Tender Value
₹37.9 L
EMD Value
₹75,840
Closing Date
22 Oct 2022, 1:00 pmClosed
Executive Engineer JDA Division No.1
Executive Engineer JDA Division No.1, RHC, Jammu
Fencing of JDA Land, including fixing of JDA sign board by way of PCC poles and Barbed Wire under the jurisdiction of JDA Division No. I, Jammu.
2022_HAUDD_191415_1
JDA-I/2022-23/e-NIT/111 Dated 07.10.2022
Open Tender
Civil Works
Item Rate
365 days
Jammu
As Per SBD
3 documents required · 3 mandatory
₹2,000
Vice Chairman, Jammu Development Authority
₹75,840
Yes
12 Nov 2022
7 Oct 2022
22 Oct 2022
7 Oct 2022
22 Oct 2022
7 Oct 2022
Amount
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared
Excavating holes upto 0.10 cum, including getting out the excavated soil, then returning the soil as deported in layers not exceeding 20 cm in depth,including consolidating and deposited layer by ramming watering etc., disposing of surplus excavated soil as directed with in a lead of 50 Mtr and lift upto 1.5 m. All kind of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) Crushed
Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 meters (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post including cost of R.C.C. posts, struts, (earth work and concrete to be paid for separately) :- Payment to be made per meter cost of total length of barbed wire used. With G.I. barbed wire
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
Supply of labour for any other work as per the requirement at site(to be paid as per the actual)
Painting RCC poles/Boundary Pillars with synthetic enamel paints as the requirement of Deptt. Including writing of JDA or Khasra No.
Centering and shuttering including strutting, propping etc. and removal of form for: (Complete Job) Foundations, footings, bases of columns etc. for mass concrete
Lettering with black Japan paint of approved brand and manufacture
M/S ALPINE CONSTRUCTIONS
M/S SHINE CONSTRUCTIONS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .