| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.9 LAccepted-AOC VILL ODDI P O KIAR TEHSIL THEOG DISTT SHIMLA H P | L1 | Accepted-AOC L1 | |
| 2 | L2₹20.4 L+₹42,063.75 (2.11%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹21.5 L+₹1.6 L (7.95%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹24.0 L+₹4.1 L (20.4%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹24.1 L+₹4.1 L (20.6%)Rejected-Finance VILLAGE TUNGLA P O BALGHAR TEH THEOG DISTT SHIMLA HP | THEOG | SHIMLA | HIMACHAL PRADESH | L5 | Rejected-Finance L5 |
Tender Value
₹27.6 L
EMD Value
₹48,877
Closing Date
1 Mar 2023, 5:00 pmClosed
Executive Engineer
Jal Shakti Division No-I Kasumpati Shimla-9
.
2023_HPIPH_69557_1
Kasumpti/shimla/source/Sainj
Open Tender
Civil Works - Water Works
Item Rate
365 days
Shimla
Please refer Tender documents.
7 documents required · 7 mandatory
₹400
ee Jal Shakti Division No-I
₹48,877
Yes
9 May 2023
23 Feb 2023
2 Mar 2023
23 Feb 2023
1 Mar 2023
23 Feb 2023
Amount
Excavation in foundation, trenches,etc. in earth work in all kinds of soil such as pick work,jumper work,blasting work, hard blasting and chiselling etc. stacking the excavated soil not more than 3 mtrs. clear from the edge of excavation and then returning the stacked soilin 15cm.layers when required into plinths sides of foundations etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed within all leads and lifts.
Prov. and laying cement concrete 1:4:8 (1 cement:4 sand:8 graded stone agg. 40mm nominal size) and curing complete excluding cost of form work in
:-a) Foundation and plinth.
Prov. and laying cement concrete 1:1:2 (1cement:1 sand:2 graded stone agg. 20mm nominal size) and curing complete excluding cost of form work in :-
a) Foundation and plinth.
b) Wall (any thickness but not less than 0.1 mtr thickness ) attached plasters, butteresses, plinth and string courses etc. from top of foundation level up to floor two level.
Prov. Mild steel/Tor steel reinforced for RCC work including bending,binding and placing in position complete upto floor two level i/c all leads and lifts complete in all respect @ 70 kg /cum :-
Prov. and laying cement concrete work 1:3:6 (1 cement: 3 sand:6 graded stone agg. 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in :-
Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring, shuttering, strutting , strutting and propping etc. with wooden, battens, and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4 mtrs.and removal of the same for insitu reinforced concrete and plain concrete work in:-
a) Vertical surfaces such as walls any thickness) partitions and the like including attached pillasters,buttresses, plinth and string courses and the like.
Ajay Sharma
Vikram
BALDEV CHAUHAN
Rajesh Bhandari
SANJEEV KUMAR
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .