Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹46,100
EMD Value
₹1,383
Closing Date
25 Aug 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Mechanical irrigation division Anantang HQ Awantipora
Repairs of 250 KVA Almunium wound HT Transformer and allied works at LIS Pahoo main and replacement of HT Termination kit at LIS Chekipanchpora
2021_IFC_134407_1
18/MIDA of 2021-2
Open Tender
Electrical and Maintenance Works
Item Rate
7 days
Chek Panchpora
Repairs of 250 KVA Almunium wound HT Transformer and allied works at LIS Pahoo main and replacement of HT Termination kit at LIS Chekipanchpora
2 documents required · 2 mandatory
₹50
Yes
Ex Engineer MID Ang HQ Awantipora
₹1,383
Yes
26 Aug 2021
13 Aug 2021
26 Aug 2021
13 Aug 2021
25 Aug 2021
13 Aug 2021
180 days
Amount
Repairs to 250 KVA Almunium wound HT Transformer by way of: Isolating and disconnecting of all incoming and outgoing leads from the HT transformer and marking of terminals etc. After dismantling and examining the damages shifting it to workshop for repairs and after complete repairs shifting back to the site.
Rewinding of burnt/ damaged windings of 4 NO HT coils and 1 NO LT coil of HT Transformer using superior quality Almunium wire/strips of proper gauge as per requirement with superior insulation. The job also includes the cotton tapings to the windings and the connections of the coils
Providing and fitting of 19 mm brass bush rods.
Providing and fitting of 185 mm2 dowells/ thimbles with tappings and insulation.
Assembling of HT Transformer on site and fitting of all the leads and connections and testing it on full load at site.
Replacement of HT Termination kit at LIS Cheki Panchpora by way of taking shut down of HT Line from the concerned Receiving station. After taking shut down replacement of termination kit of the HT Cable Line. The Termination Kit should e fitted at the end of the HT line near sub station and should be fully leak proof to avoid any faults.
S T ELECTRICAL ENG WORKS PEERNAR TRAL
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .