| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-Finance | ₹1.4 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹1.4 Cr+₹3.7 L (2.67%)Rejected-Finance | ₹1.4 Cr+₹3.7 L (2.67%) | L2 | Rejected-Finance L2 |
| 3 | L3₹1.7 Cr+₹30.9 L (22.3%)Rejected-Finance | ₹1.7 Cr+₹30.9 L (22.3%) | L3 | Rejected-Finance L3 |
Tender Value
₹2.3 Cr
EMD Value
₹4.6 L
Closing Date
16 Mar 2026, 6:00 pmClosed
SE PWD North Jammu, Lok Nirman Bawan
Office of the SUPERINTENDING ENGINEER PWD(R and B) NORTH CIRCLE JAMMU, Lok Nirman Bawan Jammu
Construction of Institute of Driving Training and Research at Ghaink (Part-II) Balance work
2026_PWDJK_304175_1
e-NIT No. SENJ/37 of 2025-26 dated 21-02-2026
Open Tender
Civil Works
Percentage
272 days
Jammu
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,000
Superintending Engineer PWD Circle North Jammu
₹4.6 L
Office of the SE PWD North Jammu, Lok Nirman Bawan
23 Mar 2026
21 Feb 2026
18 Mar 2026
22 Feb 2026
16 Mar 2026
22 Feb 2026
5 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | - | sqm | 12.49 | - |
| 2 | Excavating, supplying and filling of local earth (including royalty)by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. (complete job including carriage) | - | cum | 276.6 | - |
| 3 | Preparation of subgrade by excavating earth to an average of 22.5 cm depth, dressing to camber and consolidation with road roller of 8-12 tonne capacity including making good the undulation etc. and disposal of surplus earth upto 50 meters. | - | sqm | 153 | - |
| 4 | 75mm thick back filling for pitching including supplying of required materials and consolidation etc. complete with Moorum | - | sqm | 63.4 | - |
| 5 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 312.2 | cum | 256.85 | ₹80,188.57 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 151 | cum | 5,202.9 | ₹7,85,637.9 |
| 7 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 187.2 | cum | 7,788.4 | ₹14,57,988.48 |
| 8 | Reinforced cement concrete work in walls (any thickness) including attached pilasters,buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering,finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 78 | cum | 9,395.7 | ₹7,32,864.6 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete | 26,520 | Kg | 123.2 | ₹32,67,264 |
| 10 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | - | cum | 6,591.25 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.12 MB
BOQ_988074.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .