| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.0 CrAccepted-AOC | ₹1.0 Cr | 1 | Accepted-AOC lesser the estimate rate |
| 2 | 2₹1.0 CrRejected-Finance | ₹1.0 Cr | 2 | Rejected-Finance 0.64 percent higher the estimate rate |
| 3 | 3₹1.1 CrRejected-Finance MOULIVAKKAM 116 | NAGAPATTINAM | TAMIL NADU | 608002 | ₹1.1 Cr | 3 | Rejected-Finance 5.03 percent higher the estimate rate |
| Sl No | Description | Qty | Unit | GOOD CARE ENVIRO SYSTEM PVT LTD L3 | KLK Construction L2 | T MARIYAPPAN L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earthwork excavation in all soils and subsoils except hard rock requiring blasting with initial lead and lift as initial lead of 10.0 m and lift 0f 2.00 m including re-filling the sides of foundation in layer of 15cm. thick watering ramming depositing the surplus earth in the premises as directed by the departmental officers etc., complete complying with standard specification. | 1,094 | M3 | 173 ₹1.9 L | 160 ₹1.8 L | 165 ₹1.8 L |
| 2.00 | Cement Concrete M7.5 (1:4:8) (Design mix) using 40 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications | 180 | M3 | 5,370 ₹9.7 L | 5,055 ₹9.1 L | 5,114.4 ₹9.2 L |
| 3.00Vibrated Cement Concrete of grade M15 (Nominal mix) using 20mm ISS size HBG metal including cost and conveyance of all materials to site and cost cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths Hire charges for Tools and plants and incidental charges etc., complete as per relevent standard specification for Drain Side wall | ||||||
| 4.00 | Side wall | 489.45 | M2 | 11,274 ₹55.2 L | 11,200 ₹54.8 L | 10,737.7 ₹52.6 L |
| 5.00 | Supplying and fabricating and placing in position of M.S (or) ribbed Tar steel for all reinforced cement concrete works including cost of steel and binding wire and all labour charges for cutting and fabricaton and other incidental charges etc., complete complying with standard specification. | 11,274.25 | kg | 98 ₹11.0 L | 91 ₹10.3 L | 92.9 ₹10.5 L |
| 6.00 | Vibrated Reinforced Cement Concrete M20 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for Culvert DECK SLAB | 173.45 | M3 | 11,484 ₹19.9 L | 11,000 ₹19.1 L | 10,937.8 ₹19.0 L |
| 7.00 | Supply and fixing of SFRC Manhole cover (0.60m x 0.60m) including cost of man hole cover conveyance to the site and labour charges for fixing etc. complete complying with standard specification | 354 | No | 2,836 ₹10.0 L | 2,400 ₹8.5 L | 2,700 ₹9.6 L |
| 8.00 | Removal of Excavated Excess Earth away from the site to 3 KM including loading and transportation charges etc, complete as per standard specification. For 1m3 | 876 | M3 | 84 ₹73,584 | 50 ₹43,800 | 80 ₹70,080 |
Updated dates
Tender Value
₹1.3 Cr
EMD Value
₹1.3 L
Closing Date
3 Mar 2026, 3:00 pmClosed
commissioner
13,sendurai main rd,elil nagar,dindigul
15th CFC-Package 4-Construction Of Storm Water Drain In Narayanapillai Thottam 1st Street,Narayanapillai Thottam 2nd Street,Narayanapillai Thottam 3rd Street, West Ashok Nagar Extension Main Road
2026_MAWS_660646_4
2855/2023/e4
Open Tender
Civil Works
13, sendurai main rd, elil nagar
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1.3 L
13,sendurai main rd,elil nagar,dindigul
20 May 2026
19 Feb 2026
3 Mar 2026
19 Feb 2026
3 Mar 2026
19 Feb 2026
23 Feb 2026
Earthwork excavation in all soils and subsoils except hard rock requiring blasting with initial lead and lift as initial lead of 10.0 m and lift 0f 2.00 m including re-filling the sides of foundation in layer of 15cm. thick watering ramming depositing the surplus earth in the premises as directed by the departmental officers etc., complete complying with standard specification.
Cement Concrete M7.5 (1:4:8) (Design mix) using 40 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications
Vibrated Cement Concrete of grade M15 (Nominal mix) using 20mm ISS size HBG metal including cost and conveyance of all materials to site and cost cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths Hire charges for Tools and plants and incidental charges etc., complete as per relevent standard specification for Drain Side wall
Side wall
Supplying and fabricating and placing in position of M.S (or) ribbed Tar steel for all reinforced cement concrete works including cost of steel and binding wire and all labour charges for cutting and fabricaton and other incidental charges etc., complete complying with standard specification.
Vibrated Reinforced Cement Concrete M20 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for Culvert DECK SLAB
Supply and fixing of SFRC Manhole cover (0.60m x 0.60m) including cost of man hole cover conveyance to the site and labour charges for fixing etc. complete complying with standard specification
Removal of Excavated Excess Earth away from the site to 3 KM including loading and transportation charges etc, complete as per standard specification. For 1m3
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.79 MB
bidfour.pdf
Tender Documents • 0.89 MB
BOQ_792892.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid