| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.8 CrAccepted-Finance PLOT NO 61 BLOCK NO 7 WARD NO 1 GURGAON HARYANA 122001 | GURGAON | GURGAON | HARYANA | 122001 | ₹2.8 Cr | 1 | Accepted-Finance Being L-1 |
| 2 | 2₹2.8 Cr+₹2.2 L (0.79%)Accepted-Finance 00 BARGO BARGO SENDULI BENDULI GORAKHPUR UTTAR PRADESH 273016 | GORAKHPUR | UTTAR PRADESH | 273016 | ₹2.8 Cr+₹2.2 L (0.79%) | 2 | Accepted-Finance Being L-2 |
| Sl No | Description | Qty | Unit | Industrial Project and Products Company L1 | MARUTI ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | Civil works.
Dismantling plain cement concrete manually / by mechanical means carefully without damaging adjacent structures including disposal of debris within 200 m lead as per direction of Engineer-in-charge. | 10 | CuM | 1,000 ₹10,000 | 500 ₹5,000 Lowest |
| 2.00 | Demolishing C.C / R.C.C works by mechanical means and stock piling at designated locations carefully with out damaging adjacent structures and disposal of dismantled materials up to a lead of 100 m, stacking serviceable and unserviceable materials separately including cutting reinforcement bars all as directed at site. | 15 | CuM | 1,500 ₹22,500 | 800 ₹12,000 Lowest |
| 3.00 | Dismantling brick work in Cement mortar carefully without damaging adjacent structures including stacking of materials and dispoal of unserviceable materials within 100 m lead as per direction of Engineer-in-charge. | 15 | CuM | 1,000 ₹15,000 | 500 ₹7,500 Lowest |
| 4.00 | Dismantling doors, windows and clear storey openings (steel / wood) shutter including chowkhats, architraves, holdfasts etc. complete and stacking within 100 m lead (full windows) of area 3.00 Sq.M and below. | 10 | Nos | 1,500 ₹15,000 | 500 ₹5,000 Lowest |
| 5.00 | Dismantling cement asbestos, Celotax ,wooden or other hard board ceiling or partiton walls/paneling including stacking of serviceable materials and disposal of unserviceable materilas within 100 m lead. | 350 | SqM | 100 ₹35,000 Lowest | 100 ₹35,000 Lowest |
| 6.00 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 100 m lead.For thickness of tiles above 10 mm and up to 25 mm. | 250 | SqM | 200 ₹50,000 | 100 ₹25,000 Lowest |
| 7.00 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 100 m lead For thickness of tiles above 25 mm and up to 40 mm. | 350 | SqM | 250 ₹87,500 | 100 ₹35,000 Lowest |
| 8.00 | Dismantling old plaster / skirting carefully , raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 100 m lead. | 400 | SqM | 120 ₹48,000 | 100 ₹40,000 Lowest |
| 9.00 | Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismantling and stacking within 100 m lead. | 7 | MT | 20,000 ₹1,40,000 | 15,000 ₹1,05,000 Lowest |
| 10.00 | Lead charges for lead Exceeding 2 KM but not exceeding 3 KM, by mechanical transport including loading, unloading, stacking / levelling etc. Debris Beyond 2 Km but up to and including 3 km.
Note: The rates in respect of Item Nos 10 is applicable for NET Quantities arrived at after making deduction for voids @ 30% from corresponding TRUCK Measurement. | 200 | CuM | 1,200 ₹2,40,000 | 700 ₹1,40,000 Lowest |
Tender Value
₹2.9 Cr
EMD Value
₹6.9 L
Closing Date
7 Apr 2026, 3:00 pmClosed
Chief Engineer, CED
Civil Engineering Division, BARC
Composite work of refurbishment of B-Block lecture hall related to Civil, Electrical, HVAC and other allied works at ground floor, Mod Labs, North Site, BARC, Trombay, Mumbai- 400085
2026_BARC_899104_1
BARC/CED/ET/89/2025-2026 DATE 13/02/2026
Open Tender
Civil Works
Item Rate
450 days
B-Block lecture hall, Mod Labs, BARC
Please refer Tender documents
8 documents required · 8 mandatory
₹0
₹6.9 L
CED, BARC, Trombay, Mumbai
25 Jun 2026
20 Feb 2026
10 Apr 2026
23 Feb 2026
7 Apr 2026
17 Mar 2026
23 Feb 2026 - 6 Mar 2026
10 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Civil works.
Dismantling plain cement concrete manually / by mechanical means carefully without damaging adjacent structures including disposal of debris within 200 m lead as per direction of Engineer-in-charge. | 10 | CuM | - | - |
| 2 | Demolishing C.C / R.C.C works by mechanical means and stock piling at designated locations carefully with out damaging adjacent structures and disposal of dismantled materials up to a lead of 100 m, stacking serviceable and unserviceable materials separately including cutting reinforcement bars all as directed at site. | 15 | CuM | - | - |
| 3 | Dismantling brick work in Cement mortar carefully without damaging adjacent structures including stacking of materials and dispoal of unserviceable materials within 100 m lead as per direction of Engineer-in-charge. | 15 | CuM | - | - |
| 4 | Dismantling doors, windows and clear storey openings (steel / wood) shutter including chowkhats, architraves, holdfasts etc. complete and stacking within 100 m lead (full windows) of area 3.00 Sq.M and below. | 10 | Nos | - | - |
| 5 | Dismantling cement asbestos, Celotax ,wooden or other hard board ceiling or partiton walls/paneling including stacking of serviceable materials and disposal of unserviceable materilas within 100 m lead. | 350 | SqM | - | - |
| 6 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 100 m lead.For thickness of tiles above 10 mm and up to 25 mm. | 250 | SqM | - | - |
| 7 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 100 m lead For thickness of tiles above 25 mm and up to 40 mm. | 350 | SqM | - | - |
| 8 | Dismantling old plaster / skirting carefully , raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 100 m lead. | 400 | SqM | - | - |
| 9 | Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismantling and stacking within 100 m lead. | 7 | MT | - | - |
| 10 | Lead charges for lead Exceeding 2 KM but not exceeding 3 KM, by mechanical transport including loading, unloading, stacking / levelling etc. Debris Beyond 2 Km but up to and including 3 km.
Note: The rates in respect of Item Nos 10 is applicable for NET Quantities arrived at after making deduction for voids @ 30% from corresponding TRUCK Measurement. | 200 | CuM | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 8.05 MB
Tendernotice_2.pdf
PDF • 3.99 MB
ProformaofScheduleET89.pdf
Tender Documents • 1.34 MB
MechanicalspecificationET89.pdf
Additional Documents • 0.91 MB
DrawingET89.pdf
Additional Documents • 2.15 MB
ScheduleAET89.pdf
Tender Documents • 0.34 MB
ElectricalSpecificationET89.pdf
Additional Documents • 6.77 MB
TechnicalbidET89.xls
Tender Documents • 0.07 MB
BOQ_945053.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .