| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.8 LAdmitted-Finance | -31.60% | ₹10.8 L | L1 | Admitted-Finance |
| 2 | L2₹11.7 L+₹94,413.48 (8.77%)Admitted-Finance | -25.60% | ₹11.7 L+₹94,413.48 (8.77%) | L2 | Admitted-Finance |
| 3 | L3₹12.8 L+₹2.1 L (19.2%)Admitted-Finance | -18.44% | ₹12.8 L+₹2.1 L (19.2%) | L3 | Admitted-Finance |
| 4 | L4₹14.7 L+₹3.9 L (36.3%)Admitted-Finance | -6.75% | ₹14.7 L+₹3.9 L (36.3%) | L4 | Admitted-Finance |
| 5 | L5₹15.2 L+₹4.4 L (41.3%)Admitted-Finance MAKAN NO 1 82 GURUDWARA ROAD CHARRA ADDA ALIGARH UTTAR PRADESH 202001 | ALIGARH | UTTAR PRADESH | 202001 | -3.35% | ₹15.2 L+₹4.4 L (41.3%) | L5 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
1 Jun 2026, 5:00 pmClosed
DGM(M and C)
Bhubaneswar
Repainting of Fire Water Line, Process Piping, Structural Steel at SERPL PHBPL Balasore
2026_ERBBS_189921_1
9320C26A37
Open Tender
Civil Works
Works
90 days
PHBPL Balasore
Please refer tender
6 documents required · 6 mandatory
Exempted
14 Sept 2026
18 May 2026
2 Jun 2026
18 May 2026
1 Jun 2026
18 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | GST % for the tender
Please select the rate of GST in cell W13. Rate selected shall be applicable for the entire BoQ. | - | - | - | - |
| 10 | Painting of Process and Fire Water Piping | - | - | - | - |
| 20 | Applying priming coat with ready mixed primer of approved brand and manufacturer at all heights over steel surfaces like structures, columns, pipes, vessels, tanks etc. as per manufacturers specifications and directions of the Engineering-in- Charge; all complete including cleaning the surface using emery papers/ Power tool cleaning such as ST-2 or ST-3 as per requirement, consumables, tools, tackles, labour etc but excluding Scaffolding for which payment shall be made in separate item. Note- No. of coats mentioned in the SOR items are only indicative and contractor has to achieve rquired DFT by applying more coats (if required) within the relevant SOR item rates. | - | - | - | - |
| 30 | Solvent free / high solids surface tolerant epoxy coating to achive a minimum DFT of 350-500 microns (2 or more coats of 175-250 μ each ) | 2,460 | SQM | 361.48 | ₹8,89,240.8 |
| 40 | Supplying & Applying various epoxy and other protective intermediate / finish paints of approved brand and manufacturer at all heights over prepared/primed surface for steel structures, pipelines, tanks, equipments, concrete floors etc. as per manufacturers specification & directions of Engineer-in-charge and; all complete including all materials, labours, tools-tackles and consumables etc but excluding Scaffolding for which payment shall be made in separate item. Note- No. of coats mentioned in the SOR items are only indicative and contractor has to achieve rquired DFT by applying more coats (if required) within the relevant SOR item rates | - | - | - | - |
| 50 | Two pack Acrylic Poly-urethane (PU) to achive a minimum DFT of 40-50 microns (one or more coat of 40-50 μ). | 2,460 | SQM | 120.8 | ₹2,97,168 |
| 60 | Painting of Structures | - | - | - | - |
| 70 | Applying priming coat with ready mixed primer of approved brand and manufacturer at all heights over steel surfaces like structures, columns, pipes, vessels, tanks etc. as per manufacturers specifications and directions of the Engineering-in- Charge; all complete including cleaning the surface using emery papers/ Power tool cleaning such as ST-2 or ST-3 as per requirement, consumables, tools, tackles, labour etc but excluding Scaffolding for which payment shall be made in separate item. Note- No. of coats mentioned in the SOR items are only indicative and contractor has to achieve rquired DFT by applying more coats (if required) within the relevant SOR item rates | - | - | - | - |
| 80 | HB Zinc phosphate coating primer to achive a minimum DFT of 30-35 microns (1 or more coat of 30-35 μ ) | 500 | SQM | 67.63 | ₹33,815 |
| 90 | Supplying & Applying various epoxy and other protective intermediate / finish paints of approved brand and manufacturer at all heights over prepared/primed surface for steel structures, pipelines, tanks, equipments, concrete floors etc. as per manufacturers specification & directions of Engineer-in-charge and; all complete including all materials, labours, tools-tackles and consumables etc but excluding Scaffolding for which payment shall be made in separate item. Note- No. of coats mentioned in the SOR items are only indicative and contractor has to achieve rquired DFT by applying more coats (if required) within the relevant SOR item rates | - | - | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
Finaltender.pdf
Tender Documents • 11.75 MB
10 Technical Annexure.pdf
Additional Documents • 0.34 MB
11 Annexure_Commercial.xls
Additional Documents • 0.47 MB
BOQ_200188.xls
BOQ • 0.27 MB
Tender-Acceptance-Format.pdf
Additional Documents • 0.08 MB
FAQs-IOCL-Online-EMD.pdf
Additional Documents • 0.55 MB
Bidders_help_Document_for_Preferencial_Bidding_20230207_v1.pdf
Additional Documents • 0.82 MB
Special_Instructions_to_the_Bidders_Version_5_dated_30_June_2025.pdf
Additional Documents • 2.80 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .