Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹82.2 LAccepted-Finance 371 BUDHWA TALAB KE PASCHIM SUBHASH NAGAR DIST HARDOI | HARDOI | UTTAR PRADESH | 209869 | L1 | Accepted-Finance Accepted as per lottery system by prahri | |
| 2 | L1₹82.2 LRejected-Finance | L1 | Rejected-Finance Rejected as per lottery system by prahri | |
| 3 | L1₹82.2 LRejected-Finance 11 4 KHANANCHI TOLA HARDOI | L1 | Rejected-Finance Rejected as per lottery system by prahri |
Tender Value
₹1 Cr
EMD Value
₹7 L
Closing Date
3 Nov 2026, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SUPERINTENDING ENGINEER UNNAO CIRCLE PWD UNNAO
SUPERINTENDING ENGINEER UNNAO CIRCLE PWD UNNAO
Improvement work of Bilgram-Sandi-Allaganj road (SH-137)
2026_CEUCZ_1200842_6
4572 M /1MT/ E-Tender/ U.C/2026 Dated 21.10.2026
Open Tender
Civil Works
Percentage
SUPERINTENDING ENGINEER UNNAO CIRCLE PWD UNNAO
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹7 L
Yes
28 Nov 2026
28 Oct 2026
3 Nov 2026
28 Oct 2026
3 Nov 2026
28 Oct 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavtion by mechanical means (hydraulic excavator) including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within a lead of 50m, lift upto 1.5m. Including all taxes and labour cess but excluding GST | 1,700 | Cum | 130 | ₹2,21,000 |
| 2 | Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead upto 10 km for all lifts, complete as per directions of Engineer-in-charge.
Note item to be applicable in urban areas having directions for restricted hours for movement/ plying of load-carrying motor vehicle of 3.5 cum or more. Including all taxes and labour cess but excluding GST | 1,700 | Cum | 230 | ₹3,91,000 |
| 3 | Construction of embankment with approved material obtained from availble land as permitted and approved by Engineer-in-Charge and as per Technical Specitaion Clause 301.3.4.1, with all lifts and leads, spreading, grading to required slope and compacting to meet requirement of Tables 300.1and 300.2 as per Technical Specification clause 301.5 Including all taxes and labour cess but excluding GST | 900 | Cum | 92 | ₹82,800 |
| 4 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. Including all taxes and labour cess but excluding GST | 928 | Cum | 4,450 | ₹41,29,600 |
| 5 | Supply of 80 mm thick I shaped mechanically cpmpressed inter locking C.C. paver blocks manufactured by high pressure & controlled vibration machine having plane dimension 200x(160 + 120mm) with minimum 5 mm toping of O.P. cement mix with 25% marble powder. The compressive strength of concrete paver blocks shall not be less than 30 MPa & 4.54 Kg/no. including cost of all material, labour and T&P etc. required for proper copletion of work as directed by Engineer - in - Charge but excluding U.P.T.T. which shall be paid extra as per rules. Including all taxes and labour cess but excluding GST | 4,000 | Sqm | 970 | ₹38,80,000 |
| 6 | Tack Coat @ 0.20kg/sqm
Providing and applying tack coat with VG_10 using bitumen distributor at the rate of 0.20 kg per sqm on the prepared surface cleaned with hydraulic broom Including all taxes and labour cess but excluding GST | 525 | Sqm | 18.5 | ₹9,712.5 |
| 7 | Bituminious Concrete 30 mm thick.
Providing and laying bituminious concrete with 60-90TPH batch type hot mix plant producing in averate 75 tonne per hour using crushed aggregates of specified grading, premixed with bituminous binder as per job mix, transporting the hot mix to work site,laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H Specifications Clause 509 complete in all respects.. Including all taxes and labour cess but excluding GST | 52 | Cum | 18,500 | ₹9,62,000 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.18 MB
Tendernotice_2.pdf
PDF • 0.65 MB
BOQ_2272235.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .