EE PD JAUNPUR
EE PD JAUNPUR
Construction and maintenance work of vikas khand maharajganj ke gramsabha asaropur me vishwabharti school to brahman shekhapur pitch road tak link road including 05 years maintenance
2026_CEUVZ_1196992_8
3826/8A date 07-10-2026
Open Tender
Civil Works
Fixed-rate
180 days
JAUNPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹7.5 L
15 Oct 2026
15 Oct 2026
22 Oct 2026
15 Oct 2026
22 Oct 2026
15 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (including all taxes, labour cess etc but excluding GST.) | 7,000 | Cum | 73 | ₹5,11,000 |
| 2 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on preared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achive the desired denisty, complete as per Technical Specification clause 401. (including all taxes, labour cess etc but excluding GST.) | 470 | Cum | 2,818 | ₹13,24,460 |
| 3 | Cement Treated Subbase / Providing, laying and sperading Material on a prepared sub grade, adding cement @2% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base. / Quantity of cement as 2 percent of quantity by weight for subbase. (including all taxes, labour cess etc but excluding GST.) | 577.5 | Cum | 3,250 | ₹18,76,875 |
| 4 | Cement WBM Grading III / Providing, laying and spreading Material on a prepared sub base, cement @4 by weight to the spread material manually, mixing in place with rotavator and compacting with the road roller at OMC to acheive the desired unconfined compressive strength and to form a layer of sub base/base. (including all taxes, labour cess etc but excluding GST.) | 819.38 | Cum | 3,850 | ₹31,54,593.75 |
| 5 | Providing and applying Tack coat with bitumen (VG-10) using emulsion distributor at the rate of 0.30 kg per sqm on the prepared bitumen surface cleaned with Hydraulic broom as per Technical Specification clause 503. Including cost of material, Bitumen & Labour cess etc but Excluding GST. | 9,000 | Sqm | 24 | ₹2,16,000 |
| 6 | Providing laying and rolling of Open-graded premix surfacing of 20 mm compacted thickness composed of 13.20 mm to 11.20 mm sizes of aggregates mix Ratio 2:1 either using pnetration grade bitumen or emulsion to the required line grade and level to serve as wearing course on a previously prepared base. including mixing in a suitable plant, laying and rolling with a three smooth wheeled roller 80-100 tonne capacity, and finishing to required level as per Technical Specification clause 508. Including cost of material, Bitumen & Labour cess etc but Excluding GST. | 9,000 | Sqm | 240 | ₹21,60,000 |
| 7 | Providing laying and Seal coat sealing the voids in a bitumenous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification clause 510. Including cost of material, Bitumen & Labour cess etc but Excluding GST. | 9,000 | Sqm | 88 | ₹7,92,000 |
| 8 | Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (including all taxes, labour cess etc but excluding GST.) | 1,050 | Cum | 62 | ₹65,100 |
| 8.1 | The routine maintenance of road Gram sabha Asaropur me Vishwabharti School se Brhaman Sekhpur pitch road tak Sampark marg. road including embankment, Patri, Road Sides, Cross Drains Hume Pipe Culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. including cost of material T&P labour cess, etc. but Excluding cost of GST ) For 1st Year maintenance Cost | 2.4 | Km | - | - |
| 8.2 | The routine maintenance of road Gram sabha Asaropur me Vishwabharti School se Brhaman Sekhpur pitch road tak Sampark marg. including embankment, Patri, Road Sides, Cross Drains Hume Pipe Culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. including cost of material T&P labour cess, etc. but Excluding cost of GST ) For 2nd Year maintenance Cost | 2.4 | Km | 31,562.59 | ₹75,750.22 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.55 MB
BOQ_2261542.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .