Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 CrAccepted-AOC | ₹3.9 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹4.2 Cr+₹30.8 L (7.93%)Rejected-AOC ALAMPUR FATEHPUR JANPAD ALIGARH | ALIGARH | UTTAR PRADESH | ₹4.2 Cr+₹30.8 L (7.93%) | L2 | Rejected-AOC L2 |
| 3 | L3₹4.7 Cr+₹78.0 L (20.1%)Rejected-AOC | ₹4.7 Cr+₹78.0 L (20.1%) | L3 | Rejected-AOC L3 |
| 4 | Rejected-Technical KRISHNA COMPLEX JAIN COLLEGE ROAD SAHARANPUR UTTAR PRADESH PIN CODE 247001 | SAHARANPUR | SAHARANPUR | UTTAR PRADESH | 247001 | - | - | Rejected-Technical DISQUALIFIED |
| 5 | Rejected-Technical KHASRA NO 974 NH 24 MEHRAULI GHAZIABAD UTTAR PRADESH | MEHRAULI | GHAZIABAD | UTTAR PRADESH | - | - | Rejected-Technical DISQUALIFIED |
| Sl No | Description | Qty | Unit | BHAMAR SINGH L2 | HARBIR SINGH L1 | MAA GAYATRI ASSOCIATES L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in all type of soil including all lift & lead, T&P etc. back filling of excavation earth into the space between the structure and disposal of surplus earth as directed by Engineer-in-Charge. | 2,606.85 | M3 | 100 ₹2,60,685 | 57.6 ₹1,50,154.56 Lowest | 65 ₹1,69,445.25 |
| 2.00 | Providing and laying of Nylon crates (Size 1.00x1.00x1.00M with mesh size 20x20 cm and Wt.not less than 300gm ) and filling with HDPE woven bag confirming to BIS 11652-2014 of cement bag size (48x75cm) filled with local earth/RBM/silt machine sewing and placing in position with up to 60 M lead including all cost of material , labour and T&P etc. for making base of Spurs/cutter/studs as directed by Engineer-in- Charge. | 2,457.24 | M3 | 600 ₹14,74,344 Lowest | 640.6 ₹15,74,107.94 | 700 ₹17,20,068 |
| 3.00 | Providing G.I. wire crate 8 S.W.G with (Size 3.00 x 1.50 x 0.50 M) with 15cmx15cm mesh double knotted of wire i/c cost of wire , weaving charge, carriage up to site etc. completed as directed by engineer-in-charge. | 1,444 | No. | 2,000 ₹28,88,000 Lowest | 2,000.4 ₹28,88,577.6 | 2,300 ₹33,21,200 |
| 4.00 | Providing G.I. wire crate 8 S.W.G with (Size 3.00 x 1.50 x 1.00 M) with 15cmx15cm mesh double knotted of wire i/c cost of wire , weaving charge, carriage up to site etc. completed as directed by engineer-in-charge. | 3,507 | No. | 2,500 ₹87,67,500 Lowest | 2,669.52 ₹93,62,006.64 | 3,000 ₹1,05,21,000 |
| 5.00 | Providing of boulders 20 kg to 40 kg. in weight including cost of material, loading ,unloading & stacking with Royalty,contractor profit from Jwalapur/Jakhan, or other approved Quarry/authorised stockist from same Distance to the stacking point of site completed as directed by Engineer-in-Charge. | 17,127.45 | M3 | 1,500 ₹2,56,91,175 | 1,228.6 ₹2,10,42,785.07 | 250 ₹42,81,862.5 Lowest |
| 6.00 | Laying &Packing boulder in G.I wire Crates of size(3.00x1.50x1.00M) and (3.00x1.50x0.50M) excluding cost of boulder (Labour Only ) but i/c all labour T&P etc. completed as directed by engineer-in-charge. | 19,030.5 | M3 | 150 ₹28,54,575 Lowest | 201.68 ₹38,38,071.24 | 1,400 ₹2,66,42,700 |
Tender Value
₹4.9 Cr
EMD Value
₹9.7 L
Closing Date
12 Mar 2026, 12:30 pmClosed
SE IWC SAHARANPUR
OFFICE OF THE SE IWC DEHRADUN ROAD SAHARANPUR
Anti-Erosion work for protection between km. 5.400 to km. 7.300 of Naniyari-Toderpur tatbund situated at Left Bank of river yamuna in Tehsil Sadar Distt. Saharanpur.
2026_UPIDC_1121954_11
06/SE/SRE/2025-26
Open Tender
Civil Works
Item Rate
90 days
SAHARANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹9.7 L
OFFICE OF THE SE IWC DEHRADUN ROAD SAHARANPUR
2 Apr 2026
6 Mar 2026
12 Mar 2026
6 Mar 2026
12 Mar 2026
6 Mar 2026
10 Mar 2026
Earth work in excavation in all type of soil including all lift & lead, T&P etc. back filling of excavation earth into the space between the structure and disposal of surplus earth as directed by Engineer-in-Charge.
Providing and laying of Nylon crates (Size 1.00x1.00x1.00M with mesh size 20x20 cm and Wt.not less than 300gm ) and filling with HDPE woven bag confirming to BIS 11652-2014 of cement bag size (48x75cm) filled with local earth/RBM/silt machine sewing and placing in position with up to 60 M lead including all cost of material , labour and T&P etc. for making base of Spurs/cutter/studs as directed by Engineer-in- Charge.
Providing G.I. wire crate 8 S.W.G with (Size 3.00 x 1.50 x 0.50 M) with 15cmx15cm mesh double knotted of wire i/c cost of wire , weaving charge, carriage up to site etc. completed as directed by engineer-in-charge.
Providing G.I. wire crate 8 S.W.G with (Size 3.00 x 1.50 x 1.00 M) with 15cmx15cm mesh double knotted of wire i/c cost of wire , weaving charge, carriage up to site etc. completed as directed by engineer-in-charge.
Providing of boulders 20 kg to 40 kg. in weight including cost of material, loading ,unloading & stacking with Royalty,contractor profit from Jwalapur/Jakhan, or other approved Quarry/authorised stockist from same Distance to the stacking point of site completed as directed by Engineer-in-Charge.
Laying &Packing boulder in G.I wire Crates of size(3.00x1.50x1.00M) and (3.00x1.50x0.50M) excluding cost of boulder (Labour Only ) but i/c all labour T&P etc. completed as directed by engineer-in-charge.
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.43 MB
Booklate-11.pdf
Tender Documents • 2.54 MB
BOQ_2088584.xls
BOQ • 0.23 MB
Corrig.pdf
PDF • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .