Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹36.5 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹37.8 Cr+₹1.3 Cr (3.67%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹41.0 Cr+₹4.5 Cr (12.4%)Admitted-Finance 260 RITAMBARA BUILDING TRIBHUWAN COMPLEX ISHWAR NAGAR WEST NEW DELHI 110065 | L3 | Admitted-Finance | ||
| 4 | L4₹43.6 Cr+₹7.1 Cr (19.5%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹49.8 Cr+₹13.3 Cr (36.5%)Admitted-Finance 17 1624A MUMDAMVELI KOCHI 682 507 | ERNAKULAM | KERALA | 682507 | L5 | Admitted-Finance |
Tender Value
₹48.8 Cr
EMD Value
₹97.6 L
Closing Date
22 Apr 2024, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer RNB Divn Budgam
Engineering complex Budgam
Construction of 125 bedded Hospital at Reshipora Budgam
2024_PWDJK_245716_1
NIT_NO_163_MDB of 2023-24
Open Tender
Civil Works
Percentage
950 days
Budgam
Please refer Tender documents.
8 documents required · 8 mandatory
₹14,000
Executive Engineer RNB Divn Budgam
₹97.6 L
Chief Engineer PW RnB Central Kashmir Srinagar
28 Jun 2024
24 Feb 2024
23 Apr 2024
24 Feb 2024
22 Apr 2024
27 Feb 2024
26 Feb 2024
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Civil Part | - | - | - | - |
| - | EARTHWORK: Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables, etc (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift up to 1.5m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres, all kinds of soil. | 1,574.36 | cum | 256.85 | ₹4,04,374.37 |
| - | STONE SOLING: Providing and laying of hand packed stone soling (size 150 mm-230mm), before laying of mud mat, compacted, consolidated, rammed and filling the voids with fine sand - all complete incl carriage upto site of work with all head loads. | 165.72 | cum | 950 | ₹1,57,434 |
| - | MUDMAT: Cast-in-situ of concrete work of nominal mix concrete M7.5 grade (1:4:8) nominal maximum size of stone aggregate 40mm volumetric batching in foundation trenches and ground floor, including curing but excluding formwork costs. (code 4.4.7) | 211 | cum | 5,202.9 | ₹10,97,811.9 |
| - | PILE WORK: Boring, providing and installing 600 mm dia bored cast-in-stu reinforced cement concrete pile of M30 conrete garde mix to carry a safe load working load not less than the specified, excluding the cost of steel reinforecement but including cost of boring with bentonite solution and temporary casing of appropriate length all complete including removal of excavated earth with all leads and lifts (Lenght of pile for payment shall be measured from top of pile shoe to bottom of pile cap. (code 21.2.1.3) | 7,361 | RM | 3,123.1 | ₹2,29,89,139.1 |
| - | PILE LOAD TEST: Vertical Load testinf of piles on accordance with IS: 2911 (Part IV) including installation of Loading Platform by Kentledge /Anchor pile Method and preperation of pile head or construction of test cap and dismantling of test cap after test etc complete as per specification and the direction of EIC. (code 21.6.1.1) | - | - | - | - |
| - | Initial Test | 1 | No | 1,59,533 | ₹1,59,533 |
| - | Routine Test | 8 | No | 1,75,486 | ₹14,03,888 |
| - | CAST-IN-STU DESIGN MIX M30: Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work,using cement content as per approved design mix,incluyding pumping of concrete to site laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportiond as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. Note: - Cement in this item is @ 340 kg/ cum. Excess or less cement used as per design mix is content considered payable or recoverable seperately all works Below Plinth Levl / Above Plinth Level upto level V (AGL/BGL).. (code 5.34) | - | - | - | - |
| - | UPTO PLINTH LEVEL | 1,442.6 | cum | 8,119.9 | ₹1,17,13,767.74 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.39 MB
Tendernotice_2.pdf
PDF • 1.77 MB
Tendernotice_3.pdf
PDF • 7.38 MB
BOQ_718772.xls
BOQ • 3.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .