Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical BHIWANI | BHIWANI | BHIWANI | HARYANA | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical VPO MAHRA VPO MAHRA TEHSIL GOHANA 131301 | SONIPAT | HARYANA | 131301 | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical H N 1865 SECTOR 2 ROHTAK PIN 124001 | ROHTAK | ROHTAK | HARYANA | 124001 | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical HSVP OFFICE COMPLEX SECTOR 13 HISAR | HISAR | HISAR | HARYANA | Admitted-Fee/PreQual/Technical |
Tender Value
₹42.9 L
EMD Value
₹86,000
Closing Date
29 May 2026, 5:00 pmClosed
BHUPENDER SINGH
DIV 1 Hissar
Construction of retaining walls and side slopes of drain from 10 MLD STP to Ghuskani Link Drain and all other works contingent thereto
2026_HBC_523889_1
2026EB64A3D9 51D6 4199 AFCB AF10A4F133D0259HSV
Open Tender
Civil Works
Works
180 days
Bhiwani
Dressing of side slopes and construction of retaining wall with M-25 grade reinforced concrete complete in all respect and all other works contingent thereto (Including Three years maintenance and defect liability period free of cost)
2 documents required · 2 mandatory
₹500
Yes
₹86,000
Yes
1 Jun 2026
23 May 2026
1 Jun 2026
23 May 2026
29 May 2026
23 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [14.6]Dressing side slopes and preparation of sub grade for lining in mixed gravel and conglomerate reaches by mechanical/ mannual means [Through rate] | 1,800 | Sqm | 14 | ₹25,200 |
| 2 | [14.9.1]Cement concrete lining 15cm thick or less for irrigation channels, using cement concrete 1:3:6 (M-10) 1. Concrete lining in bed. [Through Rate] | 16.2 | cum | 3,048 | ₹49,377.6 |
| 3 | [14.9.2]Cement concrete lining 15cm thick or less for irrigation channels, using cement concrete 1:3:6 (M-10) 2. concrete lining on side slopes for vertical height up to 3.50 m. [Through Rate] | 90 | cum | 3,056 | ₹2,75,040 |
| 4 | [4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate] | 32.4 | cum | 78 | ₹2,527.2 |
| 5 | [6.25.1]Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. 1. All works up to plinth level [Through Rate] | 371.7 | cum | 4,464 | ₹16,59,268.8 |
| 6 | [6.34.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect above plinth level Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more. [Through Rate] | 33,453 | Kg. | 68 | ₹22,74,804 |
stage.html
html • 0.03 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
BOQ_602836.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .