Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance B 22 2ND FLOOR HIMALAYA HOUSE 23 K G MARG CANNAUGHT PLACE NEW DELHI 110 001 | NEW DELHI | DELHI | 110001 | Admitted-Finance |
| 2 | Admitted-Finance OFFICE 4 LEVEL 7 M AGILE BANER ROAD BANER PUNE PUNE MAHARASHTRA 411045 | PUNE | MAHARASHTRA | 411045 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Rejected-Technical | Rejected-Technical Not meeting BQC of NIT |
Tender Value
Refer Docs
EMD Value
₹84.6 L
Closing Date
10 Oct 2023, 3:00 pmClosed
SANKHA PANDA
SANKHA PANDA, A4, SECTOR 1, NOIDA
STRUCTURAL ERECTION ABOVE GROUND PIPING FABRICATION AND ERECTION, EQUIPMENT ERECTION PIPING AND EQUIPMENT INSULATION AND OTHER ASSOCIATED MISCELLANEOUS WORKS FOR INTERCONNECTING PIPERACK PACKAGE C1 FOR NREP PROJECT AT NUMALIGARH REFINERY ASSAM
2023_NRL_767880_1
TPIL/CONS/NRL/082176C/048
Open Tender
Construction Works
540 days
NUMALIGARH REFINERY ASSAM
AS PER NIT
6 documents required · 6 mandatory
₹0
₹84.6 L
Yes
MS TEAMS ONLINE
4 Jan 2024
22 Aug 2023
11 Oct 2023
22 Aug 2023
10 Oct 2023
21 Sept 2023
22 Aug 2023 - 29 Aug 2023
31 Aug 2023
Amount
SRUCTURAL STEEL
Receipt of Structural Materials from OWNER's Store / Storage yard , loading, local transportation up to either Contractor's storage yard / erection site,unloading, assembly, erection, alignment, bolting / welding of Fabricated Structural Steel Elements / Structural Modules in position along with fixing of all type of Connection Bolts (Erection, Hot Dip Galvanised/Non-Galvanised Permanent bolts), shim plates, as per Specifications, Layouts and Fabrication Drawings released for IFC. Scope includes erection of all types of steel structures, pipe racks, pipe bridges, shelters, platforms, structural supports, steel supports inside buildings, etc., Scope shall include all activities like Bolting, Welding, Aligning, making necessary alterations caused due to mismatch of Bolt Holes and / or during fabrication, mechanical / Electrical / Pneumatic Torque Tightening of Bolts, cleaning, giving final touch up paint (specification TP-1ZZZA-PI-SPE-0003) where ever required as per specification to the welded/fabricated parts or damage during transportation and erection, etc as required complete in all respect. All Electrodes shall be in Vacuum packed with a demarcation "H4R". Making necessary arrangement of required labour, equipment, tools & tackles, Cranes, Manlift, steel scaffolding, consumables, transport, etc to execute the works at all heights as per drawings and specifications along with all related works in order that the Structure is handed over to the complete satisfaction of the Engineer-in-charge. (Exclusions: Erection of steel flooring, ladders, stairways, and handrails). Permanent connection Bolts shall be supplied as Free Issued Material to the Erection Contractor. However, Contractor to supply Temporary erection Bolts and shim plates within the quoted Price for erection. Measurement shall be done as per AFC Fabrication drawing Net weight. Weight of Tempoary erection bolts shall not be considered for payment.
Supply and Fabrication as per TP-1ZZZA-CV-SPE-0021 and as per AFC drawings provided, surface preparation and Painting as per Painting Specification TP-1ZZZA-PI-SPE-0003 Table-11 and installation of Structural Steel including plates etc. for Miscellaneous activities wherever required. Measurement shall be As per AFC Fabrication Drawings net weight reports. No wastages considered
Receipt of Strucrual steel materials (including gratings, handrails and ladders) supplied by steel fabricator and Unloading at OWNER's Storage yard.
HANDRAIL
Receipt of Fabricated Materials from OWNER's Store / Storage yard, loading, local transportation up to Contractor's store / erection site, unloading, assembly, Erection of already fabricated and painted Handrails as per requirements indicated in Standard Drawings, IFC Layouts and Fabrication Drawings. Scope shall include all activities like fixing of all type of Connection Bolts (Erection, Hot Dip Galvanized/Non-Galvanized Permanent bolts) as per Specifications, Welding, Aligning, making necessary alterations caused due to mismatch of Bolt Holes, Torque Tightening of Bolts, cleaning, giving final touch up paint as per specifications to the welded / fabricated parts, etc as required complete with all tools and tackles , equipment and labour, for all and heights along with all related works in order that the Structure handrails is handed over to the complete satisfaction of the Engineer-in-charge. Permanent connection Bolts shall be supplied as Free Issued Material to the Erection Contractor. However, Contractor to supply Temporary erection Bolts and shim plates within the quoted Price for erection. Supply of erection nuts and bolts / fasteners are included in this item. Measurement shall be As per AFC Fabrication Drawings Net weight.
For straight handrail
For stair case/inclined handrail
For circular handrail
For Davit
LADDERS/ CAGE / SAFETY GATE/ SAFETY BARRIER ERECTION
Receipt of Materials from OWNER's Store / Storage yard , loading, local transportation up to Contractor's store / erection site, assembly, Erection of already fabricated and painted Ladders/Safety Cage/Safety gates/Chains with or without cage along with fixing of all type of Connection Bolts (Erection, Hot Dip Galvanized/Non-Galvanized Permanent bolts), Safety Gate, all as per Specifications, Layouts and fabrication Drawings. Scope shall include all activities like Bolting, Welding, Aligning, making necessary alterations caused due to mismatch of Bolt Holes, Torque Tightening of Bolts, cleaning, giving final touch up painting as per specifications to the welded parts, etc. as required complete with all tools, equipment and labour, for all heights along with all related works in order that the Structure is handed over to the complete satisfaction of the Engineer-in-charge. Permanent connection Bolts shall be supplied as Free Issued Material to the Erection Contractor. However, Contractor to supply Temporary erection Bolts and shim plates within the quoted Price for erection.
Same as above and Ladder and cage
Same as above and Safety gate / chains
Supply, Fabrication & Erection of Structural Steel Materials for Safety Barriers / Gates (as per standard TP-1ZZZA-CV-SDD-0003 Galvanized and painted) which are provided at the Entrance of Platforms at any height or location including galvanized surface preparation, painting as per Specification & transportation to erection site / laydown area complete in all respects. Supply and fixing of all type of Connection Bolts (Erection, Hot Dip Galvanised/Non-Galvanised Permanent bolts) as per Specifications, Layouts and fabrication Drawings. Scope shall include all activities like Bolting, Welding, Aligning, giving final touch up painting as per specifications to the welded /fabricated parts, etc. as required complete with all tools, equipment and labour, for all depths and heights along with all related works in order that the Structure is handed over to the complete satisfaction of the Engineer-in-charge. Measurement shall be As per AFC Fabrication Drawings net weight reports. No wastages considered
SUPPLY & ERECTION OF BLIND FLOOR
Supplying all Materials (M30 Grade Reinforced Concrete with Fe500D Rebars and admixtures & corrosion inhibitors , CGI Deck Sheets, Shear Lugs, etc) as required related to Blind Floors and Installing the same as per Construction Drawings, Specifications at any elevations (20m to 30m approx) and / or as Directed by Engineer-in-charge all complete for Blind Floor below Air Coolers or for any other Requirement in any type of Structures, complete in all respects including Manpower, Consummables, materials, Construction Equipment, Tools & Tackles, Scaffolding etc.
CGI Deck Sheet of thickness 2.0 mm
Concrete Grade M35 with Admixtures and Corrosion Inhibitors (Slab thickness 100 to 150mm)
Reinforcement Of Grade Fe 500D Uncoated Bars
SUPPLY, FABRICATION & ERECTION MS CHEQUERED PLATE
Supplying MS chequered plate (5 mm to 10 mm thickness), transporting, fabricating, fixing at various levels with help of supports cleat/stiffeners on floors, platforms, stairs, including grinding edges & supplying all bolts, nuts, washers etc., including necessary modification for supporting structure, drilling holes in plates and supporting structure including one coat of inorganic Zinc Silicate primer(Avg. 75 micron thickness), including forming cutouts in chequered plates and reinforcing edges by M.S.strips; providing toe plate of 100x5 mm height all along the edges, complete as per drawing, specifications & as directed by Engineer in Charge.
ERECTION OF GRATING
Receipt of Materials from OWNER's Store / Storage yard, loading, local transportation up to Contractor's store / erection site, unloading, Erection of Prefabricated and painted/Galvanized flooring/Grating for all types of platforms and as per standard drawings and/or specifications, fixing in line or level, including toe gaurd, bolting and or stich welding as necessary ( Ref: TP-1ZZZA-CV-SDD-0003_D2), incorporating cut-outs where shown in drawings, painting as specified and wherever required, repairs of damaged surface coat after erection, complete with all tools, equipment and labour, for all depths and heights as per drawings and as directed by Engineer-in-Charge. Inspection and testing. Surface as measured on IFC drawing. Openings shall not be deducted if lower than 0.09 m². Cut Outs above 300mm is in the scope of Structural Steel Fabricator Scope. Below 300 mm size, cut out shall be done by Structural erection Contractor as per relevant standard within quoted Price for Grating Items.
For Square/rectangular Gratings
For Circular/Curved Gratings (equipment platform)
Supplying, erecting and fixing of electroforged hot dip galvanised MS self colured 100x5 mm flat (IS2062 Gr.BR) conforming to standards, as edge protection member for openings in Gratings made at site by contractor, all complete as directed by Engineer in charge.
Receipt of Materials from OWNER's Store / Storage yard / loading, local transportation up to Contractor's store / erection site, Erection of Treads made up of Gratings as prefabricated panels including delivering the same to the actual site of execution. Scope shall include all activities like Supply and fixing of all type of Connection Bolts (Erection, Hot Dip Galvanized/Non -Galvanized Permanent bolts) as per Specifications, Welding, Aligning, making necessary alterations caused due to mismatch of Bolt Holes, Torque Tightening of Bolts, cleaning, giving final touch up paints as per specifications to the welded parts, etc as required complete with all tools, equipment and labour, for all depths and heights along with all related works in order that the Structure is handed over to the complete satisfaction of the Engineer-in-charge.
For Stair Tread of 900X275 mm
For Stair Tread of 750X275 mm
ROOFING & SIDE CLADDING
Supply and installation For roofings (0.50 mm Base metal thickness)
Supplying and fixing 2 mm thick Polycarbonate translucent sheets of appropriate shape and corrugation to suit roof profile of sheets including self drilling screws, nuts, washers, etc., complete as specified and directed by Engineer in Charge.
Supply and installation For wall claddings, side cladding (0.50 mm Base metal thickness)
Supply and installation of Fixed frame S-type Louvre PANELSs
Supply and installation of Flashing and accessories
Supplying, cleaning, straightening, bending if required, and fixing "Eaves Gutters" of thickness minimum 1(One) mm of Precoated colored Steel sheets with alloy of zinc and aluminium material and to required slope as per drawings including accessories like polyester coated G.I. self drilling self tapping screws having caps matching to suit sheet colour EPDM seals, flashings and all gutter fittings such as drop ends, stop ends, spacers, laps, etc. complete with silicon sealants as per specifications and as directed by Engineer in Charge. (Contractor shall submit detailed drawings and samples for approval)
Supplying, cleaning , straightening, bending if required and fixing "Profiled Ridge Capping/ Single Ridge capping/ Apron / Barge capping/ expansion joint capping" of material to suit the roof sheets with necessary polyester coated G.I. self drilling screws and self drilling stitching screws having caps matching to suit sheet colour and EPDM seals, complete with flashings and silicon sealants as required, as per drawings, specifications and as directed by Engineer in Charge.
Supplying and fixing MS Gutter straps 40 mm wide x 6 mm thick with polyester coated G.I.fasteners, EPDM seals etc., complete as per drawing, specifications and as directed by Engineer in Charge
Supplying, cutting, jointing and fixing in position ( both in concrete & masonary) PVC rain water pipe of specified diameter jointed with bonding solution of approved quality and make with pressure rating of 4kg/cm2 including tools & labor, clamps, connections etc. all as per approved manufacturer's details
for 110mm diameter PVC pipe
for 160mm diameter PVC pipe
NON-SHRINK GROUT
Supply and laying of Non-shrink cementitious grout for grouting of base plates, under base frames or other anchoring elements for structures and/or machines, including roughening & cleaning of surfaces, form-works, chamfering of edges, smoothing of exposed surfaces, Curing, making flush to the existing RCC surface by chipping & finishing, RCC surface to be made wet for 24 hrs. before grouting, providing all tools and labour necessary to complete the work as per drawings and approved manufacturer’s specifications and as per the directions of Engineer-in-charge. Volume measured on IFC drawings.
Non-shrink cementitious grout GP1/GP2 as per approved Vendor List, Drawings and Specifications
Non-shrink Epoxy grout as per approved, Vendor List, Drawings and Specifications
ORDINARY CEMENT SAND GROUT
Supply and laying of Ordinary Cement Sand grout (1:2) under base plates of cross- overs, short pipe supports (not exceeding 1.5 m height) and small operating platforms (not exceeding 2.0 m height) not supporting any equipment, temporary structure like Barricading (height not exceeding 10m), including roughening & cleaning of surfaces, form-works, chamfering of edges, smoothing of exposed surfaces, Curing, making flush to the existing RCC surface by chipping & finishing, providing all tools and labour necessary to complete the work as per drawings and approved manufacturer’s specifications and as per the directions of Engineer-in-charge.
SUPPLY & APPLICATION OF FIREPROOOFING FOR STRUCTURAL STEEL
Fireproofing for steel structures/ equipment saddles, etc
Supplying and Applying all types of Fireproofing (Vermiculite Based/ in-situ Concrete/ Sprayed Mortar) as per design basis TP-1ZZZA-CV-BOD-0001 and Specifications NR-0ZZZZ-CV-SPE-0006, Drawings and Standards for any steel element wherever required, such as columns, beams, wind-bracing, girders, equipment legs, skirts and saddles at any height, either “box” or “contour shaped”, including form-works, supply and installation of reinforcement mesh, (Exlusions : nut welding and primer painting on structural / equipment surface) including welding of any missing nuts, expanded metal sheet/ lath, nuts, fixing of cover plate (MS edge angle) at both side of top exposed structural beam, cover blocks and hooks, studs, mastic sealing between the Fireproofing edges and the structural steel elements all complete including mobilising/ demobilizing all tools, equipment and labour as required to complete the work to the satisfaction of Engineer-in-Charge. Including Painting over Fireproofed Surfaces (For both Vermiculite and in-situ Concrete/ Sprayed Mortar Fireproofed Elements): Supplying and Applying of Painting over Fireproofed Surfaces after full curing (minimum gap of 28 days) of all types of Fireproofing applied. The Base Coat shall be a sealer coat of Epoxy Polyamide @ 50 – 75 micron DFT. The Finish Coat shall be of two coats of Acrylic Elastomeric or Polyurethane coating @ 100 – 125 micron DFT per coat. The Finish Coat shall be UV resistant coating system (No 1 of NORSOK standard M-501). The Coating System shall be compatible and approved by the Fireproofing Material Vendor. Fireproofing is including of painting on top surface, application of sealant, fixing of cover plate etc. Inspections and Tests as per relevant technical specifications and codes shall be deemed to be included in the scope Measurement for Fireproofing: Volume measured on IFC drawings, less the volume of the structure profiles. Coating section type shall be as follows (unless otherwise specified) -Box type, for steel sizes up to max 300 mm. of Sectional Depth. -Contour shape type, for steel sizes bigger than 300 mm.
In-situ Cement Concrete (Grade M30) Fireproofing for steel structures, Equipment legs/ saddles
Sprayed mortar Fireproofing for steel structures, Equipment legs/ saddles
Vermiculite Based Fireproofing for steel structures, Equipment legs/ saddles
Epoxy Intumescent coating
Structural Modification Works MISCELLANEOUS CUTTING/WELDING WORKS (Not applicable for regular works as per issued drawings but applicable only for specific re-works/ modification works / Miscellaneous works as per directions of E-i-C where reasons for Modification are not attributable to Contractor)
Structural steel dismantling
Gas cutting in Structural beams,plates etc
Grinding in Structural beams, plates at cutting locations etc
Welding in Structural beams,plates etc
Surface Preparation and Painting as per Specification
Re-erection of Structural Steel
Straightening at grade and/ or in position
chipping, cleaning at grade and/ or in position
Steel Fabrication / Welding at grade and/ or at Elevation
Supplying & applying finish coats for all heights including cleaning the surface of dust and loose particles, touching up of damaged primer coat, including all labour, scaffolding, tools, consumables, etc., as per structural steel paints specifications,(TP-1ZZZA-PI-SPE-0003),drawings and as directed by Engineer in Charge.
To surface of structural steel
To Handrailing
Galvanising by Paint any type of already fabricated structural steel member / element / Accessories like ladders, Handrails, Stairs, etc by using any method as required by the specifications, drawings and / or Engineer-in-charge and handing over the elements / modules in a ready to erect stage.
Supplying, fabrication, erecting and fixing of Galvanized MS Toe Guard conforming to standards / design sketch as edge protection member where ever required, all complete as directed by Engineer in charge.
MECHANICAL AND CHEMICAL ANCHORS
Supply and installation of expansion bolts type under cut/wedge anchors of Grade 8.8 Galvanized as per drawings, including the cost of the bolts, carting the same to site of work, fixing in position with necessary, tools, labour etc for all heights and depths, drilling holes and fastening as per vendor’s specifications, all complete and as directed.
Supply and installation of Insert Plates
Supply and installation of Mechanical Bolts -M12x125/30 (Under Cut anchor) or equivalent
Supply and installation of Mechanical Bolts - M16x190/40 (Under Cut anchor) or equivalent
Supply and installation of Mechanical Bolts - Heavy duty wedge anchors M12x25 or equivalent
Supply and installation of Mechanical Bolts - Heavy duty wedge anchors M16x25 or equivalent
Supply and installation of Mechanical Bolts - Heavy duty wedge anchors M20x30 or equivalent
Supply and installation of Mechanical Bolts - Heavy duty wedge anchors M24x30 or equivalent
Supply and installation of chemical bolts type Injectable adehesive anchors and capsule adhesive anchors of Grade 8.8 Galvanized as per drawings, including the cost of the bolts, nuts, washer, adhesive capsule carting the same to site of work, fixing in position with necessary, tools, labour etc for all heights and depths, drilling holes, anchor rods (HST) with nuts and washers, and fastening as per vendor’s specifications, complete and as directed
Supply and installation of Chemical Anchor Bolts - Rod M12X160 (threaded rod) & Adhesive Capsule M12x110
Supply and installation of Chemical Anchor Bolts -Rod M16X190 (threaded rod) & Adhesive Capsule M16x125
Supply and installation of Chemical Anchor Bolts - Rod M20X240 (threaded rod) & Adhesive Capsule M20x170
Supply and installation of Chemical Anchor Bolts - Rod M24X290 (threaded rod) & Adhesive Capsule M24x210
Installation of expansion bolts M 24/200 anchors of Grade 8.8 Galvanized
Drilling of holes square or circular up to 32 mm dia and depth 1000 mm, through reinforced concrete floor or wall and make good complete as directed by Engineer in Charge.
RCC Core cutting of dia 150 mm / 200 mm and depth upto 1200 mm
BARRICADING
Supplying, fabricating structural temporary movable barricading with primer painting as per standards/specifications/drawing to use at site where ever reqired as directed by Engineer in Charge.
PIPING WORKS FOR PROCESS UNITS & OFFSITES & UTILITIES
PIPING (ABOVE GROUND) : - Receipt of free issued Materials, transportation of all piping item(s) from Owner's storage point to worksite/work shop; fabrication including cutting, edge preparation, (inclusive of grinding the edges of pipe, fittings, flanges, Graylock Flanges, etc. to match with the mating edges of uneven/different thickness wherever required), For galvanized pipings - Surfaces where galvanizing is burnt-off shall be wire-brushed and cold galvanized with zinc-coating compound.1” wide PTFE tape may be used in the threaded joints.; Graylock Flanges, clamps seal rings, Locking arrangement for valves (CSO, CSC, LO, LC): fitup, bending, preheating wherever required, welding, threading, and laying of pipes of all types and thickness over Sleepers, overhead on racks and at all elevations, connecting with equipment nozzles, strainers, sight glass, steam traps, expansion bellows, orifice assemblies, spray nozzles, rotameters, mixer, special piping inline items, mixer, tappings for pressure gauges, thermowells, sample connections, springs, sample coolers, purging panels and associated tubing, pressure relief valves, desuperheater etc. and fixing of gaskets, bolts, nuts including application of torque wherever required & all other inline instruments, and fittings , like elbows, reducers, tees, vents, drains, SW/threaded valves upto 1.5 NB, Steam Supply/ Condensate Recovery stations (Cast/ Fabricated), alignment, Fixing and welding of RF pad measured as 1.5 Times of mother pipe, cleaning & flushing loop wise and system wise by water/Chemical/compressed air, hydrostatic, pneumatic, vacuum, spark testing , reinstatement, card board blasting, leak test, inertization, hot bolting if required and any other type of testing as specified,
FABRICATION
CARBON STEEL (INCLUDING LTCS & BRONZE VALVES) PIPING (NON IBR);THK. <= 10MM
NB UPTO 24 INCH
NB 26 INCH - 30 INCH
CARBON STEEL (INCLUDING LTCS & BRONZE VALVES) PIPING (NON IBR);THK. > 10MM AND <= 20MM
NB 2 INCH - 24 INCH
CARBON STEEL (INCLUDING LTCS & BRONZE VALVES) PIPING (NON IBR);THK. > 20MM AND <= 30MM
NB 16 INCH - 24 INCH
CARBON STEEL PIPING (NACE);THK. <= 10MM
NB UPTO 24 INCH
NB 26 INCH - 30 INCH
CARBON STEEL PIPING (NACE);THK. > 10MM AND <= 20MM
NB 2 INCH - 14 INCH
NB 32 INCH - 48 INCH
CARBON STEEL PIPING (IBR);THK. <= 10MM
NB UPTO 14 INCH
NB 16 INCH - 24 INCH
CARBON STEEL PIPING (IBR);THK. > 10MM AND <= 20MM
NB 2 INCH - 14 INCH
NB 32 INCH - 48 INCH
CARBON STEEL PIPING (H2);THK. <= 10MM
NB UPTO 6 INCH
ALLOY STEEL PIPING (IBR);THK. <= 10MM
NB UPTO 6 INCH
ALLOY STEEL PIPING (IBR);THK. > 20MM AND <= 30MM
NB 8 INCH - 14 INCH
NB 16 INCH - 24 INCH
NB 26 INCH - 30 INCH
STAINLESS STEEL PIPING (NON IBR);THK. <= 10MM
NB UPTO 6 INCH
NB 8 INCH - 14 INCH
CARBON STEEL PIPING (GALVANISED); 3" AND BELOW (THREADED ENDS - Seal weld ); THK. <= 10MM
NB UPTO 3 INCH
CARBON STEEL PIPING (GALVANISED); 4" AND ABOVE (BUTTWELDED ENDS); THK. <= 10MM
NB 4 INCH - 6 INCH
NB 8 INCH - 14 INCH
CARBON STEEL PIPING (Internal Epoxy Coated);THK. <= 10MM
NB 2 INCH - 14 INCH
CPVC PIPING;THK. <= 10MM
NB UPTO 6 INCH
ERECTION
ALL MATERIALS;THK. <= 10MM
NB UPTO 14 INCH
NB 16 INCH - 30 INCH
ALL MATERIALS;THK. > 10MM AND <= 20MM
NB 2 INCH -14 INCH
NB 16 INCH - 24 INCH
NB 32 INCH - 48 INCH
ALL MATERIALS;THK. > 20MM AND <= 30MM
NB 8 INCH - 14 INCH
NB 16 INCH - 30 INCH
INSTALLATION OF STRAINERS (ALL TYPES AND ALL RATINGS)
Steam Tracing of Pipes / Instruments : Fabrication and Erection of Steam tracing lines including cutting, edge preparation, Cold/Hot Bending, welding, branch connections, vent, drains, instrument & sample point connections, traps, strainers, fabrication and erection of related supports and connection accessories, connecting with steam manifolds and installation of steam traps including isolation valves, terminating up to the drain points/funnel, hydrotesting, Steam purging, flushing and box-up etc using Pipes, Tubes / Pre-insulated tubes as per direction of Engg in charge. Necessary welding qualification tests shall be carried out as part of this work. Piping, Tubings, Pre-insulated tubings and Fittings shall be Free issue to Contractor. All Other Accessories required for the Steam tracing activities shall be in Contractor scope. Steam/Condensate Manifolds : Taking delivery of material at warehouse, handling, Installation of steam/ condensate manifold, providing of supports, pedestals welding, making ready for hook-up in all respect including marking for tracers identification, Fabrication and erection of necessary supports. Manifolds shall be Free issue to Contractor.
The listed below following activities are also to be performed by contractor. a) Taking delivery from warehouse or from the place(s) of storage, handling, loading and unloading, unpacking, on site transportation, Surface preparation of process piping, Dirt, rust and scale removal with a wire brush. Oil and grease films may be removed with a rag and suitable solvent, Making necessary connections with manifolds, steam traps etc as per manifold location plan . Scope also includes the transportation of all loose supplied items from warehouse or place of storage to the site location. b) Installation of the steam tracing in the correct position as per tracing layout drawing/ vendor drawing & fixing the tracing in position as per details as per specification NR-0ZZZZ-PI-SPE-0005. c) Installation & connection of those items supplied loose. d) Supply and Application of heat transfer compound, Tracer Bonding with heat transfer cement, heat sheets, heat reflective foil wrap, polymer outer jackets,metallic straps for tracer supporting, patch kits (Intermediate patch kit, bending patch kit, end patch kit), weather proofing, ferrule fittings, spacers, tube bundles, supporting of manifolds as required, supporting (rest, guide & anchoring) of steam tracing wherever required by using primary or secondary steel. Consider Steam Tracing Pipes, Tubes , Preinsulated tubes of Dia upto 1". e) Measurement for payment under this item shall be as per running metre length of Tracer installed at site, irrespective of tracer pipe size. d). Providing steel scaffolding, all tools, tackles, equipments etc., labour, supervision and completing the work in all respect, at all heights as per drawings, specifications and instructions of Engineer-in charge.
All Types of Valves such as Gate, Globe, Check, Butterfly, Ball, Plug, control, On-Off, safety valves, R.O. valves, control valves, PSV, TSV up to # 600 class
NB. 0.75 INCH
NB. 2 INCH
NB. 3 INCH
NB. 4 INCH
NB. 6 INCH
NB. 8 INCH
NB. 10 INCH
NB. 12 INCH
NB. 14 INCH
NB. 16 INCH
NB. 18 INCH
NB. 20 INCH
NB. 26 INCH
NB. 28 INCH
Bolt Tensioning - Carrying out controlled hydraulic tensioning/tightening of bolted joints on all types of piping as called for in specification TP-1ZZZA-PI-SPE-0005 on already erected system including carrying out alignment of flanges, cleaning of flange surface, supply of all materials for Bolt tensioning, , recording devices, instruments etc; Providing all necessary normal and special equipment, tools & tackles and gadgets, skilled / unskilled labour, specialist, supervisory staff and completing the work in all respects as per specifications and instructions of engineer-in-charge. Some joints may require bolt tensioning more than once, but, payment for one joint shall be made only once. Quoted price also includes requirement of scaffolding, working platforms and all consumables as required for this work. Bolt Tensioning works includes pipeline flanged joints, pipeline to vessel joints including manway covers to girth flanges, equipment joints, tie in joints flange with other related jobs and package vendors at all elevations. Measurement shall be on the basis of no. of flanged joints / pair of flanges.
150# JOINTS
NB. 14 INCH
NB. 16 INCH
NB. 18 INCH
NB. 20 INCH
NB. 26 INCH
NB. 28 INCH
NB. 30 INCH
300# JOINTS
NB. 10 INCH
NB. 12 INCH
NB. 14 INCH
NB. 16 INCH
NB. 18 INCH
NB. 20 INCH
600# JOINTS
NB. 8 INCH
NB. 14 INCH
NB. 18 INCH
NB. 20 INCH
NB. 26 INCH
Dissimilar Welding
Dissimilar Welding between SS and CS
Dissimilar Welding between AS and CS
Dissimilar Welding between SS and AS
NON DESTRUCTIVE TESTING
RADIOGRAPHY: - Performance of radiographic inspection on piping of all types & thickness including providing or hiring of all necessary equipment and whatever else even though not explicitly mentioned but required to perform the work as per specifications (NR-0ZZZZ-PI-SPE-0006) and instructions of Engineer-in-charge. Rates are inclusive of radiography machine, manpower, consumables etc. and all other equipments required to perform the radiography at all heights including staging Scaffolding to the satisfaction of Engineer-in-charge. Radiographs shall be submitted to the Engineer-in-charge. (Repeat Radiography due to defective radiograph on repaired joints due to Contractor's fault and for additional radiography necessitated due to poor performance of contractor's welders shall be done at contractor's cost and nothing shall be paid as extra)
Film Radiography by Gamma rays / X Rays
Radiography using Close proximity method with using Selenium (Se 75) source / Equivalent source.
Radiography by Digital Method
DYE PENETRATION/ MAGNETIC PARTICLE TEST : - Performance of Magnetic particle/ dye penetrant test including supply of all necessary materials; equipments and labour for carrying out the work as per specification and directions of Engineer-in-charge.
DYE PENETRATION TEST
MAGNETIC PARTICLE TEST
WET FLOURESCENT MAGNETIC PARTICLE TEST
ULTRASONIC TESTING
Ultrasonic Testing by Advance Method (PAUT). Contractor shall ensure interpretaion of PAUT through NDT Level-III Inspector.
STRESS RELIEVING : - Carrying out stress relieving of weld joints on all types of piping as called for on shop/site fabricated already erected system including supply of materials, consumables, recording devices, insulation materials, all electrical boards with safety devices safety equipments, instruments etc. providing all normal & special equipment and gadgets, skilled / unskilled labour, specialist, supervisory staff and completing the work in all respects as per specifications and instructions of Engineer-in-charge. Repeat performance due to defective stress relieving or any other account shall be on Contractor's cost (Payment shall be done only after submission and approval of charts. Stress relieving shall be followed by measurement of hardness and no separate payment shall be made for this). Note: Unit for stress relieving quantity is ' Nos. of circumferential weld joints'
NB. 0.5 INCH
NB. 0.75 INCH
NB. 1 INCH
NB. 1.5 INCH
NB. 2 INCH
NB. 3 INCH
NB. 4 INCH
NB. 6 INCH
NB. 8 INCH
NB. 10 INCH
NB. 12 INCH
NB. 14 INCH
NB. 16 INCH
NB. 18 INCH
NB. 20 INCH
NB. 24 INCH
NB. 26 INCH
NB. 40 INCH
HOT INSULATION (Supply & installation) : - Providing thermal insulation including supply of all insulating and ancillary materials, vapour barrier, weather protective coverings, consumables and other necessary materials (including supports, clamps, ancillary materials for complete installation of Insulation), testing of materials as required, including transportation of materials to work site, duly inspected by TEN inspector at manufacturer's shop & sample check/inspection at site by TEN Constructhe on, binding, tying, lacing, stitching and/or otherwise securing, finishing with sheet cladding as per spec, providing bolts, rivets and self tapping screws wherever specified, providing inspection windows, end seals for flanges etc., colour coding and identification. Providing steel scaffolding, all tools, tackles, equipments etc., labour, supervision and completing the work in all respect, at all heights as per drawings, specifications NR-0ZZZZ-PI-SPE-0003 and instructions of Engineer-in charge. Contractor scope also includes Supply and Installation of Removable weather shield cover, All material required for weather shielding for flanged joints and pipe including job at site with all required tools to perform job shall be in contractor scope, Job shall be performed as per standard NR-0ZZZZ-PI-SPE-0003. Measurement method for insulation shall be as per IS 14164.
INSULATION TYPE:IH / IT, SURFACE MATERIAL :CS & AS, OPERATING TEMP RANGE: UPTO 125 DEG C, INSULATION MATERIAL: ROCKWOOL
NB 0.5-0.75 INCHES, THICKNESS 25 MM
NB 1 INCHES, THICKNESS 25 MM
NB 2 INCHES, THICKNESS 25 MM
NB 3 INCHES, THICKNESS 25 MM
NB 4 INCHES, THICKNESS 25 MM
NB 6 INCHES, THICKNESS 25 MM
NB 8 INCHES, THICKNESS 25 MM
NB 12 INCHES, THICKNESS 25 MM
INSULATION TYPE: IH / IT, SURFACE MATERIAL :CS & AS, OPERATING TEMP RANGE: ABOVE 125 DEG C UPTO 550 DEG C, INSULATION MATERIAL: ROCKWOOL INSULATION TYPE:IS, SURFACE MATERIAL :CS & AS, OPERATING TEMP RANGE: ABOVE 350 DEG C UPTO 550 DEG C, INSULATION MATERIAL: ROCKWOOL
NB 0.5-0.75 INCHES, THICKNESS 40 MM
NB 1 INCHES, THICKNESS 40 MM
NB 2 INCHES, THICKNESS 40 MM
NB 2 INCHES, THICKNESS 50 MM
NB 3 INCHES, THICKNESS 40 MM
NB 4 INCHES, THICKNESS 40 MM
NB 4 INCHES, THICKNESS 65 MM
NB 6 INCHES, THICKNESS 40 MM
NB 8 INCHES, THICKNESS 50 MM
NB 8 INCHES, THICKNESS 65 MM
NB 10 INCHES, THICKNESS 50 MM
NB 10 INCHES, THICKNESS 65 MM
NB 12 INCHES, THICKNESS 50 MM
NB 12 INCHES, THICKNESS 65 MM
NB 14 INCHES, THICKNESS 65 MM
NB 16 INCHES, THICKNESS 50 MM
NB 38 INCHES, THICKNESS 50 MM
NB 42 INCHES, THICKNESS 50 MM
INSULATION TYPE: IH / IT, SURFACE MATERIAL :CS & AS, OPERATING TEMP RANGE: ABOVE 125 DEG C UPTO 550 DEG C, (APPLICABLE ONLY FOR HPS LINES IN OFFSITES) INSULATION MATERIAL: INNER LAYER : CALCIUM SILICATE (IS 9428 / ASTM C533, Type II) AND OUTER LAYER : AEROGEL (ASTM C1728, Type III, Grade 1) (*Total thickness given below in each line items. read the thickness value as inner layer + outer later)
NB 0.5-0.75 INCHES, THICKNESS 85 (75+10) MM
NB 4 INCHES, THICKNESS 125 (115+10) MM
NB 12 INCHES, THICKNESS 150 (140+10) MM
NB 20 INCHES, THICKNESS 160 (150+10) MM
NB 26 INCHES, THICKNESS 160 (150+10) MM
INSULATION TYPE: IS, SURFACE MATERIAL : CS & AS, OPERATING TEMP RANGE: UPTO 350 DEG C, INSULATION MATERIAL: CELLULAR GLASS
NB 0.5-0.75 INCHES, THICKNESS 25 MM
NB 3 INCHES, THICKNESS 25 MM
INSULATION TYPE: IE, SURFACE MATERIAL : CS & AS, OPERATING TEMP RANGE: UPTO 170 DEG C, INSULATION MATERIAL: INNER LAYER : ROCKWOOL AND OUTER LAYER : POLYURETHANE / POLYISOCYANURATE
NB 0.5-0.75 INCHES, THICKNESS 50 MM
NB 3 INCHES, THICKNESS 50 MM
NB 3 INCHES, THICKNESS 90 MM
NB 4 INCHES, THICKNESS 50 MM
NB 6 INCHES, THICKNESS 50 MM
NB 6 INCHES, THICKNESS 65 MM
NB 6 INCHES, THICKNESS 100 MM
NB 8 INCHES, THICKNESS 50 MM
NB 12 INCHES, THICKNESS 50 MM
NB 40 INCHES, THICKNESS 50 MM
COLD INSULATION (Supply & Installation) : Providing cold insulation such as PUF block including supply of all insulating and ancillary materials, vapour barrier, weather protective coverings, consumables and other necessary materials (including supports, clamps, ancillary materials for complete installation of Insulation), testing of materials as required, including transportation of materials to work site, duly inspected by TEN inspector at manufacturer's shop & sample check/inspection at site by TEN Construction inspector, applying insulation on surfaces as specified including all preparatory work there on, binding, tying, lacing, stitching and/or otherwise securing, finishing with sheet cladding as per spec, providing bolts, rivets and self tapping screws wherever specified, providing inspection windows, end seals for flanges etc., colour coding and identification. Providing steel scaffolding, all tools, tackles, equipments etc., labour, supervision and completing the work in all respect, at all heights as per drawings, specifications NR-0ZZZZ-PI-SPE-0002 and instructions of Engineer-in charge. Contractor scope also includes Supply and Installation of Removable weather shield cover, All material required for weather shielding for flanged joints and pipe including job at site with all required tools to perform job shall be in contractor scope, Job shall be performed as per standard NR-0ZZZZ-PI-SPE-0002. Measurement method for insulation shall be as per IS 14164.
INSULATION TYPE:COLD INSULATION,SURFACE MATERIAL : CS, CPVC & AS, OPERATING TEMP RANGE: UPTO 125 C, INSULATION MATERIAL:POLYURETHANE FOAM / POLYISOCYANURATE; REFER SPECIFICATION NR-0ZZZZ-PI-SPE-0004
NB 0.5-0.75 INCHES, THICKNESS 25 MM
NB 6 INCHES, THICKNESS 40 MM
PIPE SUPPORTS
PIPE SUPPORTS (MATERIAL SUPPLIED BY OWNER) : Receipt of Materials, Transportation of all piping items from Owner's Storage point to Contractor Storage/worksite/work shop, Fabrication, erection (at all elevations) of all types of pipe supports like shoes, cradles, hangers, Spring Supports, tie-rods, rigid struds, Sliding plates/Low Friction Pads, Heat isolation blocks, clamps (of all sizes/thicknesses manufactured by forming method using die), turn buckles, saddles, guides, special supports, expansion joints/bellows, pads, and trunnion supports etc. of all types including shot blasting, supply and application of one coat of primer, intermediate & final paint, all necessary equipments, consumables, labour, returning surplus materials and scraps etc. to OWNER's storage point and completing work as per drawings, specifications and instructions of Engineer-in-charge. Modifications/rectifications, if required; and adjustments/alignment during precommissioning, commissioning as per the instructions of Engineer-in-charge. Installation of Spring hangers shall be in contractor's scope. The scope of Works also includes grouting of supports, if required as part of Pipe Supports Works within the quoted price which includes supply of grouting materials also and nothing extra shall be payable in this regard. While fabricating the supporting elements the Contractor will ensure that dimensions shown in the drawings match with the site conditions. Additional supports as necessary with the site condition shall be fabricated and erected in accordance with the Standard. The measurement shall be done in MT of finished support. Wastage shall not be considered. Also unlocking of the Spring / hangers / and /or adjusting of turn buckles etc. during commissioning shall be in the scope of Contractor within the quoted price. Welding of supports with mother pipe shall be included in erection rate for Pipe Supports on MT basis. Scope also includes : Providing all the tools & tackles, machineries, Man lift, consumables, steel scaffolding at all location and all elevation, manpower, PPE, supervision, etc.
Dummy Pipe Supports for C.S.
Dummy Pipe Supports for A.S.
Dummy Pipe Supports for S.S.
PIPE SUPPORTS (MATERIAL SUPPLIED BY CONTRACTOR) : Supply, Fabrication, erection (at all elevations) of pipe supports like shoes, cradles, hangers, tie-rods, rigid struds, Sliding plates, Heat isolation blocks, clamps, U-Bolts, turn buckles, saddles, guides, special supports, pads, T post, brackets and trunnion supports etc. of all types including supply and application, shot blasting, one coat of primer, intermediate & final paint, all necessary equipments, consumables, labour, and completing work as per drawings, specifications and instructions of Engineer-in-charge. Modifications/rectifications, if required; and adjustments/alignment during precommissioning, commissioning as per the instructions of Engineer-in-charge. Installation of Spring hangers/strut/sliding plates/Snubber & tie rod shall be in contractor's scope .The scope of Works also includes grouting of supports, if required as part of Pipe Supports Works within the quoted price which includes supply of grouting materials also and nothing extra shall be payable in this regard. While fabricating the supporting elements the Contractor will ensure that dimensions shown in the drawings match with the site conditions. Pad and Trunnion welding in Contractor scope. Additional supports as necessary with the site condition shall be fabricated and erected in accordance with the Standard. The measurement shall be done in MT of finished support. Wastage shall not be considered. Also unlocking of the Spring / hangers / and /or adjusting of turn buckles etc. during commissioning shall be in the scope of Contractor within the quoted price. Scope also includes : Providing all the tools & tackles, machineries, Man lift, consumables, steel scaffolding at all location and all elevation, manpower, PPE, supervision, etc.
Carbon Steel Supports
Alloy Steel Supports
Stainless Steel Supports
PAINTING
Supply of paints and primers, preparation of surfaces and application of primer and finish paints, identification ( Line numbering), lettering, stencilling of equipment/piping, colour bands, colour coding, miscellaneous demarcation required as per site engineer such as marking on grade for underground lines/cable trays/trenches etc. As specified including rubdown and touch up of shop primer wherever required, providing scaffolding for all heights, labour, material, tools and tackles, consumables supervision etc. to complete the work in all respects as per Job spec. TP-1ZZZA-PI-SPE-0003 drawings and direction of Engineer-in-Charge for all type of uninsulated piping and insulated piping as specified including pipes, fittings, flanges, supports, valves, inline instruments etc. Surface preparation by blast cleaning and application of first coat of primer (as specified in Painting spec) shall be done in fabrication yard prior to erection. For insulated piping wherever blast cleaning with no primer application is specified (insulated SS), in such cases finish paints shall also be applied in the fabrication yard. The identification marks of the piping and joints shall be noted before blasting and the same shall be transferred on primed surface as per the instructions of Engineer-in-charge.
PAINTING OF UNINSULATED CS/ LTCS/ AS PIPING
OPERATING TEMP GROUP (TABLE-1, 1.2): -14 TO 100 (DEG C) SSPC-SP-10, Primer - Inorganic Zinc Silicate (FP-6), 1 coat, 65 - 75 μm, Primer - Epoxy High build (FP-3A), 1 coat, 170 μm, Primer - Acrylic Polyurethane (FP-1), 1 coat, 40 μm Total Primer DFT = 285 μm Finish Coat - Acrylic Polyurethane (FP-1) - 40 μm will apply after pressure water wash & surface rubbing Cumulative DFT = 325 μm
NB 0.5 - 0.75 INCHES
NB 1 INCHES
NB 1.5 INCHES
NB 2 INCHES
NB 3 INCHES
NB 4 INCHES
NB 6 INCHES
NB 8 INCHES
NB 10 INCHES
NB 12 INCHES
NB 14 INCHES
NB 16 INCHES
NB 18 INCHES
NB 20 INCHES
NB 24 INCHES
NB 26 INCHES
NB 28 INCHES
NB 30 INCHES
OPERATING TEMP GROUP (TABLE-1, 1.3): 101 TO 400 (DEG C) SSPC-SP-10, Primer - Inorganic Zinc Silicate (FP-6), 1 coat, 65 to 75 μm Finish Coat - Silicone Aluminium Paint (FP-8), 2 coats 2x20 =40 μm Cumulative DFT = 105 - 115 μm
NB 0.5-0.75 INCHES
NB 1.5 INCHES
NB 2 INCHES
NB 18 INCHES
NB 20 INCHES
NB 26 INCHES
PAINTING UNDER INSULATION OF CS/ LTCS/ AS PIPING :
OPERATING TEMP GROUP (TABLE-2, 2.1.1): -45 TO 200 (DEG C) SSPC-SP-10, Primer - Epoxy Phenolic (FP-10), 1 coat, 125 μm Finish Coat - Epoxy Phenolic (FP-10), 1 coat, 125 μm Cumulative DFT = 250 μm
NB 0.5-0.75 INCHES
NB 1 INCHES
NB 1.5 INCHES
NB 2 INCHES
NB 3 INCHES
NB 4 INCHES
NB 6 INCHES
NB 8 INCHES
NB 10 INCHES
NB 12 INCHES
NB 16 INCHES
NB 38 INCHES
NB 40 INCHES
NB 42 INCHES
OPERATING TEMP GROUP (TABLE-2, 2.1.2): -201 TO 540 (DEG C) SSPC-SP-10, Primer - Titanium catalysed inorganic ceramic copolymer, 1 coat, 150 μm Finish Coat - Titanium catalysed inorganic ceramic copolymer, 1 coat, 150 μm Cumulative DFT = 300 μm
NB 0.5-0.75 INCHES
NB 1.5 INCHES
NB 2 INCHES
NB 4 INCHES
NB 8 INCHES
NB 10 INCHES
NB 12 INCHES
NB 14 INCHES
NB 20 INCHES
NB 26 INCHES
OPERATING TEMP GROUP (TABLE-09, 9.1.1): UPTO 60 (DEG C) Primer - Epoxy Zinc Phosphate, 1 coat, 40 μm Finish Coat - Polyurethane, 1 coat, 40 μm Cumulative DFT = 80 μm
NB 0.5 INCHES
NB 0.75 INCHES
NB 1 INCHES
NB 1.5 INCHES
NB 2 INCHES
NB 3 INCHES
NB 4 INCHES
NB 6 INCHES
NB 8 INCHES
Misc. Works (Related to Piping Fabrication and Erection)
Flame Cutting C.S. Piping IBR/Non IBR
Hacksaw cutting C.S. Piping IBR/Non IBR
Bevelling C.S. Piping IBR/Non IBR
Fitup & welding C.S. Piping IBR/Non IBR
Hydrotesting, flushing, drying etc. of existing lines C.S. Piping IBR/Non IBR including Blinding and Deblinding of existing lines
Flame Cutting S.S. Piping IBR/Non IBR
Hacksaw cutting S.S. Piping IBR/Non IBR
Bevelling S.S. Piping IBR/Non IBR
Fitup & welding S.S. Piping IBR/Non IBR
Hydrotesting, flushing, drying etc. of existing lines S.S. Piping IBR/Non IBR including Blinding and Deblinding of existing lines
Flame cutting A.S. Piping IBR/Non IBR
Hacksaw cutting A.S. Piping IBR/Non IBR
Bevelling A.S. Piping IBR/Non IBR
Fitup & welding A.S. Piping IBR/Non IBR
Hydrotesting, flushing, drying etc. of existing lines A.S. Piping IBR/Non IBR including Blinding and Deblinding of existing lines
Grating Cutting / Modification / Removal
MISCELLANEOUS ACTIVITIES DURING RFSU AND COMMISSIONING ASSISTANCE:
Carrying out Commissioning activities such as Blinding, De-blinding (including supply and fabrication of Blind plates), steaming & flushing of pipe lines and equipments, to make ready for hot works for unit shutdown with required tools & consumables, Valves operations, valve dropping, cleaning of strainers, Flange tightening and any other activities / assistance etc. as per Commissioning specifications / procedure and instruction of Engineer-in-charge including supply of necessary hand tools, equipments / machineries, consumables (electrodes, filler wires, gas, card board, target plate, scaffolding etc. wherever required) and with the single point responsibility of Contractor's supervision. Note: This Manpower shall be utilized during shutdown assistance activities and for Commissioning assistance requirement over and above that already described elsewhere in the Price Schedule. One Manday is 12 Hour duty. Pre Commissioning requirement is already covered in the respective Items Unit Rates and within the CONTRACTOR's responsibility for Mechanical Completion. Unit Price for Supply, Fabrication and installation of Blind plates shall be paid separately as per Unit rate of Structural Steel Item.
Foreman / Supervisor
Skilled Manpower (with Hand Tools, Equipment / Machinery, Consumables)
Semi Skilled Manpower (with Hand Tools)
Helper / Unskilled Manpower
HIRING OF CRANES (OPTIONAL ITEM) INCLUDING MOBILIZATION AND DEMOBILIZATION CHARGES, CRANE OPERATORS, FUEL, LUBRICANTS, ALL CONSUMMABLES AND ACCESSORIES ETC. (10 HRS. IN DAY BASIS). USES FOR MORE THAN 10 HRS. IN A DAY SHALL BE PAYABLE ON NORMAL RATE PRORATE BASIS. The deployment of Cranes under this item is for the special cases and for Scope of work other than normal scope of work mentioned in other items of this SOR. The requirement of hiring of Crane shall be as decided by OWNER & CONSULTANT and shall be communicated accordingly during execution of Work.
CRAWLER / HYDRAULIC CRANE OF CAPACITY 200-250 MT
TYRE MOUNTED CRANE OF CAPACITY 100 MT
F-15 Faranna
INTERNAL COATED FIRE WATER PIPING (ABOVE GROUND)
Receipt of Materials, Transportation of all piping items from Owner's storage point to worksite /work shop, fabrication including cutting, edge preparation (including the grinding of edges of pipe, fittings, flanges etc. to match with the mating edges of uneven / different thickness wherever required); fit up, bending, preheating, wherever required, welding, treading and laying of pipes of all types and thicknesses over sleepers, overhead on racks and at all elevations and fixing of gaskets, bolts, nuts including application of torque where ever required & all other inline instruments and fittings like elbows, reducers, tees, piping specials such as mitres and fabricated fittings, vents, drains (but excluding reinforcing Pads), SW valves up to 1.5 NB, alignment, cleaning & flushing by water /compressed air, hydrostatic, pneumatic, vacuum, spark testing and any other type of testing as specified, draining, during by compressed air, performing Positive Materials Identification Tests using alloy analyzers, completing all such Works in all respects as per the specifications, drawings and instructions of Engineer-in-charge. PMI shall be performed by third party as defined in PMI specs. Contractor to prepare spooling drawing (with necessary details like spool numbers, weld joint number along with shop and field identification, flange joint numbers, cut pipe length, test pack number and other details as required ) using necessary software and spooling is in contractor scope.. For coated pipes, item rates shall be inclusive of supply and application of coating of Weld joints (internal) as per the Specification/recommended practice by coating vendor / Manufacturer. Erection of Low Friction Pads (Teflon/ Graphite/ SS 304 mirror finish) is inclusive in the quoted Price. All other applicable works which are mentioned in the Item Sl. no. 1.1 (PIPING - ABOVE GROUND) shall also be in Contractor scope.
FABRICATION : BUTT WELD
INTERNAL COATED CARBON STEEL PIPING;THK. <= 10MM
NB 2 Inch to 24 Inch
ERECTION
INTERNAL COATED CARBON STEEL PIPING;THK. <= 10MM
NB 2 Inch to 24 Inch
Spool Drawings preparation for Piping Fabrication using latest Piping Spool Gen Software through specialized agency. Contractor will keep required Technical Manpower at site along with required hardware/computers. Contractor need to update the report on daily basis. Contractor will submit Past track record and take approval of specialized Agency for spooling design and drawing preparation prior to order placement and mobilization of Agency at site.
Hiring of 01 No. Pick Up Vehicle with Driver for minimum 2000 KM in a Month basis (Round the clock duty) . Beyond 2000 KM, extra amount shall be payable on Prorate basis.
Extra KM Beyond above mentioned KM.
Hiring of 01 No. Pick Up Vehicle with Driver for minimum 2000 KM in a Month basis for 12 Hours in day. Beyond 2000 KM, extra amount shall be payable on Prorate basis.
Beyond above mentioned working hours
Extra KM Beyond above mentioned KM.
Hiring of 01 No. Passenger Vehicle (XUV 300 / Bolero / Scorpio) with Driver for minimum 3000 KM in a Month basis for 12 Hours in day .
Beyond above mentioned working hours
Extra KM Beyond above mentioned KM.
SUPPLY OF STANDARD NITROGEN BOTTLES REQUIRED FOR PRESSURISING FOR LINES BEYOND 7 KG/CM2 WHEN CONDUCTING PNEAUMATIC TEST
STATIC EQUIPMENTS (REACTOR, COLUMNS, VESSELS, HEAT EXCHANGERS, AIR COOLERS ETC..)
Exchangers
Static Mixer
HYDROTESTING / RE HYDROTESTING OF HEAT EXCHANGERS
Hydrostatic testing of HEAT EXCHANGERS (shell and tube ) single tier or multi tier /AIR COOLERS including dismantling and reassembling of piping connections wherever required, providing blinds and gaskets on nozzles, piping, water hoses, gauges, valves, test pumps and all other temporary arrangement, labour and materials, drying by hot compressed air as per specifications and instructions of Engineer-in-charge. In case, if leakage is found in gaskets and gaskets are replaced, then re hydrotest to be done with new gasket after reassembly.
Hydrotesting of Shell side
Hydrotesting of Tube Side
Insulation of Equipment: 1)Providing thermal insulation including supply of all insulating and ancillary material, heat resistant paint/foils, weather protective covering, consumables and other necessary materials, testing of the material as required including transportation of the materials to work sites, applying insulation on surfaces as specified, including all preparatory works thereon, all binding, tying, lacing, stitching and/or otherwise securing, finishing with plain/corrugated sheet cladding or as specified, providing bolts, rivets, self tapping screws wherever specified, providing inspection windows etc., providing necessary scaffolding, all tools and tackles, equipment, apparatus etc., labour & supervision and completing the work in all respect at all heights as per drawings, specifications and instructions of Engineer-in-charge. The above requirement shall be considered according to Insulation specification for hot insulation of vessels, piping & Equipments (NR-0ZZZZ-PI-SPE-0003, Rev. D2). 2)Insulation area as specified below based on the equipment bare surface.
INSULATION THICKNESS : 50 mm: Insulation material : Insulation Type :HC
INSULATION THICKNESS : 40 mm: Insulation material : Insulation Type :Safety Insulation
INSULATION THICKNESS : 25 mm: Insulation material : Insulation Type :HC
Touch-up Painting of Equipment: (Optional Items)
Touch-up Painting of Equipment: (Uninsulated Equipment): Supply and application of Touch-up paint on C.S., L.T.C.S. & low alloy steel vertical vessels, horizontal vessels,drums,heat exchangers, mixers including rubdown wherever required as per specification, providing scaffolding for all heights, labour, materials, tools and tackles, consumables, supervision etc. to complete the work in all respect as per specifications, drawings, equipment details for painting and direction of Engineer-in-Charge for all type of uninsulated equipments.
ROTARY EQUIPMENTS (PUMPS,COMPRESSORS & ASSOCIATED ITEMS)
PUMPS - CENTRIFUGAL ROTARY PUMPS
Tank Farm Area Pumps - 1S72-PA-0611A/B, 1S71-PA-0411A/B/C
OCTANE BOOTER PUMPS-1S75-PA-9311A/B
HGU PEED PUMPS 1S76-PA-1003A/B
LPG TRANSFER PUMPS 1S76-PA-1004A/B
LPG OFFSPECTRANSFER PUMPS 1S76-PA-1005A/B
HGU NAPTHA PUMPS 1S75-PA-1212,1213
PACKAGES
ADDITIVE DOSAGE PACKAGE (5 Nos) 1) Multi Functional Additive Dosage Skid 2) Orange Dye Dosage Skid 3) Lubricity Improver Dosage Skid 4) Pour Point Depressant Dosage Skid 5) Cetane Booster Dosing pumps
1U58-Z-8496 METERING SKID
MATERIAL HANDLING EQUIPMENT ERECTION-CP BLOCKS/ELECTRIC HOISTS
CP Block- For Heat Exchanger bundle removal & Pumps Maintenance
CP Block - 2 Ton
CP Block - 3 Ton
CP Block- For Substation SS18
CP Block - 3 Ton
CP Block- For EDG SS18
CP Block -10 Ton
Electric Hoists-For Heat Exchanger bundle removal & Pumps maintenance
EH - 20 Ton
Electric Hoists-For Heat Exchanger bundle removal & Pumps maintenance
FIRE FIGHTING EQUIPMENT - ERECTION WORK
FIREFIGHTING AND SAFETY EQUIPMENT : ERECTION of fire fighting & safety equipment including transportation of equipments from warehouse to works site, supplying and fixing of nuts, bolts, washers, gaskets (as per specs.) needed for fixing the equipment with matching flange etc.
Installation of Double headed stand post type Fire hydrant valves
i) Stand post
ii) Hydrant valves
Installation of Landing valves for Double Headed Fire Hydrant at technological structures and building
i) Hydrant landing valves
Installation of Hose Box – Double Door Self-Standing Type for Process Area
Installation of Hose Box – Double Door Wall-mounting Type for Technological structures and building
Installation of Hose reel (Indoor)
Installation of Water cum foam monitor (500-750-1000 GPM)
Installation of High Volume Long Range Water cum Foam Monitor(1000-1500-2000 GPM)
Installation of Medium Velocity Water Spray Nozzles
Installation of High Velocity Water Spray Nozzles
First-Aid Fire Fighting Equipment (Installation Only)
Installation of Dry Chemical Powder Extinguisher – 10 kg (outdoor)
Installation of Dry Chemical Powder Extinguisher – 10 kg (indoor)
Installation of Dry Chemical Powder Extinguisher – 25 kg
Installation of Dry Chemical Powder Extinguisher – 50 kg
Installation of Carbon-Di-Oxide Extinguisher – 4.5 kg (indoor)
Installation of Sand bucket ( 4 buckets in row)
Installation of Fist Aid Kit
Installation of Safety shower & Eye wash station
Installation of Eye wash station
Installation of 63 mm male instantaneous coupling SS, ASTM A351, Gr CF8M (2-1/2" X 4 outlets) (Foam)
Windsock
Safety Goggles
Acid Proof Aprons
MEFG with eductor
Installation of Hydrant Manifold ( 6 X 63mm instantaneous coupling )
Installation of Four way hydrant (with pumper connection)
Installation of Electrical Safety Kit
Installation of Safety Signs (Field)
Fire Extinguisher
Manual Call Point
Eye Wash
Deluge Release Push Button
Manual Deluge Valve
Installation of Safety Signs (Building)
Fire Exit (Illuminated)
First Aid Box
Fire Exit (Double Sided)
Emergency Exit (Turn Left)
Eye Wash
No Unauthurized Entry
Pressurised Cylinder Storage Area
Danger Electrical Hazard
Fire Extinguisher
Manual Call Point
Safety Goggles
Acid Proof Aprons
FIRE FIGTING EQUIPMENT : ERECTION of fire fighting equipment including transportation of equipments from owner's store to works site, supplying and fixing of nuts, bolts, washers, gaskets (as per specs.) needed for fixing the equipment with matching flange etc.
Installation of Automatic deluge valve
Sharp Tanks and Structurals Pvt Ltd
Offshore Infrastructures Ltd
Bridge and Roof Co India Ltd
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.07 MB
Download all tender documents and submit your bid