| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-AOC HARYANA HR | FARIDABAD | HARYANA | 121001 | ₹1.7 Cr | L1 | Accepted-AOC Being L1 |
| 2 | L2₹2.0 Cr+₹23.5 L (13.5%)Rejected-Finance | ₹2.0 Cr+₹23.5 L (13.5%) | L2 | Rejected-Finance Being L2 |
| 3 | L3₹2.1 Cr+₹31.6 L (18.2%)Rejected-Finance NOT SPECIFIED | ₹2.1 Cr+₹31.6 L (18.2%) | L3 | Rejected-Finance Being L3 |
| 4 | L4₹2.1 Cr+₹34.9 L (20.1%)Rejected-Finance | ₹2.1 Cr+₹34.9 L (20.1%) | L4 | Rejected-Finance Being L4 |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Non-Responsive as the agency is debarred on HEW Portal. Hence, the technical evaluation of the agency is not possible as successful bidder on HEW Portal |
| Sl No | Description | Qty | Unit | Puran Singh Contractor L3 | DARA SINGH CONTRACTOR L2 | THE BHAGWATI COOP LANDC SOCIETY LTD L1 | BALIRAM SINGH L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | credit of old bricks and Brick Bats | 454.23 | cum | 540 ₹-2,45,284 Lowest | 540 ₹-2,45,284 Lowest | 540 ₹-2,45,284 Lowest | 540 ₹-2,45,284 Lowest |
| 2.00 | Supply, carriage and fixing of R.C.C panels of requisite size as per approved design drawing and P.W.D. Specifications (27` x 27`) | 1,040 | Nos. | 200 ₹2,08,000 | 129 ₹1,34,160 Lowest | 150 ₹1,56,000 | 135 ₹1,40,400 |
| 3.00 | Supply, carriage and fixing of R.C.C lids Dia 21` | 520 | Each | 200 ₹1,04,000 | 128 ₹66,560 Lowest | 150 ₹78,000 | 130 ₹67,600 |
| 4.00 | Supply carriage and laying of 100 micron polythene under bed lining | 13,049.96 | Sqm | 40 ₹5,21,998 | 13.23 ₹1,72,651 | 30 ₹3,91,499 | 13 ₹1,69,649 Lowest |
Tender Value
₹2.2 Cr
EMD Value
₹4.3 L
Closing Date
27 Nov 2025, 12:00 pmClosed
SANJIV KUMAR
MICAD Division Fatehabad
Estimate for Remodeling/Rehabilitation for lining of W/C At Outlet RD 6000-T New Bhattu Minor
2025_HBC_439766_1
2025E87E9F58 9624 4EC1 BBCD 8C2FA39C7848373CAD
Open Tender
Civil Works
Works
470 days
BHATTU KALAN
8 documents required · 8 mandatory
₹15,000
₹4.3 L
Yes
MICAD Division Fatehabad
17 Mar 2026
22 Apr 2025
27 Nov 2025
22 Apr 2025
27 Nov 2025
22 Apr 2025
22 Apr 2025 - 23 Apr 2025
5 May 2025
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority: Executive Engineer, MICAD Division, Fatehabad
Name of Work :- ::Remodeling/Rehabilitation for lining of W/C At Outlet RD 6000-T New Bhattu Minor
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Item Description (HSR) Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder in Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT in Rs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
1 credit of old bricks and Brick Bats 454.23 cum 540 Excess(+) 1 Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
2 Supply, carriage and fixing of R.C.C panels of requisite size as per approved design drawing and P.W.D. Specifications (27` x 27`) 1040 Nos. 136.3 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
3 Supply, carriage and fixing of R.C.C lids Dia 21` 520 Each 135.86 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
4 Supply carriage and laying of 100 micron polythene under bed lining 13049.96 Sqm 13.23 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
Total in Figures 4 Construction of chamber for 100mm sluice plates item5 10 Nos
Quoted Rate in Figures
Quoted Rate in Words
Select, At Par, Excess (+), Less (-) IOCL
Tender Inviting Authority: Executive Engineer, MICAD Division, Fatehabad
Name of Work :- : Remodeling/Rehabilitation for lining of W/C At Outlet RD 6000-T New Bhattu Minor
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Item Description (HSR) Item Code / Make Quantity Units Estimated Rate in Rs. Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT in Rs. TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
1 Civil Work 1 Construction of chamber for 100mm sluices valve item1 10 1 Nos
1.01 [11.8.1]12 mm cement plaster of mix : 1. 1:4 (1 cement: 4 coarse sand) [Through Rate] 22440.55 Sqm 114 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
1.02 [14.1]Dressing bed and preparation of sub grade for lining by mechanical/ mannual means [Through Rate] 12467.39 Sqm 4 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
1.03 [21.95.5]Providing lowering cutting jointing and testing RCC pipe class NP3 as per IS-458-2003 with spigot and socketed joints manufactured with ISI marked sulphate resistance cement as per ISI 12330 with rubber rings ISI marked antiternmite as required at site in to trenches for all depths and laying out the same to correct alignment gradients and levels including dressing and trimming and cutting of concrete beds and side of trenches, if required jointing with rubber rings in trenches and jointing with 1:3/2 cement sand mortar and with end dowels filled with 1:3/2 cement sand mortar and finishing the joints at an angle of 45 degree with faces of spigot of socket joints cutting and finishing the cut surface to a uniform finish etc. as fully described in item No. 21.38, item 21.44, item 21.45, and item 21.46 including cartage loading and unloading complete in all respects. the internal diametric of the sewer being: 5. 600 mm [Through Rate] 60.97 Metre 2568 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
1.04 [4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate] 1621.55 cum 78 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
1.05 [4.33]Excavating, supplying and filling of local earth (including royalty) by mechanical transport up to a lead of 1 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. [Through Rate] 20114 cum 138 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
1.06 [5.23.2]Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 2. Nominal concrete 1:2:4 or leaner mix (i/c equivalent design mix) [Through Rate] 277.68 cum 1149 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
1.07 [5.7.4]Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 4. In cement mortar [Through Rate] 454.23 cum 585 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
1.08 [6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) [Through Rate] 62.18 cum 3476 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
1.09 [6.1.6]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) [Through Rate] 391.08 cum 2442 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
1.1 [6.30.5]Centering and shuttering including strutting, propping etc. and removal of form for 5. Lintels, beams, plinth beams, girders, bressumers and cantilevers [Through Rate] 171.52 Sqm 296 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
1.11 [6.33.3]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 3. Cold twisted bars [Through Rate] 6169.28 Kg. 68 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
1.12 [7.21.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) [Through Rate] 3264.39 cum 4128 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
Total in Figures 4 Construction of chamber for 100mm sluice plates item5 10 Nos
Quoted Rate in Figures Select
Quoted Rate in Words
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
BOQ_517126.xls
BOQ • 0.36 MB
OT0110318.pdf
Other Document • 0.88 MB
corrigendum60000bhattunew.pdf
PDF • 0.04 MB
Corrigendum1no.pdf
PDF • 0.11 MB
corrigendum8825.pdf
PDF • 0.04 MB
Corrigendum04062025.pdf
PDF • 0.05 MB
Corrigendum6noworks.pdf
PDF • 0.26 MB
corrigendum6000.pdf
PDF • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .