Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.6 LAdmitted-Fee/PreQual/Technical/Finance | ₹10.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹10.8 L+₹16,608.96 (1.56%)Admitted-Fee/PreQual/Technical/Finance | ₹10.8 L+₹16,608.96 (1.56%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹11.6 L+₹93,473.44 (8.79%)Admitted-Fee/PreQual/Technical/Finance | ₹11.6 L+₹93,473.44 (8.79%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹12.2 L+₹1.6 L (15.1%)Admitted-Fee/PreQual/Technical/Finance AT JAMUSAHI PO DEULI PS BEGUNIA DIST KHORDHA PIN 752064 | BEGUNIA | KHORDHA | ODISHA | 752064 | ₹12.2 L+₹1.6 L (15.1%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹12.9 L+₹2.3 L (21.6%)Admitted-Fee/PreQual/Technical/Finance | ₹12.9 L+₹2.3 L (21.6%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | AMBIKA PRASAD BEHERA L5 | Tapan Mahapatra L6 | UDAYA NATH SWAIN L3 | SARITA MOHAPATRA L1 | FIDA HOSEN KHAN L4 | RAMAKANTA BISWAL L7 | JHARANA DAS L2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Site clearance & approach road for construction work | 470 | sqm | 2.28 ₹1,071.6 | 1 ₹470 Lowest | 1.97 ₹925.9 | 1.83 ₹860.1 | 2.2 ₹1,034 | 2.29 ₹1,076.3 | 1.86 ₹874.2 |
| 2.00 | Drilling a perfectly vertical bore hole of 150mm/100mm dia in hard rock formation as required to the site condition as per direction including cost of acssesories,tools & plants,consumables & rig charges etc. complete | 300 | Mtr | 646 ₹1,93,800 | 647 ₹1,94,100 | 558.55 ₹1,67,565 | 518.16 ₹1,55,448 Lowest | 566.3 ₹1,69,890 | 647.68 ₹1,94,304 | 526.26 ₹1,57,878 |
| 3.00 | Lowering Of 125mm dia blank PVC pipe 80 Sch. Without 3 mtr slot in perfectly vertical position including cost of pipes etc complete | 250 | Mtr | 874 ₹2,18,500 | 876 ₹2,19,000 | 756.02 ₹1,89,005 | 701.34 ₹1,75,335 Lowest | 766.97 ₹1,91,742.5 | 876.63 ₹2,19,157.5 | 712.3 ₹1,78,075 |
| 4.00 | Lowering Of 125mm dia blank PVC pipe 80 Sch. With 3 mtr slot in perfectly vertical position including cost of pipes etc complete | 30 | Mtr | 878 ₹26,340 | 880 ₹26,400 | 759 ₹22,770 | 704.11 ₹21,123.3 Lowest | 770 ₹23,100 | 880.11 ₹26,403.3 | 715.11 ₹21,453.3 |
| 5.00 | Operation of Compressor for development of B/W LS | 10 | No | 2,802 ₹28,020 | 2,809 ₹28,090 | 2,422.59 ₹24,225.9 | 2,247.39 ₹22,473.9 Lowest | 2,457.7 ₹24,577 | 2,809.15 ₹28,091.5 | 2,282.5 ₹22,825 |
| 6.00 | Well Cap 5" Dia With PVC Cone | 10 | No | 399 ₹3,990 | 400 ₹4,000 | 345 ₹3,450 | 320.05 ₹3,200.5 Lowest | 350 ₹3,500 | 400.05 ₹4,000.5 | 325.05 ₹3,250.5 |
| 7.00 | Supplying & Lying of R C C Ring 5ft made up of 6 mm dia MS rod for storage cum recharge pit including cost, transporting etc complete. | 120 | Nos | 1,117 ₹1,34,040 | 1,100 ₹1,32,000 | 966 ₹1,15,920 | 896.14 ₹1,07,536.8 Lowest | 1,050 ₹1,26,000 | 1,120.14 ₹1,34,416.8 | 910.14 ₹1,09,216.8 |
| 8.00 | Earth work excavation in stoney earth or gravely soil mixed with boulder not exceeding 0.014cum within 50m initial lead & 1.5m initial lift including rough dressing & breaking clods to minimum 5cm to 7cm as per the direction 1st extra lift of 1.5 mtr. | 141.3 | cum | 352 ₹49,737.6 | 353 ₹49,878.9 | 304.4 ₹43,011.72 | 282.39 ₹39,901.71 Lowest | 334.12 ₹47,211.16 | 352.98 ₹49,876.07 | 286.8 ₹40,524.84 |
| 9.00 | Earth work excavation in stoney earth or gravely soil mixed with boulder not exceeding 0.014cum within 50m initial lead & 1.5m initial lift including rough dressing & breaking clods to minimum 5cm to 7cm as per the direction 2nd t extra lift of 1.5 mtr. | 53 | cum | 555 ₹29,415 | 555 ₹29,415 | 679.86 ₹36,032.58 | 445.16 ₹23,593.48 Lowest | 556.36 ₹29,487.08 | 556.43 ₹29,490.79 | 452.11 ₹23,961.83 |
| 10.00 | Earth work excavation in stoney earth or gravely soil mixed with boulder not exceeding 0.014cum within 50m initial lead & 1.5m initial lift including rough dressing & breaking clods to minimum 5cm to 7cm as per the direction Filter Bed 3rd extra lift of 1.5 mtr. | 53 | cum | 572 ₹30,316 | 574 ₹30,422 | 495.35 ₹26,253.55 | 459.53 ₹24,355.09 Lowest | 559.96 ₹29,677.88 | 574.4 ₹30,443.2 | 466.71 ₹24,735.63 |
Tender Value
₹16.6 L
EMD Value
₹16,700
Closing Date
4 Jul 2026, 11:00 amClosed
Executive Engineer GWD Division 1
o/o the Executive Engineer , GWD Division 1 , Bhubaneswar
Construction of 10 nos. Recharge shafts in Tanks/Ponds in Bolagarh Block (ph-1) area of Khordha district for the FY -2026-27.
2026_GWSI_132804_1
GWD DIV-1BBSR-02/26-27
Open Tender
Civil Works - Others
Item Rate
60 days
Bolagarh Block
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹16,700
Yes
4 Jul 2026
24 Jun 2026
4 Jul 2026
24 Jun 2026
4 Jul 2026
24 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Site clearance & approach road for construction work | - | sqm | 2.86 | - |
| 2 | Drilling a perfectly vertical bore hole of 150mm/100mm dia in hard rock formation as required to the site condition as per direction including cost of acssesories,tools & plants,consumables & rig charges etc. complete | - | Mtr | 809.5 | - |
| 3 | Lowering Of 125mm dia blank PVC pipe 80 Sch. Without 3 mtr slot in perfectly vertical position including cost of pipes etc complete | - | Mtr | 1,095.68 | - |
| 4 | Lowering Of 125mm dia blank PVC pipe 80 Sch. With 3 mtr slot in perfectly vertical position including cost of pipes etc complete | - | Mtr | 1,100 | - |
| 5 | Operation of Compressor for development of B/W LS | - | No | 3,511 | - |
| 6 | Well Cap 5" Dia With PVC Cone | - | No | 500 | - |
| 7 | Supplying & Lying of R C C Ring 5ft made up of 6 mm dia MS rod for storage cum recharge pit including cost, transporting etc complete. | - | Nos | 1,400 | - |
| 8 | Earth work excavation in stoney earth or gravely soil mixed with boulder not exceeding 0.014cum within 50m initial lead & 1.5m initial lift including rough dressing & breaking clods to minimum 5cm to 7cm as per the direction 1st extra lift of 1.5 mtr. | - | cum | 441.17 | - |
| 9 | Earth work excavation in stoney earth or gravely soil mixed with boulder not exceeding 0.014cum within 50m initial lead & 1.5m initial lift including rough dressing & breaking clods to minimum 5cm to 7cm as per the direction 2nd t extra lift of 1.5 mtr. | - | cum | 695.45 | - |
| 10 | Earth work excavation in stoney earth or gravely soil mixed with boulder not exceeding 0.014cum within 50m initial lead & 1.5m initial lift including rough dressing & breaking clods to minimum 5cm to 7cm as per the direction Filter Bed 3rd extra lift of 1.5 mtr. | - | cum | 717.91 | - |
stage.html
html • 0.03 MB
finance_597648.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.18 MB
tender.pdf
Tender Documents • 2.57 MB
BOQ_597648.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .