| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.5 LAccepted-AOC | ₹4.5 L | 1 | Accepted-AOC L1 Quoted |
| 2 | 2₹4.9 LRejected-Finance | ₹4.9 L | 2 | Rejected-Finance L2 quoted |
Tender Value
Refer Docs
EMD Value
₹4,800
Closing Date
27 Mar 2026, 2:00 pmClosed
SE/CEDC/South-I
The Superintending Engineer, CEDC/South-I, K.K.Nagar, Chennai - 78
ET-56-Rama
2026_EB_673418_1
ET-56
Limited
Civil Works
Works
Ramapuram
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4,800
21 Aug 2026
12 Mar 2026
30 Mar 2026
12 Mar 2026
27 Mar 2026
12 Mar 2026
Filling with river sand for foundation including cost of river sand, lead, lift, labour for filling, watering, well ramming etc., complete.
Suplying and Providing PCC 1:3:6 using 40mm HBGS jelly The rate includes the cost of materials, lead, lift, labour, etc., complete, but excluding cost of steel reinforcement.
Providing and laying of Reinforced cement concrete 1:2:4 using 20 mm HBG metal. The rate includes the cost of materials, lead, lift, labour, etc., complete, but excluding cost of steel reinforcement.
Providng steel reinforcement for RCC works including cost of steel, cutting, bending, tying or welding, fixing in position etc., complete.
Supplying and providing brick masonary in cement mortar 1:4 (one cement and four sand) in foundations, beasement and superstructure walls using second class ground moulded chamber burnt bricks complete complying with standard specifications and drawings and as directed by departmental Engineers.
Plastering with cement mortor 1:4, 12mm thick with fine river for brick work including curing, neat finish, etc., complete complying with standard specification and as directed by the Departmental officers.
Supplying and filling with pcc for flooring as per standard specification including cost of labour head load, levelling, consolidation, material, labour, lead, lift etc complete.
Supplying fixing of structural steel/hollow sections as directed by engineers at site for roof truss works including cost of all materials labour, lead, painting, lift etc.,complete.
Roofing with Galvalume sheets of 0.50mm thick including cost of djustable ridges,U orJ bolts & nuts bitumen washers etc including cost of material,lead,lift, etc., complete.
Painting the walls with one coats of shell lime includiing through scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete complying with standard specificaion and as directed by the Department officer.
Painting the walls with TWO coats of first quality plastic emulsion paint of approved colour over a primer coat includiing through scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete complying with standard specificaion and as directed by the Department officer.
Manufacturing and supply of steel door using 40X40X6mm angle for outer frames & 35X35X6mm angle for inner frame & 35X6mm flat 3 Nos. & covered with 14 G MS sheets as per standard specification including cost of all materials, lead, labour for fabricating, fixing etc., complete as directed.
Roofing with Galvalume ridges of 0.50mm thick with screw bitumen washers etc including cost of material,lead,lift, etc., complete.
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
Schedule-56.xls
Additional Documents • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].