Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.2 LAccepted-AOC 12 MANAULI HOUSE AMBALA CITY 134003 HRY | AMBALA CITY | AMBALA | HARYANA | 134003 | L1 | Accepted-AOC Admitted | |
| 2 | L2₹64.3 L+₹18.0 L (39.0%)Rejected-AOC | L2 | Rejected-AOC Admitted | |
| 3 | L3₹69.9 L+₹23.7 L (51.3%)Rejected-AOC 186 GANDHI MARKET AMBALA CANTT 133001 | AMBALA CANTT | AMBALA | HARYANA | 133001 | L3 | Rejected-AOC Admitted | |
| 4 | Rejected-Technical | - | Rejected-Technical Not enlisted in requiredcategory |
Tender Value
₹47.4 L
EMD Value
₹94,820
Closing Date
25 Sept 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE(U) E/M Meerut Cantt
GE(U) E/M Meerut Cantt
TENDER FOR ITEM RATE CONTRACT FOR REPAIR/ UPGRADATION OF LT SYSTEM INCLUDING PROGRAMMABLE NECESSARY METERING FOR ENERGY CONSERVATION AT GE(UTILITY) MEERUT CANTT
2021_MES_471141_1
8367/E8
Open Tender
Electrical and Maintenance Works
Item Rate
90 days
Meerut Cantt
Please refer Tender documents.
11 documents required · 11 mandatory
₹500
GE(U) E/M Meerut Cantt
₹94,820
Yes
8 Oct 2021
27 Aug 2021
28 Sept 2021
27 Aug 2021
25 Sept 2021
11 Sept 2021
27 Aug 2021 - 4 Sept 2021
90 days
Amount
System Apparent Power (kVA23. Apparent Power L1 (kVA) 24. Apparent Power L2 (kVA) 25. Apparent Power L3 (kVA) 26. System Power Factor 27. Power Factor L1 28. Power Factor L2 29. Power Factor L3 30. Phase Angle L1 Phase Angle L2 32. Phase Angle L3 33. Import kWh (8 digit resolution)* 34. Export kWh (8 digit resolution)* 35. Ind. kVArh (8 digit resolution)* 36. Cap. kVArh (8 digit resolution)* 37. kVAh (8 digit resolution)* 38. Current Demand 39. KVA Demand 40. KW Import Demand 41. KW Export Demand 42 KVAr Ind. Demand 43 KVAr Cap. Demand 44. Max Current Demand 45. Max KVA Demand 46. Max KW Import Demand 47. Max KW Export Demand 48 Max KVAr Ind. Demand 49 Max KVAr Cap. Demand 50. Run Hour 51. On Hour 52 Number of Interruptions 53. Phase Reversal Indication accurately. Clearance and Creepage distance meets UL- 61010. Programmable starting current in % of 5A secondary. Default 10mA Programmable Auto scrolling time - 1 sec. to 10 sec. (Default 5 sec.). Programmable Energy display - Counter based or Resolution based. Energy resetting at 9999999 kVAh x MF. Front LED pulse 16000 imp/kWh. OLD register to store previously cleared Energy & Load hours. Ampere hour (Ah) & PF average parameter. Phase wise Voltage Sag & Swell Wave Forms.
LCD 8 parameter display at a time, 8 Digits energy. Power save mode with Enable/Disable option. Available RS485 communication & optional Ethernet communication (factory configurable). Byte order option - Field Programmable Float / Little Endian / Big End. Optional Features Digital outputs - 4 potential free contacts with programmable time delay. Hysteresis of 1%. Trip time delay: 1 to 180 sec. Pulse output 300/TR/KWh. Analog Input up to 2. Accuracy of class 1% FS. Individual Harmonics up to 63rd order. Demand Controller with 4 Relay outputs. TOD option (Energy & Demand up to 8 slots ). Digital Input up to 4 RTC synchronisation through communication. Analog Output - Two independently programmable to 0-20 mA (or) 4-20 mA Up to 60A or 100A direct measurements using Hanging CT. Datalogger - 6MB optional / Ethernet with 14GB memory for IOT device. Output configurable to any of the parameters from VLL, A, F, W, PF, VA. Dual Source. (Make:- ELMEASURE/RISHABH/SCHNEIDER/SELEC ). ONLY Original OEM is entitled for work .
Contractor has to ensure it.Necessary test certificates & Latest Purchase Vouchers to be scrutnised / approved by Engg-in-Charge & GE first before execution at site . Any Defect occuring during this period due to bad workmanship of material, manufacturing defect shall be rectified or replaced free of cost. The contractor shall furnish written gaurantee on letter head for above mentioned to the GE immidiately after completion of work. Contractor has to ensure Post Audit of work, without that completion will not be issued.
Dismentaling of old U/S unit & replacement with Intelligent micro processor based automation controller 3 hase nine individual out puts of load handling capacity not less than 100 Amps with short circuit over load cut off 90 Amps and low voltage cut off at 145 Volts high voltage cut off at 250 volts with 2 sec high set delay protection with RS 485/RS 232 Modbus 8 Years server programmer & Back up arrangement Note ( Nothing extra charges for 08 Years will be released from MES ) specially designed for Energy Conservation & further Saving up to 33%with programer automation not to program auto mode to existing Panels in a day time with proper longitude and lattitude password set having Specifications Advance Microcontroller based design and real-time clock base systems. Real time clock with inbuilt battery with life of more then 8 years (Manufacturer provided 10 years life for the real time clock battery with the accuracy of +/- 60 second per month Data protection of user parameter by specially RAM which hold the parameters for more then 10 years with out any power Street light ON / OFF on Longitude, Latitude base sunset and sunrise time generation. Controller operates 365 days on real-time based clock with auto calculate sunrise and sunset times as per geographic location. Inbuilt auto recovery systems for power failure which helps in AMF operation. Month wise civil twilight timings (Day light power saving) which helps precise ON / OFF time in all weathers
(Advantage of Sunlight before sunrise and Sunlight after sunset). Password Protection. Scrolling display of events which helps to monitoring the systems. key board operation. Auto / Manual facility by way of relay operation for faster service mode.
Technical Specification Supply : 3 Phase 230 VAC/ph + / – 25 %, R Y B N 4 Wire supply Systems. 50 Hz (+ / - 10 %) Power Consumption : 2 W (Stand by) 5 W (on full load) Controller : 8 Bit micro controller Programming function : Switching on Longitude & Latitude base Real Time Clock : Inbuilt battery, with battery life of more then 8 years Parameter data protection : With special device which hold the data for more then 10 years without any power and Password protected. Display : 16 character and two lines LCD display with backlight. Contacts : 3 Potential free contacts for normal and staggering With fuse protection. Redundancy : Operates up to single phase 170 V Ac By pass : Provision to by pass by way of Auto / manual switch Operating Temperature : 2 to 55’ centigrade and humidity 90 % non-condensing (Make:- L&T /Schneider/ ABB ) ONLY Original OEM is entitled for work . Contractor has to ensure it.Necessary test certificates & Latest Purchase Vouchers to be scrutnised / approved by Engg-in-Charge & GE first before execution at site . Any Defect occuring during this period due to bad workmanship of material, manufacturing defect shall be rectified or replaced free of cost. The contractor shall furnish written gaurantee on letter head for above mentioned to the GE immidiately after completion of work. Contractor has to ensure Post Audit of work, without that completion will not be issued.
l Multi-port communication (optional 2 maximum) complete, portable solution for pinpointing electric usage and recording building performance metrics. specially designed for single 433 VOLTS input and multiple outputs up to 06 numbers in MRS/Sub Stations inclusive of capable of measuring, storing, and analyzing electrical consumption data which is derived from the voltage and current inputs. using direct connections to each phase of the voltage and various interchangeable current sensor options such as split-core , clamp-on, or flexible Rogowski RoCoil current transformers (designed for large loads or large cables and bussbars) to monitor current on each phase. recording/ capture kWh/kW energy and demand data as well as virtually all relevant energy parameters for diagnostics and monitoring on three-phase or single-phase circuit installations. Electrical load diagnostic parameters, such as power factor (both Apparent and Displacement), are captured in addition to energy and demand values. In addition to recording kWh/kW data, also features four analog input channels which can be configured for voltage or current input used in any combination among channels. Analog inputs are especially helpful when used in conjunction with power measurements to correlate the consumption of electricity with environmental, features with Main measurements and functions include:
Voltage: phase, line and system values Current: phase values (neutral current calculated) Power: apparent, active and reactive phase and total values Power Factor per phase and total Frequency of measured voltage value HIGH LOW AVERAGE - - value functions for all measurements Maximum demand of power and current values Voltage and current asymmetry Total harmonic distortion ( ): voltage and current THD Energy meters for active, reactive, apparent partial and total values, per phase and system values Hour counter for programmable total and partial hours Phase active power unbalanceone incoming four outgoing suitable to collect all necesarry parameters, Send commands, such as counters reset or enabling and disabling of multimeter outputs • Set the parameters, save a copy in a file and retrieve it in case of need (the file can be sent via email as well) • active user alarms. Operational characteristics – Auxiliary supply voltage range: 100-440 / VAC 120-250VDC – Voltage measurement range: 50-720VAC – Usage in medium and high-voltage systems with voltage transformers – Rated input current: 1A or 5A – Frequency measurement range: 45-66Hz – True measurements: for voltage and RMS current – Measurement accuracy: •Voltage: ±0.5% (50-720 ) VAC •Current: ±0.5% (0.1-1.1In) •Power: ±1% f.s. •Frequency: ±0.05% •Active energy: Classe 1 ( / 62053-22) IEC EN •Reactive energy: Class 2 ( / 62053-23) distribution system capable distribution system with following specification : -
(a). Wireless Modem Specifications • GPRS/Edge modem o Max power input : < 1 W o RF Output power Levels o Max : 33dbm (+/-) 2db o Receiver sensitivity : < -106 dbm o Avg power consumption(sending data every 1 minute) : < 1 W o Voltage range : 70V to 300V o Normal operation temperature: -20 °C to +55 °C o bands : quad band o ports : RS485, RS232 (b) CE Certified GPRS/ Edge Modem o Dual-Band GSM/GPRS 900/ 1800 MHz o 3V3 & 5V interface for direct communication with MCU kit o Configurable baud rate o SMA connector with GSMAntenna. o SIMCard holder. o Built in Network Status LED
Inbuilt Powerful TCP/IP protocol stack for internet data transfer over GPRS. o GPRS mobile station class B o Compliant to GSM phase 2/2+ – Class 4 (2W@ 900 MHz) – Class 1 (1W@ 1800MHz) o Control via AT commands (GSM07.07 ,07.05 and SIMCOMenhanced AT Commands) (c) Micro-Controller o Type - MSP430 5F4194 o Hardware Multiplier Supporting 32-Bit Operations o Serial Onboard Programming, No External Programming Voltage Needed o Three-Channel Internal DMA o Basic TimerWith Real-Time Clock Feature o 12-Bit Analog-to-Digital Converter (ADC) o Up to Four Universal Serial Communication Interfaces o Unified Clock System o Flexible Power Management System
RTC backup o SPI interface (option) o Serial interface o Antenna pad o I2C o GPIO o PWM o ADC (g) Special Firm ware o FOTA o MMS o Java (cooperate with Iasolution) o Embedded AT (h) Frequency of meter read is 1 minute
Reporting Parameters: Reports should provide detailed information on Electrical Metering data published by IEMU such as Daily Load profiles, Average power factor, Voltage, current, kWh, frequency, etc. Flexible Reporting: There should be provision to generate reports based on current day, for a particular day and for a period where he should be able to choose the start date and end date. Reports should also present graphs where applicable and provide export in form of Excel or Word to the Engineer - in - Charge by the contractor. (l) Location report The User should be able to view the report of a single location as well as a group of sub-location over the specified period. He should be able to view the report in form of a Graph, and tabular form. • Sub-location report The User should be able to view the report of a single sub-location as well as for a number of devices in the same, over the specified period. He should be able to view the report in form of a Graph, and tabular form. • Export Reports in Excel / CSV format. • Online display of Graphical Charts for various electrical parameters. • Define group of IEMUs meters based on locations •
Define the reports on Cumulative kWh, and Running Hours, etc. • Define Reports on the basis of Quality of Power supply like Voltage imbalance, Current imbalance, Voltage fluctuations etc. Alarms and Alerts: The Web Based Application Software and Services should generate Alarms and send Alerts over SMS messages to mobile users and emails for the conditions, such as: • Voltage in any phase goes above 450 V with value of voltage • Voltage in any phase goes below 310 V with value of voltage • Power factor of any phase is less than 0.90 with value of power factor • Any deviation from benchmark value of active power, apparent power and reactive power. • Incoming power supply not available. • Ability to suppress the alerts during specified time period in a day. Note: SMS to User should be strictly through Central Server (CS) and No User shall be able to receive SMS directly from the Intelligent Field Device due to security concerns. SMS must be delivered to client up to 05 Years from date of instalation Key Technology Criteria: •
The System should be accessible anywhere through web but with a secured password protection and no software or hardware required to be installed for viewing the data on web • The software and server should be maintained by the contractor, without cost implication, and there should not be any requirement of deploying IT hardware and software. • The web application shall be hosted on Tier-III certified data center MAKE SIEMENS/SCHNIDER/SMARTSENSE/PARTNER approved by GE minimum ISO 9001:2015 Certified . ONLY Original OEM is entitled for work . Contractor has to ensure it.Necessary test certificates & Latest Purchase Vouchers to be scrutnised / approved by Engg-in-Charge & GE first before execution at site . Any Defect occuring during this period due to bad workmanship of material, manufacturing defect shall be rectified or replaced free of cost. The contractor shall furnish written gaurantee on letter head for above mentioned to the GE immidiately after completion of work. Contractor has to ensure Post Audit of work, without that completion will not be issued.
Supply, installation , testing & commissioning with necessary siftware /hardware programmer for LIVE display and auto recorder equipped with Intel Core i3 Processor or equivalent at minimum 2.00 GHz ( 2 MB L2 cache ), Intel Server Based Motherboard with minimum 800 Mhz BUS Speed , 2 GB DDR 2 SDRAM@ 667 Mhz , 160 GB SATA HDD , 2 x USB 2.0, 2 x Serial Port, Gigabyte LAN with 19" TFT Display Monitor with Resolution of 1440 x 900 Pixel and Support 16.2M Color with required software for web based application. Make: HP / COMPAQ/Dell/Acer.
Supply,Installation Testing & Commissioning of ONLINE UPS-1000VA,230 V AC,30 Min Back Up Make:-I Ball/ Apson/Microtek/ UTL. Only Qualified service engineer entitled for works
unison engg enterprises
M/S Sonu Traders
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .