| 1 | L1₹4.0 CrAccepted-Finance ARUVANKATTUR KOOLTHAMPALAYAM POST KONGANAPURAM SANKARI TALUK SALEM 637102 | SALEM | SALEM | TAMIL NADU | 637102 | ₹4.0 Cr | L1 | Accepted-Finance Accepted |
| 2 | L2₹4.1 Cr+₹3.0 L (0.74%)Rejected-Finance | ₹4.1 Cr+₹3.0 L (0.74%) | L2 | Rejected-Finance Rejected |
| 3 | L3₹4.2 Cr+₹22.4 L (5.57%)Rejected-Finance 53 19 BRINDABON MULLICK LANE KADAMTALA HOWRAH WEST BENGAL 711101 | HOWRAH | WEST BENGAL | 711101 | ₹4.2 Cr+₹22.4 L (5.57%) | L3 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | K.P.RANGARAJU L1 | SRE MCM & CO L2 | PHOENIX & CO L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation by manual means for Isolated, Combined and Other type foundations in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | 20,250 | Cum | 124 ₹25,11,000 Lowest | 125 ₹25,31,250 | 131 ₹26,52,750 |
| 2.00 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15cm thick well rammed with surface vibrator, watered and consolidated etc., complete complying with standard specification and as directed by the departmental officers. | 2,710 | Cum | 169 ₹4,57,990 Lowest | 171 ₹4,63,410 | 179 ₹4,85,090 |
| 3.00 | Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 223 | Cum | 2,217 ₹4,94,391 Lowest | 2,233 ₹4,97,959 | 2,343 ₹5,22,489 |
| 4.00 | c) Treatment of soil along the external perimeter of the building - After the building is complete, the earth along the external perimeter of the building shall be rodded at intervals of 150 mm and to a depth of 300 mm. The rods should be moved backward and forward, parallel to the wall to break up the earth and emulsion poured along the wall at the rate of 7.5 liters per square meter of vertical surfaces.
d) Top surface of the plinth filling including damp proof courses at the rate of 5 liter/sqm of internal plinth area (if required)( As per IS:6313 Part II-2013). For any area without a basement, treatment shall be done as per IS:6313 Part-II-2013.
e) Treatment of soil surrounding pipes, wastes, and conduits - When pipes, wastes, and conduits enter the soil inside the area of the foundation, soil surrounding the point of entry shall be loosened around each of such pipe, waste or conduits for a distance of 150mm and up to a depth of 75 mm before the treatment is commenced. When they enter the soil external to the foundation, they shall be similarly treatment for a distance of 300 mm, unless they stand clear of the walls of the building are about 75 mm.
f) 1 liter / linear meter along the junction of wall and floor at all stages
g) 2 liter per linear meter for expansion joints in touch with soil/sand.
The contractor shall submit a methodology statement to the engineer in charge before starting the work.
The footprint area of the Ground Floor of the building shall be considered for payment in sqm. | 64 | Sqm | 122 ₹7,808 Lowest | 122 ₹7,808 Lowest | 128 ₹8,192 |
| 5.00 | Plain Cement Concrete 1:2:4 (one cement, two crushed stone sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.- Mixing by mechanical means | 228 | Cum | 7,739 ₹17,64,492 Lowest | 7,797 ₹17,77,716 | 8,179 ₹18,64,812 |
| 6.00 | Providing and laying in position, Standardised Concrete Mix M-30 Grade using In-situ Concrete batching plant/ Ready Mix Concrete (RMC) adopting weigh batch method in accordance with IS:456-2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 400 kg/m3 and maximum water cement ratio of 0.45, including admixture (plasticiser / superplasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5.0 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m') 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including Conveyance of concrete from batching plant to Work site, Electricity charges and other works & labour cost involved for concrete production, laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. (No separate payment will be made by the Department for the excess usage of materials). | 90 | Cum | 8,602 ₹7,74,180 Lowest | 8,665 ₹7,79,850 | 9,090 ₹8,18,100 |
| 7.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500, Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers.(Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire) | 78.91 | Qtl | 9,774 ₹7,71,266.34 Lowest | 9,847 ₹7,77,026.77 | 10,329 ₹8,15,061.39 |
| 8.00 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, Sill slabs etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid with silver oak joists of size 10cm x 5cm & 7.5cm x 5cm as support runner, vertical stiffener, side support and Top Horizontal stiffener spaced at about 60cm to 90cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid). | 208 | Sqm | 766 ₹1,59,328 Lowest | 771 ₹1,60,368 | 809 ₹1,68,272 |
| 9.00 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as vertical slab, side slabs of boxing, vertical drops, facia, vertical wall, etc. using mild steel sheets of size 1200cm x 60cm and 10 BG stiffened with welded mild steel angles of size 40mm x 40mm x 5 mm for boarding, laid with silver oak joists of size 10cm x 5cm & 7.5cm x 5cm as support runner, Top Horizontal stiffener spaced at about 60cm to 90cm centre to centre or at suitable intervals. MS Channel Section (ISMC 100) shall be provided as a vertical support @1.20m C/C and with Lateral support of Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) & steel pipes of 20mm dia @ required level/spacing etc. complete complying with standard specifcation and as directed by the departmental officers. (Payment for centering shall be given after the concrete is laid) | 70 | Sqm | 629 ₹44,030 Lowest | 634 ₹44,380 | 665 ₹46,550 |
| 10.00 | Supplying and erecting centering for plane surfaces such as RCC Floor/Roof Beam, Lintels, Cantilever Beams, Bed Blocks etc.. with necessary supports and strutting upto 3.60m height in all floors with all cross bracings using MS Sheets made of 10 gauge thick welded with MS angle of Size 25mm x 25mm x 3mm for boarding laid over Steel adjustable Span of Size 2m x 2m(expandable upto 3.60m) and Silver Oak Joists of Size 10 x 5 cm spaced at 50cm to 60cm c/c and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick) Spaced at not more than 50 to 60cm c/c, etc complete complying with standard specifications. Steel adjustable span and Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid). | 61 | Sqm | 1,193 ₹72,773 Lowest | 1,202 ₹73,322 | 1,261 ₹76,921 |
Tender Value
₹4.0 Cr
EMD Value
₹4 L
Closing Date
20 Feb 2026, 4:00 pmClosed
Managing Director, TANHODA, Chennai
Managing Director, Tamil Nadu Horticulture Development Agency, 3rd floor, Agriculture Building Complex, Chepauk, Chennai-5
Providing Park arrangements for Establishment of ECO Park at Guindy, Chennai
2026_TANHO_657447_1
FPM2/6767/2024
Open Tender
Civil Works - Others
Item Rate
270 days
Eco Park, Guindy
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹4 L
23 Feb 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation by manual means for Isolated, Combined and Other type foundations in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | 20,250 | Cum | - | - |
| 2 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15cm thick well rammed with surface vibrator, watered and consolidated etc., complete complying with standard specification and as directed by the departmental officers. | 2,710 | Cum | - | - |
| 3 | Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 223 | Cum | - | - |
| 4 | c) Treatment of soil along the external perimeter of the building - After the building is complete, the earth along the external perimeter of the building shall be rodded at intervals of 150 mm and to a depth of 300 mm. The rods should be moved backward and forward, parallel to the wall to break up the earth and emulsion poured along the wall at the rate of 7.5 liters per square meter of vertical surfaces.
d) Top surface of the plinth filling including damp proof courses at the rate of 5 liter/sqm of internal plinth area (if required)( As per IS:6313 Part II-2013). For any area without a basement, treatment shall be done as per IS:6313 Part-II-2013.
e) Treatment of soil surrounding pipes, wastes, and conduits - When pipes, wastes, and conduits enter the soil inside the area of the foundation, soil surrounding the point of entry shall be loosened around each of such pipe, waste or conduits for a distance of 150mm and up to a depth of 75 mm before the treatment is commenced. When they enter the soil external to the foundation, they shall be similarly treatment for a distance of 300 mm, unless they stand clear of the walls of the building are about 75 mm.
f) 1 liter / linear meter along the junction of wall and floor at all stages
g) 2 liter per linear meter for expansion joints in touch with soil/sand.
The contractor shall submit a methodology statement to the engineer in charge before starting the work.
The footprint area of the Ground Floor of the building shall be considered for payment in sqm. | 64 | Sqm | - | - |
| 5 | Plain Cement Concrete 1:2:4 (one cement, two crushed stone sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.- Mixing by mechanical means | 228 | Cum | - | - |
| 6 | Providing and laying in position, Standardised Concrete Mix M-30 Grade using In-situ Concrete batching plant/ Ready Mix Concrete (RMC) adopting weigh batch method in accordance with IS:456-2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 400 kg/m3 and maximum water cement ratio of 0.45, including admixture (plasticiser / superplasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5.0 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m') 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including Conveyance of concrete from batching plant to Work site, Electricity charges and other works & labour cost involved for concrete production, laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. (No separate payment will be made by the Department for the excess usage of materials). | 90 | Cum | - | - |
| 7 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500, Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers.(Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire) | 78.91 | Qtl | - | - |
| 8 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, Sill slabs etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid with silver oak joists of size 10cm x 5cm & 7.5cm x 5cm as support runner, vertical stiffener, side support and Top Horizontal stiffener spaced at about 60cm to 90cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid). | 208 | Sqm | - | - |
| 9 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as vertical slab, side slabs of boxing, vertical drops, facia, vertical wall, etc. using mild steel sheets of size 1200cm x 60cm and 10 BG stiffened with welded mild steel angles of size 40mm x 40mm x 5 mm for boarding, laid with silver oak joists of size 10cm x 5cm & 7.5cm x 5cm as support runner, Top Horizontal stiffener spaced at about 60cm to 90cm centre to centre or at suitable intervals. MS Channel Section (ISMC 100) shall be provided as a vertical support @1.20m C/C and with Lateral support of Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) & steel pipes of 20mm dia @ required level/spacing etc. complete complying with standard specifcation and as directed by the departmental officers. (Payment for centering shall be given after the concrete is laid) | 70 | Sqm | - | - |
| 10 | Supplying and erecting centering for plane surfaces such as RCC Floor/Roof Beam, Lintels, Cantilever Beams, Bed Blocks etc.. with necessary supports and strutting upto 3.60m height in all floors with all cross bracings using MS Sheets made of 10 gauge thick welded with MS angle of Size 25mm x 25mm x 3mm for boarding laid over Steel adjustable Span of Size 2m x 2m(expandable upto 3.60m) and Silver Oak Joists of Size 10 x 5 cm spaced at 50cm to 60cm c/c and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick) Spaced at not more than 50 to 60cm c/c, etc complete complying with standard specifications. Steel adjustable span and Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid). | 61 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
TechnicalbidParkarrangementsEcoparkguindy.pdf
Tender Documents • 0.68 MB
BOQ_788514.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .