| 1 | L1₹1.5 CrAccepted-AOC | ₹1.5 Cr | L1 | Accepted-AOC work order |
| 2 | L2₹1.6 Cr+₹7.5 L (4.96%)Rejected-Finance SOUTH THOTTAM PALAKKANTHU PO DINDIGUL WEST TALUK DINDIGUL 624 019 TAMIL NADU | 624019 | ₹1.6 Cr+₹7.5 L (4.96%) | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | VIHAAN CONSTRUCTIONS L1 | P S STALIN CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00Name of the work : 1. Upgradation the Road from Jothalnaicken kombai Dam Road Karuppusamy Kovil Road KM 0/0-1/300 (R-362) Estimate Amounts :175.00 Lakhs | |||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 1,103.76 | Sqm | 6 ₹6,622.56 Lowest | 6.3 ₹6,953.69 |
| 3.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 974.16 | cum | 140.45 ₹1,36,820.77 Lowest | 147 ₹1,43,201.52 |
| 4.00 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | 304.42 | cum | 341.01 ₹1,03,810.26 Lowest | 358 ₹1,08,982.36 |
| 5.00 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401 | 392.77 | cum | 2,419.69 ₹9,50,381.64 Lowest | 2,539 ₹9,97,243.03 |
| 6.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5 | 535.59 | cum | 2,476.15 ₹13,26,201.18 Lowest | 2,599 ₹13,91,998.41 |
| 7.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 3,570.6 | Sqm | 87 ₹3,10,642.2 Lowest | 91 ₹3,24,924.6 |
| 8.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 3,606 | Sqm | 20 ₹72,120 Lowest | 21 ₹75,726 |
| 9.00 | BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 90.14 | CUM | 11,740.83 ₹10,58,318.42 Lowest | 12,327 ₹11,11,155.78 |
| 10.00 | Supply of Kilometre stone of size 1.65m x 0.45 x 0.15m including all charges etc., | 1 | No | 2,197 ₹2,197 Lowest | 2,306 ₹2,306 |
Tender Value
Refer Docs
EMD Value
₹1.8 L
Closing Date
24 Feb 2026, 3:00 pmClosed
THE PROJECT DIRECTOR, DRDA DINDIGUL
THE PROJECT DIRECTOR, DRDA DINDIGUL
Strenghthening of 1 road in Reddiarchatram block of Dindigul District under MGSMT (Additional) 2025-26 TN05-18
2026_RDTN_658425_1
DIPR/1084/TENDER/2026
Open Tender
Civil Works
Item Wise
180 days
DRDA
Strenghthening of 1 road in Reddiarchatram block of Dindigul District under MGSMT (Additional) 2025-26 TN05-18
3 documents required · 3 mandatory
₹0
₹1.8 L
DRDA, DINDIGUL
18 Mar 2026
16 Feb 2026
24 Feb 2026
16 Feb 2026
24 Feb 2026
16 Feb 2026
20 Feb 2026
Name of the work : 1. Upgradation the Road from Jothalnaicken kombai Dam Road Karuppusamy Kovil Road KM 0/0-1/300 (R-362) Estimate Amounts :175.00 Lakhs
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Supply of Kilometre stone of size 1.65m x 0.45 x 0.15m including all charges etc.,
Supply of HM stone of size 1.65m x 0.45 x 0.15m including all charges etc.,
Provision for 60 cm Equilateral triangle cautionary Sign Board
Sub Estimate
Vented Causeway 10m
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Providing and laying for plain cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials at site and watering and compacting etc.,complete complying with standard specifications
Centering : Supplying and erecting centering for sides and soffits including support and strutting up to 3.29m high for plane surface such as using mild steel sheets of size 90 x 40 cm and BG 10 stiffened with welded mild steel angle of size 25x25x3mm for boarding laid over silver oak (country wood) joists of size 10x6.50cm spaced at about 90 centre to centre and supported by casaurina props of 10 - 13cm dia spaced at 75cm c/c etc. complete.
Supply and fabrication of S-415 steel required for all RCC items of works involved in the schedule including cost of steel at site including cost of fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover, blocks and all other incidental charges etc complete, as per standard specification for culvert.for Bed block & Deck slab
RCC 1:1.5: 3 using 20mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel, including labour charges for mixing, transporting, laying, curing co
Wearing Coat 75mm
Expansion joint
Guide post
Sub Estimate
6m Span Culvert
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Depth upto 0.30m
Providing and laying for plain cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials at site and watering and compacting etc.,complete complying with standard specifications
Providing and laying for plain cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials at site and watering and compacting etc.,complete complying with standard specifications
RCC 1:1.5: 3 using 20mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel, including labour charges for mixing, transporting, laying, curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete for DIRT WALL CUM BED BLOCK OVER ABUTMENTS
Providing and laying Reinforced cement concrete 1:1.5:3 using 20mm ISS HBG metal in superstructure as per drawings and MORD technical specification clauses 800,1250.4 & 1205.5 Design mix M25 for Deck slab
Centering : Supplying and erecting centering for sides and soffits including support and strutting up to 3.29m high for plane surface such as using mild steel sheets of size 90 x 40 cm and BG 10 stiffened with welded mild steel angle of size 25x25x3mm for boarding laid over silver oak (country wood) joists of size 10x6.50cm spaced at about 90 centre to centre and supported by casaurina props of 10 - 13cm dia spaced at 75cm c/c etc. complete. for Below sill
Centering : Supplying and erecting centering for sides and soffits including support and strutting up to 3.29m high for plane surface such as using mild steel sheets of size 90 x 40 cm and BG 10 stiffened with welded mild steel angle of size 25x25x3mm for boarding laid over silver oak (country wood) joists of size 10x6.50cm spaced at about 90 centre to centre and supported by casaurina props of 10 - 13cm dia spaced at 75cm c/c etc. complete. for Above sill
Supply and fabrication of S-415 steel required for all RCC items of works involved in the schedule including cost of steel at site including cost of fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover, blocks and all other incidental charges etc complete, as per standard specification for culvert.for Bed block & Deck slab
Providing and fixing Bitumenpad in between Deck slabs over abutment and pier as shown in the Drawing including cost and conveyance of expansion Joints including Shalimar pad and joint sealant etc., Complete
Providing and fixing Kraft paper full width of deck slab and including cost and conveyance to work site, labour for fixing the same in corect position and all other incidental charges etc.,complete as per standard specifications.
Gravel filling behind the Abutments and wings with clean gritty gravel including cost and conveyance of gravel to worksite, including labour charges for filling in layers, watering, tamping under optimum moisture content to get the maximum density all other incidental charges etc., complete.
Providing and fixing 100 mm Dia PVC Seepage pipes of required lengths for abutment and retaining walls including cost and conveyance of all materials to work site. Cost and labour for semispherical back fill arrangements with 100 mm size broken granite chips at the periphery and labour charges for fixing etc complete to drain the backfill as per standard specification.
Sub Estimate
3m SpanCulvert 1110m
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Depth upto 0.30m
Providing and laying for plain cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials at site and watering and compacting etc.,complete complying with standard specifications
Providing and laying for plain cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials at site and watering and compacting etc.,complete complying with standard specifications
Providing and laying Plain cement concrete 1:2:4 using 20mm ISS HBG metal in superstructure as per drawings and MORD technical specification clauses 800,1250.4 & 1205.5 Design mix M25 for Bed block & Dirt wall
Providing and laying Reinforced cement concrete 1:1.5:3 using 20mm ISS HBG metal in superstructure as per drawings and MORD technical specification clauses 800,1250.4 & 1205.5 Design mix M25 for Deck slab
Centering : Supplying and erecting centering for sides and soffits including support and strutting up to 3.29m high for plane surface such as using mild steel sheets of size 90 x 40 cm and BG 10 stiffened with welded mild steel angle of size 25x25x3mm for boarding laid over silver oak (country wood) joists of size 10x6.50cm spaced at about 90 centre to centre and supported by casaurina props of 10 - 13cm dia spaced at 75cm c/c etc. complete. for Below sill
Centering : Supplying and erecting centering for sides and soffits including support and strutting up to 3.29m high for plane surface such as using mild steel sheets of size 90 x 40 cm and BG 10 stiffened with welded mild steel angle of size 25x25x3mm for boarding laid over silver oak (country wood) joists of size 10x6.50cm spaced at about 90 centre to centre and supported by casaurina props of 10 - 13cm dia spaced at 75cm c/c etc. complete. for Above sill
Supply and fabrication of S-415 steel required for all RCC items of works involved in the schedule including cost of steel at site including cost of fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover, blocks and all other incidental charges etc complete, as per standard specification for culvert.for Bed block & Deck slab
Providing and fixing Bitumenpad in between Deck slabs over abutment and pier as shown in the Drawing including cost and conveyance of expansion Joints including Shalimar pad and joint sealant etc., Complete
Providing and fixing Kraft paper full width of deck slab and including cost and conveyance to work site, labour for fixing the same in corect position and all other incidental charges etc.,complete as per standard specifications.
Gravel filling behind the Abutments and wings with clean gritty gravel including cost and conveyance of gravel to worksite, including labour charges for filling in layers, watering, tamping under optimum moisture content to get the maximum density all other incidental charges etc., complete.
Providing and fixing 100 mm Dia PVC Seepage pipes of required lengths for abutment and retaining walls including cost and conveyance of all materials to work site. Cost and labour for semispherical back fill arrangements with 100 mm size broken granite chips at the periphery and labour charges for fixing etc complete to drain the backfill as per standard specification.
Sub Estimate
Retaining wall 30m to 80m,920m to 990m
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Providing and laying for plain cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials at site and watering and compacting etc.,complete complying with standard specifications
Providing and laying for plain cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials at site and watering and compacting etc.,complete complying with standard specifications
Supplying & Erecting for centering and shuttering charges for all PCC works including all cost and conveyance of all materials and all labour charges etc complete
Sub Estimate
Hard bed 340m to 415m
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified ) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 with From works
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.61 MB
Tendernotice_2.pdf
PDF • 0.47 MB
BOQ_789883.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .