Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.7 LAccepted-AOC H NO 1 8 3 22 4 SURYA NAGAR TADI COMPLEX CHIKKADAPALLY HYDERABAD 500020 | HYDERABAD | HYDERABAD | TELANGANA | 500020 | L1 | Accepted-AOC L1 | |
| 2 | L2₹30.2 L+₹1.7 L (5.92%)Rejected-Finance | L2 | Rejected-Finance Not being lowest | |
| 3 | L3₹31.6 L+₹3.0 L (10.6%)Rejected-Finance VILL MOKHAWA TEHSIL GUDAMALANI DIST BARMER RAJASTHAN 344031 | GUDAMALANI | BARMER | RAJASTHAN | 344031 | L3 | Rejected-Finance Not being lowest | |
| 4 | L4₹32.5 L+₹4.0 L (13.9%)Rejected-Finance | L4 | Rejected-Finance Not being lowest | |
| 5 | L5₹32.8 L+₹4.2 L (14.8%)Rejected-Finance PLOT NO 14 SHIV COLONY KATI GHATI RAJGARH ROAD ALWER RAJ | ALWAR | ALWAR | RAJASTHAN | L5 | Rejected-Finance Not being lowest |
| Sl No | Description | Qty | Unit | M/s Yash Electrical and Maintenance L5 | Rasam Engg Co. L6 | M/s Shree Construction Company L7 | shivam electricals and engneers L2 | S K TRADER L10 | SHREE BHAGWATI ENTERPRISES L11 | M.D. CONSTRUCTION CO. L4 | NAGEL ENTERPRISES L3 | JASOL MAA ENTERPRISES L9 | AUTOMATION AND SWITCHGEAR PANELS L8 | UNITED AIR COOLING & PROJECTS L1 | Akarsha Enterprises L12 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches not exceeding 1.5m wide and not exceeding 1.5m in depth for foundation, laying of cable/pipe/pole etc or soil for shaft, walls, cesspts, manholes, pier holes etc not exceeding 10 sqm on plain and getting out in Soft/disntegrated rock complete all as specified & directed by Engr-in-Charge. | 730 | Cum | 400 ₹2,92,000 | 370 ₹2,70,100 | 363 ₹2,64,990 | 260 ₹1,89,800 | 200 ₹1,46,000 | 250 ₹1,82,500 | 250 ₹1,82,500 | 300 ₹2,19,000 | 400 ₹2,92,000 | 180 ₹1,31,400 Lowest | 450 ₹3,28,500 | 300 ₹2,19,000 |
| 2.00 | Returning, filling in, including, spreading, levelling, watering and well ramming in layers not exceeding 25 cm thick soft/loose soil complete all as specified & directed by Engr-in-Charge. | 720 | Cum | 50 ₹36,000 | 80 ₹57,600 | 59 ₹42,480 | 40 ₹28,800 | 60 ₹43,200 | 54 ₹38,880 | 30 ₹21,600 | 25 ₹18,000 Lowest | 75 ₹54,000 | 70 ₹50,400 | 120 ₹86,400 | 150 ₹1,08,000 |
| 3.00 | Removing excavated material soil/disintegrated rock to a distance not exceeding 50 m and depositing where directed at a level not exceeding 1.5 m above the starting point complete all as directed by Engr-in-Charge. | 10 | Cum | 10 ₹100 Lowest | 80 ₹800 | 115 ₹1,150 | 40 ₹400 | 60 ₹600 | 54 ₹540 | 30 ₹300 | 25 ₹250 | 75 ₹750 | 60 ₹600 | 120 ₹1,200 | 150 ₹1,500 |
| 4.00 | Supply, laying, testing and commissioning of LT UG, XLPE insulated, heavy duty, 1100V grade of size 95 Sqmm 3½ core electric cable with aluminum conductor, served with an inner sheathing of PVC tape armored with galvanized steel wire or tape and overall PVC sheathed, laid in trenches or passing through pipe, making all connections with and including provision of necessary glands, lugs, bushing etc as required including taking down old existing unserviceable cable complete all as specified and as directed by Engineer-in-Charge.
[Note : - Earthwork excavation, protection pipe shall be measured and paid separately in their respective items] | 400 | RM | 630 ₹2,52,000 | 620 ₹2,48,000 | 645 ₹2,58,000 | 600 ₹2,40,000 Lowest | 670 ₹2,68,000 | 690 ₹2,76,000 | 655 ₹2,62,000 | 600 ₹2,40,000 Lowest | 750 ₹3,00,000 | 800 ₹3,20,000 | 720 ₹2,88,000 | 675 ₹2,70,000 |
| 5.00 | All as per item No 4.00 above but of size 70 sq mm. 3½ core | 400 | RM | 505 ₹2,02,000 | 500 ₹2,00,000 | 525 ₹2,10,000 | 470 ₹1,88,000 | 575 ₹2,30,000 | 590 ₹2,36,000 | 507 ₹2,02,800 | 450 ₹1,80,000 | 600 ₹2,40,000 | 600 ₹2,40,000 | 420 ₹1,68,000 Lowest | 465 ₹1,86,000 |
| 6.00 | All as per item No 4.00 above but of size 50 sq mm. 3½ core | 500 | RM | 375 ₹1,87,500 | 365 ₹1,82,500 | 385 ₹1,92,500 | 365 ₹1,82,500 | 422 ₹2,11,000 | 425 ₹2,12,500 | 352 ₹1,76,000 | 350 ₹1,75,000 Lowest | 450 ₹2,25,000 | 450 ₹2,25,000 | 410 ₹2,05,000 | 350 ₹1,75,000 Lowest |
| 7.00 | All as per item No 4.00 above but of size 35 sq mm. 3½ core | 500 | RM | 290 ₹1,45,000 | 278 ₹1,39,000 | 325 ₹1,62,500 | 255 ₹1,27,500 | 270 ₹1,35,000 | 227 ₹1,13,500 Lowest | 301 ₹1,50,500 | 260 ₹1,30,000 | 335 ₹1,67,500 | 350 ₹1,75,000 | 265 ₹1,32,500 | 290 ₹1,45,000 |
| 8.00 | All as per item No 4.00 above but of size 25 sq mm. 4core | 800 | RM | 260 ₹2,08,000 | 245 ₹1,96,000 | 273 ₹2,18,400 | 225 ₹1,80,000 | 250 ₹2,00,000 | 210 ₹1,68,000 | 232 ₹1,85,600 | 230 ₹1,84,000 | 280 ₹2,24,000 | 300 ₹2,40,000 | 145 ₹1,16,000 Lowest | 250 ₹2,00,000 |
| 9.00 | All as per item No 4.00 above but of size 16 sq mm. 4 core | 600 | RM | 200 ₹1,20,000 | 188 ₹1,12,800 | 215 ₹1,29,000 | 200 ₹1,20,000 | 190 ₹1,14,000 | 190 ₹1,14,000 | 199 ₹1,19,400 | 200 ₹1,20,000 | 200 ₹1,20,000 | 200 ₹1,20,000 | 145 ₹87,000 Lowest | 200 ₹1,20,000 |
| 10.00 | All as per item No 4.00 above but of size 10 sq mm 2 core | 500 | RM | 140 ₹70,000 | 125 ₹62,500 | 155 ₹77,500 | 110 ₹55,000 | 116 ₹58,000 | 116 ₹58,000 | 130 ₹65,000 | 120 ₹60,000 | 150 ₹75,000 | 150 ₹75,000 | 100 ₹50,000 Lowest | 145 ₹72,500 |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
23 Aug 2025, 6:00 pmClosed
GE Army Jaisalmer
GE Army Jaisalmer - 345001
REPAIR AND MAINT OF LT UG CABLE, LT PANELS AND ALLIED WORKS FOR TECH AREA UNDER GE (ARMY) JAISALMER
2025_MES_722636_1
8502/25-26/E8
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
Jaisalmer
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
GE Army Jaisalmer
₹80,000
Yes
27 Nov 2025
25 Jul 2025
25 Aug 2025
25 Jul 2025
23 Aug 2025
8 Aug 2025
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .