Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.9 CrAccepted-AOC 193 4 B APPA APARTMENT OLD PETH TALEGAON DABHADE TAL MAVAL DIST PUNE | PUNE | MAHARASHTRA | 412106 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹22.2 Cr+₹36.9 L (1.69%)Rejected-Finance G 8 PANDURANG BHAVAN BORADE PETROL PUMP CHOWK MALKAPUR KARAD SATARA DISTRICT | PUNE | MAHARASHTRA | 412206 | L2 | Rejected-Finance Not Qualified | |
| 3 | Rejected-Technical CTS NO 495 A 45 PLOT NO 46 SHIVSAMPADA MUTHA COLONY SADAR BAZAR SATARA | SATARA | SATARA | MAHARASHTRA | 415001 | - | Rejected-Technical As per tender condition no.Annexure-I (Use Specialized Machinery) (1) (h) (i) (j) Sand Screening Machine, CTM Machine and Transit Mixer not Owned by Contractor and Sand Screening Machine MOST certificate not Uploaded/Submitted hence disqualified | |
| 4 | Rejected-Technical ANUSAYA S NO 78 KARAD WAKHAN ROAD NEAR KARAD URBAN BANK KARAD DIST SATARA | PUNE | MAHARASHTRA | 412206 | - | Rejected-Technical As per tender condition no.4.2 (h) (i) (j) (k), 4.4 Obligatory Conditions (3) (4) (5) and Use Specialized Machinery (1) (c) Sensor Paver Machinery valid MOST certificate (f) Motor Grader ownership documents not Uploaded/Submitted hence disqualified |
| Sl No | Description | Qty | Unit | UNITY BUILDERS AND ROAD CONSTRUCTIONS PVT LTD L1 | DHD INFRACON PVT LTD L2 |
|---|---|---|---|---|---|
| 1.00 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 milimetre, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 milimetre in thickness. | 84,800 | One Square Metre | 15.58 ₹13,20,844.8 Lowest | 15.84 ₹13,43,232 |
| 2.00 | Cutting down trees including trunks and branches with girths above 30 centimetre to 60 centimetre and stacking the material neatly with all lifts and lead of 1000 metre as directed and earth filling in the depression/pit if any. | 20 | One Number | 662.1 ₹13,241.96 Lowest | 673.32 ₹13,466.4 |
| 3.00 | Cutting down trees including trunks and branches with girths above 60 centimetre to 90 centimetre and stacking the material neatly with all lifts and lead of 1000 metre as directed and earth filling in the depression/pit if any. | 10 | One Number | 1,097.4 ₹10,974 Lowest | 1,116 ₹11,160 |
| 4.00 | Scarifying the existing granular road surface to a depth of 50 mm by manual means and disposal of scarified material within all lifts and leads upto 1000 metre. | 5,500 | One Square Metre | 60.89 ₹3,34,884 Lowest | 61.92 ₹3,40,560 |
| 5.00 | Excavation for roadway in earth soil of all sorts, sand, gravel or soft murum including dressing section to the required grade camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50 metre and spreading for embankment or stacking as directed. | 23,842.71 | One Cubic Metre | 154.17 ₹36,75,759.07 Lowest | 156.78 ₹37,38,060.07 |
| 6.00 | Excavation for roadway in hard murum and boulder including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50 metre and spreading for embankment or stacking as directed. | 9,934.46 | One Cubic Metre | 180.07 ₹17,88,878.34 Lowest | 183.12 ₹18,19,198.32 |
| 7.00 | Excavation for roadway in soft rock including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50 metre and spreading or stacking as directed. | 3,973.79 | One Cubic Metre | 229.33 ₹9,11,321.18 Lowest | 233.22 ₹9,26,767.3 |
| 8.00 | Excavation for roadway in hard rock by wedging and chiselling or line drilling including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50 metre and spreading for embankment or stacking as directed. | 1,986.89 | One Cubic Metre | 1,838.5 ₹36,52,895.28 Lowest | 1,869.66 ₹37,14,808.76 |
| 9.00 | Excavation for catch/ side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed. | 6,042 | One Cubic Metre | 154.17 ₹9,31,477.01 Lowest | 156.78 ₹9,47,264.76 |
| 10.00 | Excavation for catch/ side water gutter in hard murum and boulder strata to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed. | 2,968 | One Cubic Metre | 180.07 ₹5,34,441.82 Lowest | 183.12 ₹5,43,500.16 |
Tender Value
₹18.8 Cr
EMD Value
₹9.4 L
Closing Date
1 Sept 2023, 5:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, P.W. (West) Division,Satara.
Executive Engineer, P.W. (West) Division,Satara, Bandhkam Bhavan, Sadar Bazar, Satara, 415001
IMPROVEMENT TO SH-148 NAVJA HELWAK MORGIRI GARVADE SAJUR TAMBVE KALE WING WATHAR RETHRE SHENOLI STATION ROAD FROM KM 32/500 to 62/500 TAL.PATAN.DIST.SATARA.
2023_PWDRP_933180_1
SHORT PERIOD E-TENDER NOTICE NO.50 /2023-24 (B-2)
Open Tender
Civil Works - Roads
Item Rate
365 days
TAL.PATAN.DIST.SATARA.
As Per B-2 STANDARD BIDDING DOCUMENT Tender Form
6 documents required · 6 mandatory
₹3,540
₹9.4 L
office of the Chief Engineer, P.W.Region, Pune
7 Dec 2023
8 Aug 2023
4 Sept 2023
8 Aug 2023
1 Sept 2023
8 Aug 2023
22 Aug 2023
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 milimetre, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 milimetre in thickness. | 84,800 | One Square Metre | - | - |
| 2 | Cutting down trees including trunks and branches with girths above 30 centimetre to 60 centimetre and stacking the material neatly with all lifts and lead of 1000 metre as directed and earth filling in the depression/pit if any. | 20 | One Number | - | - |
| 3 | Cutting down trees including trunks and branches with girths above 60 centimetre to 90 centimetre and stacking the material neatly with all lifts and lead of 1000 metre as directed and earth filling in the depression/pit if any. | 10 | One Number | - | - |
| 4 | Scarifying the existing granular road surface to a depth of 50 mm by manual means and disposal of scarified material within all lifts and leads upto 1000 metre. | 5,500 | One Square Metre | - | - |
| 5 | Excavation for roadway in earth soil of all sorts, sand, gravel or soft murum including dressing section to the required grade camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50 metre and spreading for embankment or stacking as directed. | 23,842.71 | One Cubic Metre | - | - |
| 6 | Excavation for roadway in hard murum and boulder including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50 metre and spreading for embankment or stacking as directed. | 9,934.46 | One Cubic Metre | - | - |
| 7 | Excavation for roadway in soft rock including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50 metre and spreading or stacking as directed. | 3,973.79 | One Cubic Metre | - | - |
| 8 | Excavation for roadway in hard rock by wedging and chiselling or line drilling including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50 metre and spreading for embankment or stacking as directed. | 1,986.89 | One Cubic Metre | - | - |
| 9 | Excavation for catch/ side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed. | 6,042 | One Cubic Metre | - | - |
| 10 | Excavation for catch/ side water gutter in hard murum and boulder strata to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed. | 2,968 | One Cubic Metre | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_1626423.xls
BOQ Document • 0.33 MB
126762211.pdf
Tender Document • 0.13 MB
50_1_B_2_BT_CC_O_Navja_Helwak_CRF_Patan_S_.pdf
Tender Document • 9.09 MB
126762214.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .