| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.5 LAccepted-Finance | L1 | Accepted-Finance Quoted Correctly. | |
| 2 | L2₹8.8 L+₹1.2 L (16.2%)Accepted-Finance | L2 | Accepted-Finance Quoted Correctly. |
| Sl No | Description | Qty | Unit | Bodyline Enterprises L1 | Aar Pee Construction Co. L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling of 100mm cast iron or reinforced concrete drain pipe, jointed in cement mortar and taking out of trenches/ floor/ wall if required complete all as specified and directed. | 20 | RM | 15 ₹300 Lowest | 80 ₹1,600 |
| 2.00 | S&F for 100 mm bore cast iron (sand cast pipe) soil, waste and vent pipes in any length with or without ears, with cement joints, fixed to wall, complete all as specified and directed. | 20 | RM | 797 ₹15,940 | 750 ₹15,000 Lowest |
| 3.00 | Cleaning the septic tank/ sludge chamber of any depth/ area/ condition incl taking out stagnated sludge or any other material mixed with the sludge etc. deposited in the septic tanks, filling in closed container and depositing in excavated pit, covering the pit at least 500m beyond nearby living accn or area as marked by station controlling authority with earth after depositing sludge, sprinkling fresh lime on covered pit and around septic tanks/ soakage wells to make it hygienic, complete all as specified and directed.
Note:- (i) Cost of pumping with mechanical sewage pump, excavation of earth pit and fresh lime shall be deemed to be included in the quoted rate.
(ii) Charges of covered container incl its transportation shall also deemed to be included in the quoted rate.
(iii) Depth of liquid sludge in the septic tank will be determined and recorded before commencement of work by any Engg conventional method in the presence of Engr-in charge and Contractor. | 100 | Cum | 497 ₹49,700 | 220 ₹22,000 Lowest |
| 4.00 | Comprehensive maintenance and cleaning of sewage system including sewage lines, manholes, soakage wells/ soak-pits, gully traps, septic tanks attending blockages in WCs/ WHBs/Drains etc by employing necessary resources including T&P at RMS Chail complete all as specified and directed. The location/ building/ complex where work is to be carried out consist of the following:-
All OTM and Md Accn at RMS Chail.
Notes:- (i) The Contractor will employ a Mazdoor (sweeper). The Mazdoor (sweeper) so employed shall report to the concerned JE daily to give feed back and also to receive day to day sewage Complaints and necessary instructions for smooth running of the contract.
(ii) He will also carry out normal maintenance to sewage system as required at site.
(iii) For any default/delay in attending the complaints recovery shall be effected as per contract conditions provided.
(iv) T & P as required for the work shall be arranged by the contractor without any extra cost to the deptt.
(v) Mazdoor (sweeper) engaged by the contractor shall take all necessary preventive safety measures and adequate precautions to avoid any health hazard and department shall not be held responsible for any unwanted incidence. | 9 | Per Month | 12,000 ₹1,08,000 Lowest | 13,500 ₹1,21,500 |
| 5.00Cleaning of SGSW/ CI pipe lines laid in trenches or fixed to wall/ floor incl desilting/ desludging intermediate manholes of any size and depth, removing sludge outside of MoD land in a covered container, at least 500 m beyond nearby living accn, depositing the sludge in a excavated pit, covering the pit with earth after depositing sludge, sprinkling fresh lime over the pit and around manholes complete all as specified and directed. Note: Charges of covered container incl its transportation charges, cost of fresh lime and earth pit shall be deemed to include in the quoted rate. | |||||
| 5.01 | 100mm internal dia of pipe line | 80 | RM | 20 ₹1,600 Lowest | 48 ₹3,840 |
| 5.02 | 150mm internal dia of pipe line | 80 | RM | 20 ₹1,600 Lowest | 75 ₹6,000 |
| 6.00 | M&L for Cleaning/ Removal of blockage of floor traps/ Nahani Traps of 75mm/100mm bore in kitchen/ Bathrooms/ Toilets etc up to 1st Manhole including of taking down PVC/ Stainless trap grating and refixing the same with white cement with pigment to match the surface as before or any other associated/ related complaints not mentioned under this item and will be done, complete all as specified and directed.
Note:- The traps shall be measured more than one times as per requirement. | 50 | Each | 25 ₹1,250 Lowest | 65 ₹3,250 |
| 7.00 | M&L for cleaning/ removal of blockage of Gully traps up to 1st Manhole of any size and any depth including Removing RCC Manhole covers and refixing the same as before any other associated/ related complaints not mentioned under this item, complete all as specified and directed.. Note:- The Gully traps shall be measured more than one times as per requirement. | 40 | Each | 50 ₹2,000 Lowest | 55 ₹2,200 |
| 8.00 | M & L for cleaning/ removal of blockage of Orissa Pattern WC 'P'/S trap and making functional up to 1st Manhole or any other associated/ related complaints not mentioned under this item, complete all as specified and directed.
Note:- The EWC shall be measured more than one times as per requirement. | 30 | Each | 50 ₹1,500 Lowest | 75 ₹2,250 |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
6 Aug 2026, 6:00 pmClosed
GE (I) JUTOGH
GE (I) JUTOGH, JUTOGH CANTT, SHIMLA (HP) - 171008
REPAIR TO SEPTIC TANKS, SOAKAGE WELLS AND MISC SEWAGE WORKS AT RMS CHAIL UNDER GE (I) JUTOGH
2026_MES_777513_1
GE(I)/JUT-50 OF 2026-27
Open Tender
Civil Works
Item Rate
330 days
RMS Chail
Class E and Category a (ii)
6 documents required · 6 mandatory
₹500
GE (I) JUTOGH
₹20,000
Yes
11 Aug 2026
9 Jul 2026
8 Aug 2026
9 Jul 2026
6 Aug 2026
23 Jul 2026
9 Jul 2026 - 16 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of 100mm cast iron or reinforced concrete drain pipe, jointed in cement mortar and taking out of trenches/ floor/ wall if required complete all as specified and directed. | 20 | RM | 10 | ₹200 |
| 2 | S&F for 100 mm bore cast iron (sand cast pipe) soil, waste and vent pipes in any length with or without ears, with cement joints, fixed to wall, complete all as specified and directed. | 20 | RM | 53 | ₹1,060 |
| 3 | Cleaning the septic tank/ sludge chamber of any depth/ area/ condition incl taking out stagnated sludge or any other material mixed with the sludge etc. deposited in the septic tanks, filling in closed container and depositing in excavated pit, covering the pit at least 500m beyond nearby living accn or area as marked by station controlling authority with earth after depositing sludge, sprinkling fresh lime on covered pit and around septic tanks/ soakage wells to make it hygienic, complete all as specified and directed.
Note:- (i) Cost of pumping with mechanical sewage pump, excavation of earth pit and fresh lime shall be deemed to be included in the quoted rate.
(ii) Charges of covered container incl its transportation shall also deemed to be included in the quoted rate.
(iii) Depth of liquid sludge in the septic tank will be determined and recorded before commencement of work by any Engg conventional method in the presence of Engr-in charge and Contractor. | 100 | Cum | 10 | ₹1,000 |
| 4 | Comprehensive maintenance and cleaning of sewage system including sewage lines, manholes, soakage wells/ soak-pits, gully traps, septic tanks attending blockages in WCs/ WHBs/Drains etc by employing necessary resources including T&P at RMS Chail complete all as specified and directed. The location/ building/ complex where work is to be carried out consist of the following:-
All OTM and Md Accn at RMS Chail.
Notes:- (i) The Contractor will employ a Mazdoor (sweeper). The Mazdoor (sweeper) so employed shall report to the concerned JE daily to give feed back and also to receive day to day sewage Complaints and necessary instructions for smooth running of the contract.
(ii) He will also carry out normal maintenance to sewage system as required at site.
(iii) For any default/delay in attending the complaints recovery shall be effected as per contract conditions provided.
(iv) T & P as required for the work shall be arranged by the contractor without any extra cost to the deptt.
(v) Mazdoor (sweeper) engaged by the contractor shall take all necessary preventive safety measures and adequate precautions to avoid any health hazard and department shall not be held responsible for any unwanted incidence. | 9 | Per Month | 10 | ₹90 |
| 5Cleaning of SGSW/ CI pipe lines laid in trenches or fixed to wall/ floor incl desilting/ desludging intermediate manholes of any size and depth, removing sludge outside of MoD land in a covered container, at least 500 m beyond nearby living accn, depositing the sludge in a excavated pit, covering the pit with earth after depositing sludge, sprinkling fresh lime over the pit and around manholes complete all as specified and directed. Note: Charges of covered container incl its transportation charges, cost of fresh lime and earth pit shall be deemed to include in the quoted rate. | |||||
| 5.01 | 100mm internal dia of pipe line | 80 | RM | 10 | ₹800 |
| 5.02 | 150mm internal dia of pipe line | 80 | RM | 10 | ₹800 |
| 6 | M&L for Cleaning/ Removal of blockage of floor traps/ Nahani Traps of 75mm/100mm bore in kitchen/ Bathrooms/ Toilets etc up to 1st Manhole including of taking down PVC/ Stainless trap grating and refixing the same with white cement with pigment to match the surface as before or any other associated/ related complaints not mentioned under this item and will be done, complete all as specified and directed.
Note:- The traps shall be measured more than one times as per requirement. | 50 | Each | 53 | ₹2,650 |
| 7 | M&L for cleaning/ removal of blockage of Gully traps up to 1st Manhole of any size and any depth including Removing RCC Manhole covers and refixing the same as before any other associated/ related complaints not mentioned under this item, complete all as specified and directed.. Note:- The Gully traps shall be measured more than one times as per requirement. | 40 | Each | 53 | ₹2,120 |
| 8 | M & L for cleaning/ removal of blockage of Orissa Pattern WC 'P'/S trap and making functional up to 1st Manhole or any other associated/ related complaints not mentioned under this item, complete all as specified and directed.
Note:- The EWC shall be measured more than one times as per requirement. | 30 | Each | 10 | ₹300 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
BOQ_870779.xls
BOQ • 1.43 MB
td.pdf
Tender Documents • 2.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .