| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.1 CrAdmitted-Finance | -19.99% | ₹10.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹10.2 CrAdmitted-Finance HABITAT STREET MAIN ROAD VIII WARD NO 10 GP WARD WARD NO 10 BLOCK ULB NABARANGAPUR MPL P O DIST NABARANGAPUR 764059 ODISHA | NABARANGPUR | ODISHA | 764059 | -18.59% | ₹10.2 Cr | L2 | Admitted-Finance |
| 3 | L3₹10.3 CrAdmitted-Finance AT ANANTAPUR BALIANTA PHULNAKHARA DIST KHURDA ODISHA | PHULNAKHARA | KHURDA | ODISHA | -17.99% | ₹10.3 Cr | L3 | Admitted-Finance |
| 4 | L4₹10.8 CrAdmitted-Finance S O MENEJAR NAYAK BRAHMIN STREET GP PO BISSAMCUTTACK BLOCK PS BISSAMCUTTACK DIST RAYAGADA ODISHA PIN 765019 | RAYAGADA | ODISHA | 765019 | -14.39% | ₹10.8 Cr | L4 | Admitted-Finance |
| 5 | L5₹11.3 CrAdmitted-Finance | -9.99% | ₹11.3 Cr | L5 | Admitted-Finance |
Tender Value
₹12.6 Cr
EMD Value
₹12.6 L
Closing Date
4 May 2026, 5:00 pmClosed
Chief Engineer, Buildings-I, Odisha, Bhubaneswar.
O/o. the E.I.C. (Civil), Odisha, Unit-V, Nirman Soudha, Bhubaneswar.
Construction of New Circuit House Building at Dhenkanal.
2026_EICCL_128160_1
CE-Bldg-I-56/2025-26
Open Tender
Civil Works - Buildings
455 days
DHENKANAL DIST
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹12.6 L
Yes
4 Jun 2026
15 Apr 2026
5 May 2026
15 Apr 2026
4 May 2026
15 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORK
Earth work in excavation of foundation trenches in hard soil including dressing of sides and levelling the bed up to the required depth and depositing the excavated materials away from the work site within 50m initial lead & 1.5m initial lifts with sundries & T&P required for the work complete including cost of all labour,labour cess,T&P,sundries etc. as directed by the Engineer in charge. | - | Cum | - | - |
| 2 | Supplying and filling in foundation and plinth with good quality river sand including watering, ramming with cost, conveyances, royalties of all materials and cost of all labour with T&P required for the work etc. complete as per specification & direction of Engineer-in-charge. | - | Cum | - | - |
| 3 | Providing and laying plain cement concrete of proportion (1:3:6) in foundation and floors using 4 cm. size black hard crusher broken granite stone metal and screened and washed sharp sand for mortar of approved quality and from approved quarry including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not exceeding 15 cm. thick in each layer including cost, conveyance, royalties of all materials and cost of all labours,labour cess, T&P etc complete as per the direction of the Engineer-in-charge. | - | Cum | - | - |
| 4 | Plain cement concrete (1:2:4) using 12mm size black hard crusher broken granite chips of approved quality from approved quarry including hoisting, lowering and laying concrete in layers, watering, curing etc. complete including cost, conveyance, royalties of all materials with labour,labour cess and T&P etc. required for the work complete as per the direction of the Engineer-in-charge. | - | Cum | - | - |
| 5 | Providing, lifting, hoisting and laying Reinforced cement concrete of M-25 grade as per approved designs and drawings having a minimum compressive strength (in work test) 250 Kg. / Square cm. in 15 cm. cubes at 28 days after mixing and test conducted in accordance with I.S. 516 using 12 mm. to 20 mm. size black hard crushed broken granite stone chips and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned ( 20mm. size chips not to exceeds 25 % ) to be mixed in concrete mixture with Portland slag cement (PSC) including hoisting, lowering, laying and compaction concrete by using vibrators, watering and curing for 28 days, centering and shuttering then after dismantling and removing debris from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, sundries, T & P required of the work etc. complete in all respect as directed by the Engineer-in-Charge. But excluding cost and conveyance of M.S. rods or Tor steel and binding wires and labour charges for straightening, cutting, bending etc. of M.S. rods or tor steel tying the grills and placing in proper position.
Footing. | - | - | - | - |
| 6 | COLUMN BASE FOOTING | - | Cum | - | - |
| 7 | COLUMN SUPER STRUCTURE | - | - | - | - |
| 8 | Ground Floor | - | Cum | - | - |
| 9 | First Floor | - | Cum | - | - |
| 10 | Second Floor | - | Cum | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.29 MB
BOQ_587887.xls
BOQ • 0.78 MB
DTCN.pdf
Tender Documents • 17.23 MB
Download all tender documents and submit your bid