Loading…
Loading…
| # | Company | Offered Item | Rank |
|---|---|---|---|
| 1 | Not yet disclosed by govt. L1 Item Categories: Split Air Conditioner Including Green AC, Wall Mount Type (V2),Split Air Conditioner Including Gree | Item Categories: Split Air Conditioner Including Green AC, Wall Mount Type (V2),Split Air Conditioner Including Gree | L1 |
| 2 | Not yet disclosed by govt. L2 Item Categories: Split Air Conditioner Including Green AC, Wall Mount Type (V2),Split Air Conditioner Including Gree | Item Categories: Split Air Conditioner Including Green AC, Wall Mount Type (V2),Split Air Conditioner Including Gree | L2 |
| 3 | Not yet disclosed by govt. L3 Item Categories: Split Air Conditioner Including Green AC, Wall Mount Type (V2),Split Air Conditioner Including Gree | Item Categories: Split Air Conditioner Including Green AC, Wall Mount Type (V2),Split Air Conditioner Including Gree | L3 |
| 4 | Not yet disclosed by govt. L4 Item Categories: Split Air Conditioner Including Green AC, Wall Mount Type (V2),Split Air Conditioner Including Gree | Item Categories: Split Air Conditioner Including Green AC, Wall Mount Type (V2),Split Air Conditioner Including Gree | L4 |
| 5 | Not yet disclosed by govt. L5 Item Categories: Split Air Conditioner Including Green AC, Wall Mount Type (V2),Split Air Conditioner Including Gree | Item Categories: Split Air Conditioner Including Green AC, Wall Mount Type (V2),Split Air Conditioner Including Gree | L5 |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
1 Sept 2025, 2:00 pmClosed
Split Air Conditioner Including Green AC
Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6619257 Dated : 28-08-2025 Bid Document 1/9
-- Number of days for which Bid would be auto -- extended 1 Past Performance 50 % Bid to RA enabled No Type of Bid Single Packet Bid Primary product category Split Air Conditioner Including Green AC
Wall Mount Type (V2) Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
8277985
GEM/2025/B/6619257
Single Packet Bid
Split Air Conditioner Including Green AC, Wall Mount Type
15 days
E T575001CANARA BANK REGIONAL OFFICE CIRCLE OFFICE BUILDING, BALMATTA ROAD, MANGALORE
Total value wise evaluation
PRODUCT
11 documents required · 11 mandatory
₹31
50%
Exempted
1 Sept 2025
28 Aug 2025
1 Sept 2025
Split Air Conditioner Including Green AC
Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6619257 Dated : 28-08-2025 Bid Document 1/9
-- Number of days for which Bid would be auto -- extended 1 Past Performance 50 % Bid to RA enabled No Type of Bid Single Packet Bid Primary product category Split Air Conditioner Including Green AC
Wall Mount Type (V2) Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8277985.pdf
GEM_BID
green_room_air_conditioner_specifications_-draft-_d_2024-05-01-11-50-44_6dc927f8627fd0e694ecf3e91a001743.pdf
SPECIFICATION
1756368060.pdf
OTHER
stc_-version_2-_split_air_conditioner_including_gre_2024-06-26-16-57-37_efdc88d6a009d5c093d94097cf97cbc4.pdf
OTHER
requirements_for_oem_status_against_the_category_-__2024-05-01-12-38-10_42eb1899ef2d07820095ebe48910a901.pdf
OTHER
OM_energy_ElecAppl.pdf
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .