Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-Finance PALLAM SEYNAMVILAI BETHELPURAM POST KANYAKUMARI DIST PIN 629 803 | BETHELPURAM | KANYAKUMARI | TAMIL NADU | 629803 | ₹3.0 L | L1 | Accepted-Finance lowest value |
| Sl No | Description | Qty | Unit | SELVIN GNANA ROSE L1 |
|---|---|---|---|---|
| 1.00 | Removing hard rock by wedging, chiseling and trimming to proper shape where blasting is prohibited. (Double rate of S.R.39A).(as per PWD Schedule of rates 2018-2019). | 2 | cu.m | 2,380 ₹2,808.4 Lowest |
| 2.00 | PCC 1:3:6 mix using with 40mm HBS jelly including cost of all materials, lead, lift, etc. complete without form work. | 7 | cu.m | 32,830 ₹38,739.4 Lowest |
| 3.00 | PCC 1:2:4 using 20 mm HBS jelly including cost of all materials lead, lift,curing etc., complete with form work | 3.2 | cu.m | 26,393.6 ₹31,144.45 Lowest |
| 4.00 | Brick work with CM 1:6 using second class brick 9"X4 3/8"x23/4" including cost of all materials labour, lead, lift, curing etc; complete. | 1 | cu.m | 5,694 ₹6,718.92 Lowest |
| 5.00 | Plastering with CM 1:3,12mm thick including cost of all materials,labour, lead, lift, curing etc. Complete. | 20 | sq.m | 5,520 ₹6,513.6 Lowest |
| 6.00 | Labour, machinery, Consumables for the Fabrication for steel structures Heavy section (14 kg/m and above) | 0.48 | MT | 9,427.68 ₹11,124.66 Lowest |
| 7.00 | Labour, machinery, Consumables for the Fabrication for steel structures Light section (below 14 kg/m) | 0.57 | MT | 26,468.99 ₹31,233.41 Lowest |
| 8.00 | Labour for the Erection of the Fabricated Steel Structures.Heavy section (14 kg/m and above) | 0.48 | MT | 5,836.32 ₹6,886.86 Lowest |
| 9.00 | Labour for the Erection of the Fabricated Steel Structures.. Light section (below 14 kg/m) | 0.57 | MT | 9,528.61 ₹11,243.76 Lowest |
| 10.00 | Labour, machinery, consumables for fabrication, erection of earrthmat, earth connection (including Green colour painting), earth electrode, earthspike (including sharpening of earth spike). As directed by the field engineer. | 0.52 | Ton | 29,327.48 ₹34,606.43 Lowest |
Tender Value
Refer Docs
EMD Value
₹3,000
Closing Date
5 Aug 2026, 2:00 pmClosed
o/o the EE/D/Ngl
o/o the EE/D/Ngl
of1) Improvement estimate for newly proposed 11 KV VEMBANOOR feeder in 33/11 KV ASARIPALLAM substation under Asaripallam section (SS Work)
2026_EB_687665_1
EE/D/NGL/ET .25/dt.22.07.2026
Open Tender
Electrical Works
Works
90 days
EE/NGL
As per Specified
3 documents required · 3 mandatory
₹0
₹3,000
Yes
6 Aug 2026
22 Jul 2026
5 Aug 2026
22 Jul 2026
5 Aug 2026
22 Jul 2026
22 Jul 2026 - 4 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Removing hard rock by wedging, chiseling and trimming to proper shape where blasting is prohibited. (Double rate of S.R.39A).(as per PWD Schedule of rates 2018-2019). | 2 | cu.m | - | - |
| 2 | PCC 1:3:6 mix using with 40mm HBS jelly including cost of all materials, lead, lift, etc. complete without form work. | 7 | cu.m | - | - |
| 3 | PCC 1:2:4 using 20 mm HBS jelly including cost of all materials lead, lift,curing etc., complete with form work | 3.2 | cu.m | - | - |
| 4 | Brick work with CM 1:6 using second class brick 9"X4 3/8"x23/4" including cost of all materials labour, lead, lift, curing etc; complete. | 1 | cu.m | - | - |
| 5 | Plastering with CM 1:3,12mm thick including cost of all materials,labour, lead, lift, curing etc. Complete. | 20 | sq.m | - | - |
| 6 | Labour, machinery, Consumables for the Fabrication for steel structures Heavy section (14 kg/m and above) | 0.48 | MT | - | - |
| 7 | Labour, machinery, Consumables for the Fabrication for steel structures Light section (below 14 kg/m) | 0.57 | MT | - | - |
| 8 | Labour for the Erection of the Fabricated Steel Structures.Heavy section (14 kg/m and above) | 0.48 | MT | - | - |
| 9 | Labour for the Erection of the Fabricated Steel Structures.. Light section (below 14 kg/m) | 0.57 | MT | - | - |
| 10 | Labour, machinery, consumables for fabrication, erection of earrthmat, earth connection (including Green colour painting), earth electrode, earthspike (including sharpening of earth spike). As directed by the field engineer. | 0.52 | Ton | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
Tendernotice_2.pdf
PDF • 1.41 MB
BOQ_826522.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].