Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹67.9 LAccepted-AOC | ₹67.9 L Quoted ₹68.7 L | L1 | Accepted-AOC ok |
| 2 | L2₹76.8 L+₹8.1 L (11.8%)Rejected-AOC XEN ADAMPUR W S DIVISION HISAR HARYANA | ₹76.8 L+₹8.1 L (11.8%) | L2 | Rejected-AOC ok |
| 3 | L3₹77.2 L+₹8.5 L (12.4%)Rejected-AOC NEAR MAIN CHOWK BAJJALPUR 125111 | FATEHABAD | HARYANA | 125111 | ₹77.2 L+₹8.5 L (12.4%) | L3 | Rejected-AOC ok |
Tender Value
₹70.2 L
EMD Value
₹1.4 L
Closing Date
8 Jun 2026, 5:00 pmClosed
Nidhi bhardwaj
Horticulture Hissar
ROUGH COST ESTIMATE FOR DEVELOPMENT OF BOUNDARY WALLS IN 04 NOS. GREEN BELTS IN SEC 20 P III, SIRSA ROUGH COST ESTIMATE FOR DEVELOPMENT OF BOUNDARY WALLS IN 04 NOS. GREEN BELTS IN SEC 20 P III, SIRSA ROUGH COST ESTIMATE FOR DEVELOPMENT OF B
2026_HBC_524105_1
20268C499F55 5402 47AC A512 07D93EBC7439262HSV
Open Tender
Civil Works
Works
170 days
Sirsa Sirsa Sirsa
3 documents required · 3 mandatory
₹2,000
₹1.4 L
Yes
18 Sept 2026
25 May 2026
9 Jun 2026
25 May 2026
8 Jun 2026
25 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate] | 135.78 | cum | 1,863 | ₹2,52,958.14 |
| 2 | [11.25.2]Pointing on brick work or brick flooring with cement mortar 1:3 (1 cement : 3 fine sand): 2. Raised and cut pointing [Through Rate] | 2,207.95 | Sqm | 105 | ₹2,31,834.75 |
| 3 | [11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate] | 76.48 | Sqm | 113 | ₹8,642.24 |
| 4 | [11.6.1]15 mm cement plaster on the rough side of single or half brick wall of mix : 1. 1:4 (1 cement: 4 fine sand) [Through Rate] | 2,207.95 | Sqm | 138 | ₹3,04,697.1 |
| 5 | [11.93.1]Finishing walls with water proofing cement paint of required shade : 1. New work (Two or more coats applied @ 3.84 kg/10 sqm) [Through Rate] | 5,014.58 | Sqm | 39 | ₹1,95,568.62 |
| 6 | [11.97.3]Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications : 3. Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 litre/10 sqm over an under coat of primer applied @ 0.80 litre/10 sqm of approved brand and manufacture [Through Rate] | 1,152.53 | Sqm | 59 | ₹67,999.27 |
| 7 | [13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate] | 30,924.81 | Kg. | 83 | ₹25,66,759.23 |
| 8 | [4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate] | 674.16 | cum | 78 | ₹52,584.48 |
| 9 | [6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) [Through Rate] | 29.73 | cum | 3,476 | ₹1,03,341.48 |
| 10 | [6.29.1]Centering and shuttering including strutting, propping etc. and removal of form work for : 1. Foundations, footings, bases for columns [Through Rate] | 340.42 | Sqm | 155 | ₹52,765.1 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.91 MB
BOQ_603051.xls
BOQ • 0.29 MB
AD0139488.pdf
Additional Documents • 8.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .