Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹23.0 L+₹61,600 (2.75%)Accepted-AOC NAKHANDAPAR BARPETA ASSAM | BARPETA | BARPETA | ASSAM | 781301 | ₹23.0 L+₹61,600 (2.75%) | L2 | Accepted-AOC ULB Committee decide |
| 2 | L1₹22.4 LRejected-Finance | ₹22.4 L | L1 | Rejected-Finance The rate not be accepted since the quality of work |
| 3 | L2₹23.0 L+₹61,600 (2.75%)Rejected-Finance | ₹23.0 L+₹61,600 (2.75%) | L2 | Rejected-Finance ULB Committee Decide |
| Sl No | Description | Qty | Unit | BISWADEV DAS L1 | MANABENDRA DAS L2 | M/s Shivam Consortium L2 |
|---|---|---|---|---|---|---|
| 1.01 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level/above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more | 8,499.8 | kg | 100 ₹8,49,980 | 98 ₹8,32,980.4 Lowest | 100 ₹8,49,980 |
| 1.02 | Centering and shuttering including strutting, propping etc. and removal of form for: Lintels, beams, plinth beams, girders, bressumers and cantilevers | 509.04 | sqm | 400 ₹2,03,616 | 350 ₹1,78,164 Lowest | 400 ₹2,03,616 |
| 1.03 | Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platform | 270 | sqm | 500 ₹1,35,000 | 380 ₹1,02,600 Lowest | 500 ₹1,35,000 |
| 1.04 | Centering and shuttering including strutting, propping etc. and removal of form for: Columns, Pillars, Piers, Abutments, Posts and Struts | 180.18 | sqm | 400 ₹72,072 Lowest | 400 ₹72,072 Lowest | 400 ₹72,072 Lowest |
| 1.05 | Centering and shuttering including strutting, propping etc. and removal of form for: Stairs, (excluding landings) except spiral-staircases | 20.37 | sqm | 400 ₹8,148 Lowest | 500 ₹10,185 | 400 ₹8,148 Lowest |
| 1.06 | Reinforced cement concrete work in walls (any thickness), including
attached pilasters, buttresses, plinth and string courses, fillets, columns,
pillars, piers, abutments, posts and struts etc. above plinth level up to
floor five level, excluding cost of centering, shuttering, finishing and
reinforcement :
5.2.2 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural
sources : 3 graded stone aggregate 20 mm nominal size
derived from natural sources) | 10.79 | cum | 11,500 ₹1,24,085 Lowest | 12,000 ₹1,29,480 | 11,500 ₹1,24,085 Lowest |
| 1.07 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 61.6 | cum | 10,000 ₹6,16,000 Lowest | 12,000 ₹7,39,200 | 11,000 ₹6,77,600 |
| 1.08 | Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level. Cement mortar 1:4 (1 cement :4 coarse sand) | 85.8 | sqm | 800 ₹68,640 Lowest | 800 ₹68,640 Lowest | 800 ₹68,640 Lowest |
| 1.09 | 15 mm cement plaster on the rough side of single or half brick wall of
mix :
13.2.1 1:4 (1 cement: 4 fine sand) | 171.6 | sqm | 400 ₹68,640 | 300 ₹51,480 Lowest | 400 ₹68,640 |
| 1.10 | Providing wood work in frames of false ceiling, partitions etc. sawn and
fixed in position with necessary stainless steel screws etc.
9.3.2 Kiln seasoned and chemically treated hollock wood | 0.23 | cum | 1,20,000 ₹27,360 | 22,735.09 ₹5,183.6 Lowest | 1,20,000 ₹27,360 |
Tender Value
₹25.6 L
EMD Value
₹51,185
Closing Date
2 Mar 2026, 3:00 pmClosed
Chairman Barpeta Municipal Board Barpeta
BMB
Construction of RCC Markrt Building 1st Floor at Gokul Pathak Bus Terminus under Untied Grant of the award of 15th FC 2025-26 1st Instl
2026_UDD_51091_1
NIT NO 26 OF 2025-26
Open Tender
Civil Works - Building
Item Wise
BMB
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
Yes
₹51,185
Yes
13 Mar 2026
12 Feb 2026
2 Mar 2026
12 Feb 2026
2 Mar 2026
12 Feb 2026
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level/above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more
Centering and shuttering including strutting, propping etc. and removal of form for: Lintels, beams, plinth beams, girders, bressumers and cantilevers
Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platform
Centering and shuttering including strutting, propping etc. and removal of form for: Columns, Pillars, Piers, Abutments, Posts and Struts
Centering and shuttering including strutting, propping etc. and removal of form for: Stairs, (excluding landings) except spiral-staircases
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 5.2.2 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level. Cement mortar 1:4 (1 cement :4 coarse sand)
15 mm cement plaster on the rough side of single or half brick wall of mix : 13.2.1 1:4 (1 cement: 4 fine sand)
Providing wood work in frames of false ceiling, partitions etc. sawn and fixed in position with necessary stainless steel screws etc. 9.3.2 Kiln seasoned and chemically treated hollock wood
Providing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.0.63 mm thick with zinc coating not less than 275 gm/ m²
Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes.110 mm diameter
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.43 MB
SBD.pdf
Tender Documents • 1.07 MB
BOQ_81279.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .