Loading…
Loading…
Tender Value
₹7.9 L
EMD Value
₹78,525
Closing Date
20 Jul 2026, 12:00 pm5d left
CHIEF ENGINEER CIVIL
NAGAR NIGAM AGRA
Construction work for repairing damaged culverts at various locations near Vankhandi Mahadev Temple, near Bai Ka Bazar, and in Vinayak Nagar and Krishna Colony (specifically in the Hariparvat zone, covering areas such as Gayatri Vihar, Sikandra Viha
2026_DOLBU_1169251_1
10-07-2026/NAGAR NIGAM AGRA/18-07-2026/63
Open Tender
Construction Works
30 days
AGRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
NAGAR NIGAM
₹78,525
14 Jul 2026
14 Jul 2026
20 Jul 2026
14 Jul 2026
20 Jul 2026
14 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of R.C.C./R.B work including stacking of material as directed by E/IC within distance of 60 meters. | 14.04 | cum | 1,275 | ₹17,901 |
| 2 | Cartage of silt, sludge kankar and other disposable organic material etc. all complete with labor T&P including cartage of 8 km. | 14.04 | cum | 230.1 | ₹3,230.6 |
| 3 | Providing and laying cement concrete in 1:5:10 (1 Cement :5 Fine Sand :10 Stone Ballast 40 mm guages) and curing complete, including cost of form work in foundation and floors. | 17.68 | cum | 5,325 | ₹94,146 |
| 4 | M-150 Brick work in 1:4 with Cement and coarse sand including supply of all material, labor T & P etc. required for proper completion of work. | 34.82 | cum | 5,650 | ₹1,96,733 |
| 5 | 12MM Thick cement plaster in single coat of fair side of single of half brick wall for interior plastering up to floor two level including internal rounded angles chamfers and rounded angles not including 80mm in girth and finished even and smooth. No extra for missing any additive. 1 cement : 4 Coarse Sand. | 91.98 | sqm | 200 | ₹18,396 |
| 6 | R.C.C. work with cement approved coarse sand and 2cm (3/4) gauge approved stone ballast in the proportion 1:1.5:3 (1 Cement : 1.5 Coarse Sand : 3 Stone Grit) in R.C.C. column. | 11.23 | cum | 8,700 | ₹97,701 |
| 7 | Mild Steel or iron in plain work such as reinforced concrete or reinforced brick work (When not included in and an overall rates) brought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage bend hooks and authorized over lapping shall be measured up to floor two level. (10 mm to 12mm tor (TMT Bars). | 8.82 | qtl | 8,500 | ₹74,970 |
| 8 | Providing and laying cement concrete in 1:2:4 (1 cement : 2 coarse sand : 4 graded stone) aggregate (20 mm nominal size) and cutting complete including cost of form work. In foundation and floors. | 12.27 | cum | 6,600 | ₹80,982 |
| 9 | Providing of 32 HP diesel pump for dewatering of pond with pump, driver etc. all complete. (for 8 hours) | 20 | Days | 2,100 | ₹42,000 |
| 10 | Providing and fixing of barricading of 100mm average ballies with in a distance of 1.50 meter for 3 rows of 3Q. 3 Nosof cross ballies, two supporting ballies of 3 meter ballies and 2 Nos perpendicular ballies tie with moonj rope including supply of all material such as ballies rope T&P required for proper completion of work and also including labour component (material will be property of contractor after dismantling). | 40 | rmt | 225 | ₹9,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
BOQ_2194156.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid