEAM STOP VALVE
SECTION-10
COMPLETE OVERHAULING & RESETTING OF WATER WALL SOOT BLOWER: -
COMPLETE OVERHAULING & RESETTING OF LONG RETRACTABLE SOOT BLOWER: -
EM Services (I) Pvt. Ltd.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .