| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.6 CrAccepted-AOC AT COLLEGE ROAD P O SOUTH BALANDA TALCHER PS COLLIIRRY TALCHER DIST ANGUL ODISHA PIN CODE 759116 | TALCHER | ANGUL | ODISHA | 759116 | ₹16.6 Cr | L1 | Accepted-AOC Awarded being the L1 bidder. |
| 2 | L2₹23.3 CrRejected-Finance AT KOTASAHI KAIRAPARI TANGI DIST CUTTACK | CUTTACK | CUTTACK | ODISHA | ₹23.3 Cr | L2 | Rejected-Finance Rejected not being the L1 bidder. |
Tender Value
₹22.9 Cr
EMD Value
₹28.6 L
Closing Date
23 Nov 2022, 5:00 pmClosed
Sri Sambit Pattnaik
MCL.Jagriti Vihar. Burla. Dist.-Sambalpur. PIN-768020. Odisha. Contact No.9438494886.9437485368. 0663-2542779.
Construction of internal concrete road for coal transportation at different location of Lingaraj OCP, Lingaraj Area
2022_MCL_261096_1
MCL/Samb/Civil-TC/e-Tender /22-23/16 dt.01.11.22
Open Tender
Civil Works - Roads
2005 days
Lingaraj OCP of Lingaraj Area MCL
Please refer Tender documents.
5 documents required · 5 mandatory
₹28.6 L
20 Dec 2022
3 Nov 2022
25 Nov 2022
3 Nov 2022
23 Nov 2022
4 Nov 2022
3 Nov 2022 - 12 Nov 2022
Amount
Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 metres. (Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location with all lifts and lead upto 1000m as per relevant clauses of section - 300 of specifications)
Embankment Construction with Material Obtained from Borrow Pits (Construction of embankment with approved material having CBR>7 obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-1, 300-2 and as per relevant clauses of section - 300 )
Granular Sub-base with Well Graded Material (CBR>30 or more) (Table:- 400-1 & Table 400-2). Construction of granular sub-base by providing well graded material like natural sand crushed gravel or crushed stone having CBR >30, spreading in uniform layers with motor grader on prepared surface, mixing by plant mix method at OMC, and compacting with vibratory rollers of 80 to 100 kN static weight to achieve the desired density, complete as per Clause 401 of Specification. for grading- I Material
Granular Sub-base with Well Graded Material (CBR>30 or more) (Table:- 400-1 & Table 400-2). Construction of granular sub-base by providing well graded material like natural sand crushed gravel or crushed stone having CBR >30, spreading in uniform layers with motor grader on prepared surface, mixing by plant mix method at OMC, and compacting with vibratory rollers of 80 to 100 kN static weight to achieve the desired density, complete as per Clause 401 of Specification. for grading- III Material
Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 26.5 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing as per clause 601 of specifications complete in all respect.
Cement Concrete Pavement ( Construction of un-reinforced, dowel jointed, plain cement concrete pavement (minimum flexural strength - 4.5 Mpa) over a prepared sub base with cement @ 400 kg per cum (minimum), coarse and fine aggregate conforming to IS 383,maximum size of coarse aggregate not exceeding 31.5 mm, mixed in a batching and mixing plant as per approved mix design,transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, admixtures as approved, curing compound, finishing to lines and grades as per drawing as per IRC 15 2011 and as per relevant clauses of section 602 of specifications complete but excluding cost of steel in dowel bar and tie rods etc.
Supplying, fitting and placing Mild steel reinforcement complete in substructure as per drawing and technical specification and as per relevant clause of section 1600
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications and as per relevant clause of section 1600
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete.
Providing and laying Non Pressure NP-3 class (Medium duty) R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete: 1200 mm dia RCC pipes. (Laying by manual/ machanical means)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Total impact of GST for the purpose of CTC
SRI DURGA CONDEV PVT LTD
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid