Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹33.0 L Construction of separate Underground water sump for main building etc, at Rashtrapati Nilayam Bolarum Hyderabad during 2023-24 | Construction of separate Underground water sump for main building etc, at Rashtrapati Nilayam Bolarum Hyderabad during 2023-24 | L1 | - | |
| 2 | L2₹41.7 L+₹8.7 L (26.4%) Construction of separate Underground water sump for main building etc, at Rashtrapati Nilayam Bolarum Hyderabad during 2023-24 | Construction of separate Underground water sump for main building etc, at Rashtrapati Nilayam Bolarum Hyderabad during 2023-24 | L2 | - | |
| 3 | L3₹44.6 L+₹11.6 L (35.1%) Construction of separate Underground water sump for main building etc, at Rashtrapati Nilayam Bolarum Hyderabad during 2023-24 | Construction of separate Underground water sump for main building etc, at Rashtrapati Nilayam Bolarum Hyderabad during 2023-24 | L3 | - | |
| 4 | L4₹46.4 L+₹13.4 L (40.6%)Financial bid opened Construction of separate Underground water sump for main building etc, at Rashtrapati Nilayam Bolarum Hyderabad during 2023-24 | Construction of separate Underground water sump for main building etc, at Rashtrapati Nilayam Bolarum Hyderabad during 2023-24 | L4 | Financial bid opened | |
| 5 | L5₹49.5 L+₹16.5 L (49.9%) Construction of separate Underground water sump for main building etc, at Rashtrapati Nilayam Bolarum Hyderabad during 2023-24 | Construction of separate Underground water sump for main building etc, at Rashtrapati Nilayam Bolarum Hyderabad during 2023-24 | L5 | - |
| Sl No | Description | Qty | Unit | Chetna Electrical L3 | MALLI KHARJUN REDDY KOLAN L5 | M/s Aggarwal Auto & Steel Mfg Co L4 | T R Constructions L2 | UTKAL PLUMBING SYSTEM L1 |
|---|---|---|---|---|---|---|---|---|
| 1 | Civil work | - | - | -16.29 ₹44,58,567.88 | -7.11 ₹49,47,513.68 | -12.9 ₹46,39,126.3 | -21.7 ₹41,70,420.08 | -38.05 ₹32,99,585.24 Lowest |
Tender Value
₹53.3 L
EMD Value
₹1.1 L
Closing Date
19 Jun 2023, 4:31 pmClosed
EE(PE)
Vaibhav Jain
President Estate
Construction of separate Underground water sump for main building etc, at Rashtrapati Nilayam Bolarum Hyderabad during 2023-24
44482
NIT34/EE/PE/2023-24
OPEN
Maintenance
NCB
3 months
Hyderabad, Telangana
10 documents required · 10 mandatory
₹1.1 L
Not Applicable
19 Jun 2023
12 Jun 2023
19 Jun 2023
19 Jun 2023
19 Jun 2023
stage.html
html • 0.08 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
NIT+34.pdf
document • 8.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .