Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹78,517.20Accepted-AOC MAJAN KALA WAIDHAN SINGRAULI 486886 MADHYA PRADESH INDIA | SINGRAULI | MADHYA PRADESH | 486886 | L-1 | Accepted-AOC Fabrication of 03 Nos. Oil Drain Trolley at NWS and OWS Dozer Section and 02 Nos. Working stand at OWS Dozer section Nigahi Project |
Tender Value
₹1.0 L
EMD Value
₹1,300
Closing Date
3 May 2024, 11:00 amClosed
GENERAL MANAGER (EXCV), NIGAHI PROJECT
OFFICE OF GENERAL MANAGER (EXCV)NCL, NIGAHI PROJECT, PO-NIGAHI, DISTT-SINGRAULI (MP) - 486884
Fabrication of 03 Nos. Oil Drain Trolley at NWS and OWS Dozer Section and 02 Nos. Working stand at OWS Dozer section Nigahi Project
2024_NCL_306696_1
NGH/EXCV/TENDERS/24-25/005
Open Tender
Excavation Department Work
Item Rate
15 days
NIGAHI PROJECT
AS PER NIT
4 documents required · 4 mandatory
₹1,300
1 Oct 2024
17 Apr 2024
4 May 2024
17 Apr 2024
3 May 2024
18 Apr 2024
17 Apr 2024 - 22 Apr 2024
Amount
Note : MS plate , MS Angle, Pipe, Welding electrode and Industrial gases as per requirement will be provided by NCL.
Scope of work : Fabrication of Oil Drain Trolley (1) Dimension of oil drain trolley body size 3.5ft x 2.5ft x 25inch (2) Wheel size - 7inch (3) Wheel bracket - 6inch and (4) Handle - 3ft.
Cost/ charges for wheel making including material cost labour charges, contractor profit etc. (labour consisting of Skilled Welder and Semi-skilled Helper manpower) for 04 Nos. wheel each trolley ( Total 03 Nos. oil drain trolley for fabrication job)
Cost/ charges for fabrication of oil drain trolley as per scope of work including labour charges, contractor profit etc. (labour consisting of Skilled Fitter , Skilled Welder and Semi-skilled Helper manpower) for Total 03 Nos. oil drain trolley
Hire charges for welding machine with all accessories for the all above mentioned job for Total 03 Nos. oil drain trolley
Charges for painting of fabricated oil drain trolley ( one coat primer and two coat paint with material) 60 sqft. Each trolley ( Total 03 Nos. oil drain trolley) including material cost labour charges etc.
Fabrication of working stand : Scope of work (1) dimension of working stand size 5ftx3ft x5ft and (2) Wheel size - 7inch
Cost/ charges for wheel making including material cost, labour charges, contractor profit etc. (labour consisting of Skilled Welder and Semi-skilled Helper manpower) for 04 Nos. wheel each working stand ( Total 02 Nos. working stand)
Cost/ charges for fabrication of working stand and wheel bracket including labour charges, contractor profit etc. (labour consisting of Skilled Fitter , Skilled Welder and Semi-skilled Helper manpower) for Total 02 Nos. working stand
Cost/ charges for fabrication of railing and ladder for working stand including labour charges, contractor profit etc. (labour consisting of Skilled Fitter , Skilled Welder and Semi-skilled Helper manpower) for Total 02 Nos. working stand
Charges for painting of fabricated working stand ( one coat primer and two coat paint with material) 40 sqft. Each stand ( Total 02 Nos. working stand) including material cost , labour charges etc.
Hire charges for welding machine with all accessories for the all above mentioned job for Total 02 Nos. working stand.
Hire charges for grinding machine with all accessories for the all above mentioned job for Total 02 Nos. working stand.
Total impact of GST for the purpose of CTC
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .