| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAccepted-AOC | ₹1.8 Cr | L1 | Accepted-AOC Lowest Amount Quoted |
| 2 | L2₹1.8 Cr+₹45,396.60 (0.26%)Rejected-Finance KOLLIDAM | ₹1.8 Cr+₹45,396.60 (0.26%) | L2 | Rejected-Finance Highest amount quoted |
Tender Value
₹1.8 Cr
EMD Value
₹1.8 L
Closing Date
8 May 2023, 3:00 pmClosed
The district Collector,Mayiladuthurai
The district Collector office ,Mayiladuthurai
Strenthening Puthupattinam - Thonithurai - G.H Road, Strenthening Of Thoduvai to Thirumullaivasal Annanagar Link Road, Strenthening Of Road Chinna Othavanthangudy Road ,Madanam - Vadapathy Road, in kollidam block
2023_RDTN_301593_1
G.o No34 RD and PR(SGS2)Department Date 18.03.2023
Open Tender
Civil Works - Roads
Item Wise
180 days
Kollidam
Please refer Tender documents.
10 documents required · 10 mandatory
₹0
₹1.8 L
Yes
12 Jul 2023
12 Apr 2023
8 May 2023
12 Apr 2023
8 May 2023
12 Apr 2023
12 Apr 2023 - 14 Apr 2023
Amount
Strengtheing of road from vadapathi Road (R-186)0/0-0/770 @ mathanam Panchayat Package 4.1
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading etc.complete,
Providing and laying 75mm compacted thick WBM Grade II using 1 cum of 75mm to 22.4mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for BOTTOM LAYER
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER
Prodining and laying of prime coat using emulsion at the rate of 7 kg per the squarew meter over the WMM/WBM surface
Applying tack coat over BT surface (not treated with primer) using 2.5Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 c
Road marking with hot applied thermoplastic compound with reflecting glss beads on bituminous surface
Provision for ,Hm stone,
Provision for Name board
Photo Charges
60 cm Equilateral triangle (Cautionary) sign Board
Sub Estimate for Construction of RCC 1.5m span Slab Culvert 0/005m
Earth work excavation in hard stiff clay soil and all classess of soil and depositing on bank with initial lead and lift as per SS20B.
Sand filling with river sand good quality including cost and conveyance of all materials to site including watering and compacting etc complete.
Cement concrete with (1:4:8) mix using 40mm ISS HBG metal including cost and conveyance of all materials and labour charges etc complete.
Cement concrete with (1:3:6) mix using 40mm ISS HBG metal including cost and conveyance of all materials and labour charges etc complete.
Steel centering including all labour chargesfor R.C.C works.
Steel centering including all labour chargesfor R.C.C works.
Plain Cement concrete 1:2:4 using 20mm HBG jelly including cost and conveyance of all labour charges etc.
R.C.C (1:1 1/2:3) using 20mm HBG metal including cost and conveyance of all labour charges etc.
Suppling and fabrication charges for Steel including cost and conveyance of all materials and labour charges etc complete.
Provision for Bitumen Felt 6 mm thick pad
Provision for fixing tar paper for bearing
Provision for weep holes in Plain concrete 110mm dia ac PVC pipe for 4ksc
Gravel fillinng Body wall including cost and conveyance of gravel watering compacteinbg etc completed
Sub Estimate for Construction of RCC 1.5m span Slab Culvert ch 0/325m
Earth work excavation in hard stiff clay soil and all classess of soil and depositing on bank with initial lead and lift as per SS20B.
Sand filling with river sand good quality including cost and conveyance of all materials to site including watering and compacting etc complete.
Cement concrete with (1:4:8) mix using 40mm ISS HBG metal including cost and conveyance of all materials and labour charges etc complete.
Cement concrete with (1:3:6) mix using 40mm ISS HBG metal including cost and conveyance of all materials and labour charges etc complete.
Steel centering including all labour chargesfor R.C.C works.
Steel centering including all labour chargesfor R.C.C works.
Plain Cement concrete 1:2:4 using 20mm HBG jelly including cost and conveyance of all labour charges etc.
R.C.C (1:1 1/2:3) using 20mm HBG metal including cost and conveyance of all labour charges etc.
Suppling and fabrication charges for Steel including cost and conveyance of all materials and labour charges etc complete.
Provision for Bitumen Felt 15 mm thick pad
Provision for fixing tar paper for bearing
Provision for weep holes in Plain concrete 110mm dia ac PVC pipe for 4ksc
Gravel fillinng Body wall including cost and conveyance of gravel watering compacteinbg etc completed
Sub Estimate for Construction of Retaining wall ch 0/415 - 0/435
Earth work excavation in hard stiff clay soil and all classess of soil and depositing on bank with initial lead and lift as per SS20B.
Sand filling with river sand good quality including cost and conveyance of all materials to site including watering and compacting etc complete.
Cement concrete with (1:4:8) mix using 40mm ISS HBG metal including cost and conveyance of all materials and labour charges etc complete.
Cement concrete with (1:3:6) mix using 40mm ISS HBG metal including cost and conveyance of all materials and labour charges etc complete.
Steel centering including all labour chargesfor R.C.C works.
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
Strenthening Of Road to Thoduvai - thirumullaivasal anna nagar link road (R-602) 0/0-1/260 @thirumullaivasal Panchayat Package 4.2
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading etc.complete,
Providing and laying 75mm compacted thick WBM Grade II using 1 cum of 75mm to 22.4mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for BOTTOM LAYER
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER
Prodining and laying of prime coat using emulsion at the rate of 7 kg per the squarew meter over the WMM/WBM surface
Applying tack coat over BT surface (not treated with primer) using 2.5Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 c
Road marking with hot applied thermoplastic compound with reflecting glss beads on bituminous surface
Provision for ,Hm stone,
Provision for Name board
Photo Charges
60 cm Equilateral triangle (Cautionary) sign Board
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
Strenthening Of Road to Chinna oothavanthankudi Road (R-118) 0/0-0/820m Panchayat Package 4.3
Picking 5cm to 10cm old metalled surface and sectioning -1 sq.m
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading etc.complete,
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Providing and laying 75mm compacted thick WBM Grade II using 1 cum of 75mm to 22.4mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for BOTTOM LAYER
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER
Prodining and laying of prime coat using emulsion at the rate of 7 kg per the squarew meter over the WMM/WBM surface
Applying tack coat over BT surface (not treated with primer) using 2.5Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 c
Road marking with hot applied thermoplastic compound with reflecting glss beads on bituminous surface
Provision for ,Hm stone,
Provision for Name board
60 cm Equilateral triangle (Cautionary) sign Board
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
Strenthening Of Road to Puhtupattinam - thonithurai GH road in puthupattinam (R-215) 0/0-1/0 Panchayat Package 4.4
clearing and scrub light jungle
Picking 5cm to 10cm old metalled surface and sectioning -1 sq.m
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading etc.complete,
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Providing and laying 75mm compacted thick WBM Grade II using 1 cum of 75mm to 22.4mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for BOTTOM LAYER
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER
Prodining and laying of prime coat using emulsion at the rate of 7 kg per the squarew meter over the WMM/WBM surface
Applying tack coat over BT surface (not treated with primer) using 2.5Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 c
Road marking with hot applied thermoplastic compound with reflecting glss beads on bituminous surface
Provision for ,Hm stone,
Provision for ,Km stone,
Provision for Name board
Photo Charges
60 cm Equilateral triangle (Cautionary) sign Board
Sub Estimate for Construction of RCC 1.5m span Slab Culvert ch 0/325m
Earth work excavation in hard stiff clay soil and all classess of soil and depositing on bank with initial lead and lift as per SS20B.
Sand filling with river sand good quality including cost and conveyance of all materials to site including watering and compacting etc complete.
Cement concrete with (1:4:8) mix using 40mm ISS HBG metal including cost and conveyance of all materials and labour charges etc complete.
Cement concrete with (1:3:6) mix using 40mm ISS HBG metal including cost and conveyance of all materials and labour charges etc complete.
Steel centering including all labour chargesfor R.C.C works.
Steel centering including all labour chargesfor R.C.C works.
Plain Cement concrete 1:2:4 using 20mm HBG jelly including cost and conveyance of all labour charges etc.
R.C.C (1:1 1/2:3) using 20mm HBG metal including cost and conveyance of all labour charges etc.
Suppling and fabrication charges for Steel including cost and conveyance of all materials and labour charges etc complete.
Provision for Bitumen Felt 15 mm thick pad
Provision for fixing tar paper for bearing
Provision for weep holes in Plain concrete 110mm dia ac PVC pipe for 4ksc
Gravel fillinng Body wall including cost and conveyance of gravel watering compacteinbg etc completed
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
jj engineering construction
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .