| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-AOC | ₹4.8 L | L1 | Accepted-AOC Accept |
| 2 | L2₹4.8 LRejected-AOC | ₹4.8 L | L2 | Rejected-AOC Accept |
| Sl No | Description | Qty | Unit | A.THIYAGARAJAN L2 | JAYABHARATH L1 |
|---|---|---|---|---|---|
| 1.00VELLORE DISTRICT CONSTRUCTION OF MINI SANITARY COMPLEX FOR THE USE OF STUDENTS (GENTS) OF THE NEWLY CONSTRUCTED GOVERNMENT ARTS AND SCIENCE COLLEGE IN K.V.KUPPAM PANCHAYAT OF K V KUPPAM BLOCK SBM(G) PANCHAYAT UNION GF 2025-26 PACKAGE NO 01 | |||||
| 2.00 | Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, Sectioning the street to lay concrete pavement per SS 20 A. | 14.52 | cum | 267.02 ₹3,877.13 | 263.65 ₹3,828.20 |
| 3.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation | 3.74 | cum | 5,768.01 ₹21,572.36 | 5,695.08 ₹21,299.60 |
| 4.00 | Supplying and filling of conveyed earth with a lead of 1Km for basement filling including cost and coveyance of all materials to work site and all labour charges etc. | 3.06 | cum | 122.48 ₹374.79 | 120.93 ₹370.05 |
| 5.00 | Reinforeced Cement concrete 1:11/2:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs | 8.27 | cum | 9,703.44 ₹80,247.45 | 9,580.75 ₹79,232.80 |
| 6.00 | Supplying & Erecting centering for sides & soffits including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle etc Complete (Below GL) | 16.14 | sqm | 554.23 ₹8,945.27 | 547.23 ₹8,832.29 |
| 7.00 | Above GL | 35.51 | sqm | 1,108.47 ₹39,361.77 | 1,094.45 ₹38,863.92 |
| 8.00 | Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications for etc Complete | 8.8 | cum | 6,250.12 ₹55,001.06 | 6,171.09 ₹54,305.59 |
| 9.00 | Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification for etc Complete | 0.67 | mt | 93,003.26 ₹62,312.18 | 91,827.28 ₹61,524.28 |
| 10.00 | Plastering with CM 1:3, 10mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. | 15.16 | sqm | 333.77 ₹5,059.95 | 329.55 ₹4,995.98 |
Tender Value
Refer Docs
EMD Value
₹9,660
Closing Date
23 Oct 2025, 3:00 pmClosed
TH BLOCK DEVELOPMENT OFFICER
TH BLOCK DEVELOPMENT OFFICER, KVKUPPAM
VELLORE DISTRICT CONSTRUCTION OF MINI SANITARY COMPLEX FOR THE USE OF STUDENTS (GENTS) OF THE NEWLY CONSTRUCTED GOVERNMENT ARTS AND SCIENCE COLLEGE IN K.V.KUPPAM PANCHAYAT OF K V KUPPAM BLOCK SBM(G) PANCHAYAT UNION GF 2025-26 PACKAGE NO 01
2025_RDTN_614363_1
B5/1218/2025 KVKM OCT 24-25
Open Tender
Civil Works
180 days
TH BLOCK DEVELOPMENT OFFICE, KVKUPPAM
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹9,660
8 Jun 2026
15 Oct 2025
23 Oct 2025
15 Oct 2025
23 Oct 2025
15 Oct 2025
Amount
VELLORE DISTRICT CONSTRUCTION OF MINI SANITARY COMPLEX FOR THE USE OF STUDENTS (GENTS) OF THE NEWLY CONSTRUCTED GOVERNMENT ARTS AND SCIENCE COLLEGE IN K.V.KUPPAM PANCHAYAT OF K V KUPPAM BLOCK SBM(G) PANCHAYAT UNION GF 2025-26 PACKAGE NO 01
Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, Sectioning the street to lay concrete pavement per SS 20 A.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation
Supplying and filling of conveyed earth with a lead of 1Km for basement filling including cost and coveyance of all materials to work site and all labour charges etc.
Reinforeced Cement concrete 1:11/2:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs
Supplying & Erecting centering for sides & soffits including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle etc Complete (Below GL)
Above GL
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications for etc Complete
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification for etc Complete
Plastering with CM 1:3, 10mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Plastering with CM 1:5, 12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Supply and fixing of Steel door & Window including cost and conveyance charges etc.,
Door 1.00x2.10m
Door 1.00x1.80m
Flooring with following ceramic tiles of size 305 x 305 x 6 mm laid over 20 mm thick cement mortar 1:3 (One Cement and Three M.Sand) base mortar over the existing slab / floor including cutting the tiles to the required size with special cutter wherever necessary, laying in position and pointing with white cement mixed with colouring pigment at the rate of 0.3 Kg. / sq.m. etc., complete complying with standard specification. (The make and brand of the tiles should be got approved by Executive Engineer before use on works)
Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour including all charges etc.
Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two crushed stone M.Sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at the rate of 0.40 Kg. / sq.m. neatly in all floors, curing, etc., complying with standard specification and as directed by the departmental officers.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Exterier Emulsion painting two coats with approved emulsion paint including cost and conveyance of all materials to and all labour charges etc.complete
Painting two coats over new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with best approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete
Supply and fixing IWC
Supply and fixing EWC
Cost and supply of 63mm PVC pipe
Cost and supply of 25mm PVC pipe
Cost and supply of 110mm PVC pipe
Cost and supply of 110mm PVC bend
Provision Labour charges for Sanitary arrangament s
Provision Labour charges for Water supply arrangements
Provision for supply and fixing RCC Jolly
Provision for Name Baord Charges
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
A.THIYAGARAJAN (BID ID -1493699)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_734036.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.54 MB
Tendernotice_2.pdf
PDF • 0.37 MB
BOQ_734036.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid