| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC | ₹1.4 Cr | L1 | Accepted-AOC Being L1 |
| 2 | L2₹1.4 Cr+₹1.5 L (1.08%)Rejected-AOC 2 8 RHB COLONY HANUMANGARH HANUMANGARH RAJASTHAN 335512 | HANUMANGARH | RAJASTHAN | 335512 | ₹1.4 Cr+₹1.5 L (1.08%) | L2 | Rejected-AOC Being L2 |
| 3 | L3₹1.4 Cr+₹4.2 L (3.04%)Rejected-AOC | ₹1.4 Cr+₹4.2 L (3.04%) | L3 | Rejected-AOC Being L3 |
Tender Value
Refer Docs
Closing Date
20 Mar 2021, 6:00 pmClosed
CHIEF ENGINEER PROJECT CHETAK
HEAD QUARTERS CHIEF ENGINEER PROJECT CHETAK, BIKANER C/O 56 APO, PIN 931707
2nd call EXECN RESURF WK PT1 GONEWALA RASULPUR KM 3pt3 TO 4pt27 PT2 SAHARAN KASOWAL KM 0 TO 1pt2 PT3 RD DHARMKOT PATOON NANGLI KM 0 TO 3pt31 PT4 RD KASOWAL GHARNI KM 0 TO KM 4 PT5 RD RASULPUR NANGLI BET KM 0 TO 5pt58 IN 141 DMC49 TF CTK IN PUNJAB
2021_BRO_613203_2
CE (P) CTK/30/2020-21
Open Tender
Civil Works - Roads
Item Rate
90 days
Under 141 DMC
AS PER TENDER DOCUMENTS
13 documents required · 13 mandatory
₹0
Exempted
HQ CE PROJECT CHETAK, BIKANER
24 Apr 2021
6 Mar 2021
22 Mar 2021
7 Mar 2021
20 Mar 2021
7 Mar 2021
7 Mar 2021 - 9 Mar 2021
8 Mar 2021
Amount
Part-I Re-Surf ROAD GONEWALA-RASULPUR KM 3.300 TO KM 4.270
Execution of resurfacing works by providing and laying 3.00 cm thick Bituminous Concrete (BC) layer with HMP mix, precoated stone chips having physical requirement / grading / mix composition requirements as per Table 500-11/16/17 respectively mixed with minimum 5.4% binder asphalt VG-30 by weight of total mix and 2% cement/ lime by weight of total aggregate (for filler) all as specified in clause 507 of MORT&H specifications for road and bridge work (Fifth revision) including cleaning of road surface, applying tack coat, laying by paver finisher, rolling and compaction to specified consolidated thickness for resurfacing works and correction works with BC material on ROAD GONEWALA-RASULPUR KM 3.300 TO KM 4.270 under 141 DMC/49 BRTF Project Chetak in the The State of Punjab. All as specified in special conditions and particular specifications and as directed by Engineer-In- Charge/OC Contract
Part-II Re-Surf ROAD SAHARAN-KASOWAL BETWEEN KM 0.00 TO KM 1.200
Execution of resurfacing works by providing and laying 3.00 cm thick Bituminous Concrete (BC) layer with HMP mix, precoated stone chips having physical requirement / grading / mix composition requirements as per Table 500-11/16/17 respectively mixed with minimum 5.4% binder asphalt VG-30 by weight of total mix and 2% cement/ lime by weight of total aggregate (for filler) all as specified in clause 507 of MORT&H specifications for road and bridge work (Fifth revision) including cleaning of road surface, applying tack coat, laying by paver finisher, rolling and compaction to specified consolidated thickness for resurfacing works and correction works with BC material on ROAD SAHARAN-KASOWAL BETWEEN KM 0.00 TO KM 1.200 under 141 DMC/49 BRTF Project Chetak in the The State of Punjab. All as specified in special conditions and particular specifications and as directed by Engineer-In- Charge/OC Contract
Part-III Re-Surf ROAD DHARMKOT-PATOON-NANGLI BETWEEN KM 0.00 TO KM 3.310
Execution of resurfacing works by providing and laying 3.00 cm thick Bituminous Concrete (BC) layer with HMP mix, precoated stone chips having physical requirement / grading / mix composition requirements as per Table 500-11/16/17 respectively mixed with minimum 5.4% binder asphalt VG-30 by weight of total mix and 2% cement/ lime by weight of total aggregate (for filler) all as specified in clause 507 of MORT&H specifications for road and bridge work (Fifth revision) including cleaning of road surface, applying tack coat, laying by paver finisher, rolling and compaction to specified consolidated thickness for resurfacing works and correction works with BC material on ROAD DHARMKOT-PATOON-NANGLI BETWEEN KM 0.00 TO KM 3.310 DMC/49 BRTF Project Chetak in the The State of Punjab. All as specified in special conditions and particular specifications and as directed by Engineer-In- Charge/OC Contract
Part-IV Re-Surf ROAD KASOWAL-GHARNI KE BET BETWEEN KM 0.00 TO KM 4.00
Execution of resurfacing works by providing and laying 3.00 cm thick Bituminous Concrete (BC) layer with HMP mix, precoated stone chips having physical requirement / grading / mix composition requirements as per Table 500-11/16/17 respectively mixed with minimum 5.4% binder asphalt VG-30 by weight of total mix and 2% cement/ lime by weight of total aggregate (for filler) all as specified in clause 507 of MORT&H specifications for road and bridge work (Fifth revision) including cleaning of road surface, applying tack coat, laying by paver finisher, rolling and compaction to specified consolidated thickness for resurfacing works and correction works with BC material onROAD KASOWAL-GHARNI KE BET BETWEEN KM 0.00 TO KM 4.00 under 141 DMC/49 BRTF Project Chetak in the The State of Punjab. All as specified in special conditions and particular specifications and as directed by Engineer-In- Charge/OC Contract
Part-V Re-Surf ROAD RASULPUR-NANGLI BETWEEN KM 0.00 TO KM 5.580
Execution of resurfacing works by providing and laying 3.00 cm thick Bituminous Concrete (BC) layer with HMP mix, precoated stone chips having physical requirement / grading / mix composition requirements as per Table 500-11/16/17 respectively mixed with minimum 5.4% binder asphalt VG-30 by weight of total mix and 2% cement/ lime by weight of total aggregate (for filler) all as specified in clause 507 of MORT&H specifications for road and bridge work (Fifth revision) including cleaning of road surface, applying tack coat, laying by paver finisher, rolling and compaction to specified consolidated thickness for resurfacing works and correction works with BC material on ROAD RASULPUR-NANGLI BETWEEN KM 0.00 TO KM 5.580 under 141 DMC/49 BRTF Project Chetak in the The State of Punjab. All as specified in special conditions and particular specifications and as directed by Engineer-In- Charge/OC Contract
M/s Tayal and Sons
KOHINOOR CONSTRUCTION COMPANY
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .