S.E.Sitapur/Kheri Circle PWD Sitapur
Office of the S.E.Sitapur/Kheri Circle PWD Sitapur
Reconstruction of Andauli Road to Udaipur (Koraiya) Link Road
2026_CEUCZ_1186443_11
4112/352C-STP-KHERI/2026-27 Dated 31.08.2026
Open Tender
Civil Works - Roads
Fixed-rate
60 days
Sitapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,715
₹5.7 L
Yes
Office of the S.E.Sitapur/Kheri Circle PWD Sitapur
29 Sept 2026
16 Sept 2026
29 Sept 2026
16 Sept 2026
29 Sept 2026
16 Sept 2026
18 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing, Laying, spreading and compacting stone aggregates of 53-22.4 mm size to water bound macadam specification including spreading in uniform thickness, hand packing ,rolling with Smooth wheel roller 80-100 KN in stages to proper grade and camber ,applying and brooming ,Stone screening to fill up the nterstices of coarse aggregate ,watering and compacting to the required density | 65.63 | Cum | 5,450 | ₹3,57,683.5 |
| 2 | Construction of earthen shoulder/Patri with approved material obtained from availble land as permitted and approved by Engineer-in-Charge and as per Technical Specitaion Clause 301.3.4.1, with all lifts and leads, spreading, grading to required slope and compacting to meet requirement of Tables 300.1and 300.2 as per Technical Specification clause 301.5 | 675 | Cum | 88 | ₹59,400 |
| 3 | Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M 30 (Grade), coarse and fine aggregates conforming to IS: 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.28 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501. | 675 | Cum | 8,700 | ₹58,72,500 |
| 4 | Excavation for road work in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m to as per Technical Clause 301 (S.No. 3.6) of MORTH Specification. | 156 | Cum | 30 | ₹4,680 |
| 5 | Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days. | 31.2 | Cum | 8,000 | ₹2,49,600 |
| 6 | Brick masonry work in 1:3 cement mortar in foundation complete excluding pointing and plastering as per drawing and technical speficiations clauses 600, 1202 & 1203 | 71.76 | Cum | 7,550 | ₹5,41,788 |
| 7 | Providing and laying reinforced cement concrete M 20 grade in superstructure as per drawing and technical specifications clauses 800, 1205.4 and 1205.5 | 9.88 | Cum | 8,150 | ₹80,522 |
| 8 | Plastering with cement mortar (1:4) 15 mm thick on brickwork in substructure/ superstracutre as per technical specification clauses 613.4 & 1204 | 312 | Sqm | 180 | ₹56,160 |
| 9 | Routine maintenance charge up to 5 Year for any Defect/damaged found after constrution for all works including restoration of paved surface, soulders culverts, road furniture etc complete as per dirction of E/I . | 1 | Job | 1,80,000 | ₹1,80,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.06 MB
Tendernotice_2.pdf
PDF • 1.28 MB
BOQ_2233168.xls
BOQ • 0.28 MB
AAAAAAA-4507.pdf
PDF • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .