| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.0 LAccepted-Finance | ₹29.0 L | L1 | Accepted-Finance Lowest quated bidder |
| 2 | L2₹29.7 LRejected-Finance | ₹29.7 L | L2 | Rejected-Finance 2nd Lowest quated bidder |
| 3 | L3₹29.8 LRejected-Finance | ₹29.8 L | L3 | Rejected-Finance Highest Quated bidder |
| Sl No | Description | Qty | Unit | DURAIRAJ L3 | SARAVANA TRADERS L1 | R RAJAN L2 |
|---|---|---|---|---|---|---|
| 1.00CONSTRUCTION OF COMMUNITYHALL ,KITCHENSHED AND TOILET AT KINNAKORAIHADA H/O MELKUNDHA | ||||||
| 2.00 | Earthwork excavation and depositing on bank with initial lead and lift in all class of soil including all etc complete | 44.43 | cum | 370 ₹16,439.10 | 360 ₹15,994.80 | 369 ₹16,394.67 |
| 3.00 | Filling with sand including all etc complete complying with standard specification | 2.16 | cum | 3,185 ₹6,879.60 | 3,104 ₹6,704.64 | 3,183 ₹6,875.28 |
| 4.00 | Cement concrete 1:4:8 mix using 40mm HBG metal for foundation including all etc complete | 17.67 | cum | 8,365 ₹1.5 L | 8,152 ₹1.4 L | 8,361 ₹1.5 L |
| 5.00 | Supply and fabrication of steel including all etc complete complying with standard specification | 2.75 | mt | 1,06,790 ₹2.9 L | 1,04,117 ₹2.9 L | 1,06,786 ₹2.9 L |
| 6.00 | Supply and erection centering with necessary supports including all etc complete complying with standard specification 1.columns | 64.71 | sqm | 1,625 ₹1.1 L | 1,581 ₹1.0 L | 1,621 ₹1.0 L |
| 7.00 | 2.Beams and Slab | 198.26 | sqm | 1,475 ₹2.9 L | 1,437 ₹2.8 L | 1,474 ₹2.9 L |
| 8.00 | 3.Loft and Sunshade | 27.33 | sqm | 1,625 ₹44,411.25 | 1,581 ₹43,208.73 | 1,621 ₹44,301.93 |
| 9.00 | Reinforced cement concrete 1:1.5:3mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing ,laying ,and curing etc complete for 10 cum 1.Foundation & Basement | 37.43 | cum | 12,980 ₹4.9 L | 12,655 ₹4.7 L | 12,979 ₹4.9 L |
| 10.00 | Filling with excavated earth including all etc complete complying with standard specificartion | 39.46 | cum | 165 ₹6,510.90 | 161 ₹6,353.06 | 164 ₹6,471.44 |
Tender Value
₹30 L
EMD Value
₹30,000
Closing Date
23 Dec 2025, 3:00 pmClosed
BLOCK DEVELOPEMENT OFFICER VP
BLOC DEVELOPEMENT OFFICE
CONSTRUCTION OF COMMUNITYHALL KITCHENSHED AND TOILET AT KINNAKORAIHADA MELKUNDHA
2025_RDTN_633694_1
SADP COMMUNITYHALL KINNAKORAI
Open Tender
Civil Works - Buildings
90 days
PANCHAYAT UNION UDHAGAI
AS PER TENDER NOTICE
3 documents required · 3 mandatory
₹0
₹30,000
Yes
BLOC DEVELOPEMENT OFFICE
7 Mar 2026
17 Dec 2025
23 Dec 2025
17 Dec 2025
23 Dec 2025
17 Dec 2025
18 Dec 2025
Amount
CONSTRUCTION OF COMMUNITYHALL ,KITCHENSHED AND TOILET AT KINNAKORAIHADA H/O MELKUNDHA
Earthwork excavation and depositing on bank with initial lead and lift in all class of soil including all etc complete
Filling with sand including all etc complete complying with standard specification
Cement concrete 1:4:8 mix using 40mm HBG metal for foundation including all etc complete
Supply and fabrication of steel including all etc complete complying with standard specification
Supply and erection centering with necessary supports including all etc complete complying with standard specification 1.columns
2.Beams and Slab
3.Loft and Sunshade
Reinforced cement concrete 1:1.5:3mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing ,laying ,and curing etc complete for 10 cum 1.Foundation & Basement
Filling with excavated earth including all etc complete complying with standard specificartion
Brick work in n cement mortar 1:5 mix country bricks of size 23*11*7 including all etc complete complying with standard specification
Finishing the ceiling with wall putty including all etc complete complying with standard specification
Platering with cement mortar 1:3 mix 10 mm thick RCC exposed surface like roof slab and sunshade including cost and conveyance of all materials to site and all labour charges
Platering with cement mortar 1:5 mix 12 mm thick RCC exposed surface like roof slab and sunshade including cost and conveyance of all materials to site and all labour charges
Paving the floor with scratch proof ceramic tiles in cement mortor 1:3 mix including all etc completed
Cement concrete 1:2:4 mix using 20mm HBG metal for foundation including all etc complete
Painting two coats with exterior emultion over one priming coat of cement paint over new cement plastered wall surface and ceiling including all etc complete
Painting two coats with synthetic enamel paint of approved quality new iron work including all etc complete
Towards supply of steel door including all etc complete
Towards supply of UPVC windows including all etc complete
Light /fan point
Plug Point
TNEB meter Board
LED Tube Light
Service connection
Provision for labour charges for fixing Doors and Windows
Provision for Toilet Sub Estimate
Earthwork excavation and depositing on bank with initial lead and lift in all class of soil including all etc complete
Cement concrete 1:4:8 mix using 40mm HBG metal for foundation including all etc complete
Random rubble masonry in cm 1:5 mix using New stones including all etc completed
Brick work in n cement mortar 1:5 mix country bricks of size 23*11*7 including all etc complete complying with standard specification
Supply and fabrication of steel including all etc complete complying with standard specification
Supply and erection centering with necessary supports including all etc complete complying with standard specification
Reinforced cement concrete 1:1.5:3mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing ,laying ,and curing etc complete for 10 cum 1.Foundation & Basement
Finishing the Exposed surface with wall putty including all etc complete complying with standard specification
Platering with cement mortar 1:3 mix 10 mm thick RCC exposed surface like roof slab and sunshade including cost and conveyance of all materials to site and all labour charges
Platering with cement mortar 1:5 mix 12 mm thick RCC exposed surface like roof slab and sunshade including cost and conveyance of all materials to site and all labour charges
Paving the floor with scratch proof ceramic tiles in cement mortor 1:3 mix including all etc completed
Dadooing the wall with glazed tiles 15cm x15cm x15cm laid in cm 1:2 10mm thick
Painting two coats with exterior emultion over one priming coat of cement paint over new cement plastered wall surface and ceiling including all etc complete
Painting two coats with synthetic enamel paint of approved quality new iron work including all etc complete
Towards supply and fixing of steel door including all etc complete
Towards supply and fixing of jolly including all etc complete
Light /fan point
Towards supply and fixing of RCC Rings including all etc complete
Towards supply and fixing of RCC Cover slab including all etc complete
Towards supply and fixing of 110mm dia PVC Pipe including all etc complete
Towards supply and fixing of IWC with Footrest including all etc complete
Towards supply and fixing of IWC including all etc complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
R RAJAN (BID ID -1537995)
DURAIRAJ (BID ID -1538045)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.31 MB
TECHBID.pdf
Tender Documents • 0.89 MB
PRICEBID.pdf
Additional Documents • 0.56 MB
BOQ_758180.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid