Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹55.3 LAdmitted-Finance | ₹55.3 L | L1 | Admitted-Finance |
| 2 | L2₹58.3 LAdmitted-Finance 107 1A TOLLYGAUNG ROAD KOLKATA 700026 WB | KOLKATA | WEST BENGAL | 700026 | ₹58.3 L | L2 | Admitted-Finance |
| 3 | Rejected-Technical GROUND FLOOR PLOT NO 34 245 BETHI COLONY KHATODRA NR UDHNA DARWAJA SURAT SURAT GUJARAT 395002 SURAT GUJARAT 395002 UDYAM GJ 22 0138053 | SURAT | GUJARAT | 395002 | - | - | Rejected-Technical As per Technical Evaluation Report |
| Sl No | Description | Qty | Unit | M/S ALPHA CONSTRUCTION L1 | ARJUN DAS VALECHA L2 |
|---|---|---|---|---|---|
| 1.00NOTES :The bidders/contractors are advised to read tender document & all corrigendum/ amendments and General conditions of contracts before entry/quoting the rates. | |||||
| 2.00 | Material & labour of repair to pot holes of exc 30 cm depth, not exc 1.00 Sqm each incl sweeping free from dust and mud or water, scoring sunken surfaces in roads etc and cutting around edges to at least 25mm in depth and making good by applying tack coat of bitumineous primer VG-10 at 5 kg/ 10 Sqm putting in premixed bituminous macadam, well rammed and sealed with binder 9.8 kg per 10 sqm, binded with 0.09 cum of stone chippings, 6.3mm size and again well rammed complete all as spd & directed. | 3 | 10 Sqm | 2,000 ₹6,000 | 2,750 ₹8,250 |
| 3.00 | Material & labour of repair to pot holes of any depth not exc 1.00 Sqm each incl sweeping free from dust and mud or water, scoring sunken surfaces in roads, paths etc and cutting around edges to at least 25mm in depth and making good by filling in screened & graded road metal, watering and well ramming (including supply of road metal) complete all as spd & directed. . | 10 | 10 Sqm | 1,200 ₹12,000 | 900 ₹9,000 |
| 4.00 | Material & labour for preparation of WBM surfaces by brushing with wire brush for removing caked mud etc sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc complete all as specified and directed | 10 | 10 Sqm | 320 ₹3,200 | 120 ₹1,200 |
| 5.00 | Material & labour for applying evenly a priming / tack coat with bituminous primer by using paving bitumen VG-10 grade @10 Kg per 10 Sqm of road surface complete all as specified and directed | 10 | 10 Sqm | 500 ₹5,000 | 895 ₹8,950 |
| 6.00 | Material & labour for preparation of existing black top surfaces / BM surface by brushing with wire brush for removing caked mud etc sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc complete all as specified & directed. | 30 | 10 Sqm | 150 ₹4,500 | 40 ₹1,200 |
| 7.00 | Material & labour for applying evenly a priming / tack coat with bituminous primer by using paving bitumen VG-10 grade @5Kg per 10 Sqm of road surface complete all as specified and directed | 70 | 10 Sqm | 220 ₹15,400 | 395 ₹27,650 |
| 8.00 | Material & labour for premix bituminous macadam
40 mm (mix) consolidated thickness with 3.3% (minimum) paving bitumen(VG-30) as a binder by weight of total mix and grading of aggregates & design criteria as specified in SSR Part -I clause no 20.B.2.5.4(b) & 20.B.2.5.2, spread, rolled and consolidated to gradient and camber required and all as specified in para 20.B.3 & sub para 20.B.3 of MES Schedule Part I and as directed. | 20 | Cum | 8,400 ₹1,68,000 | 11,000 ₹2,20,000 |
| 9.00 | Material & Labour for Bituminous premix semi-dense asphaltic concrete 40mm consolidated thickness with 4.5% (minimum) paving bitumen(VG-30) as a binder by weight of total mix and grading of aggregates & design criteria as specified in SSR Part -I clause no 20.B.2.5.4(d) & 20.B.2.11 mixing & laying, rolled, consolidated to gradient and camber required as specified in para 20.B.4 & sub para 20.B.4 of MES Schedule Part I complete all as specified and directed.
Notes for Item No 8 & 9
1. No price adjustment shall be applicable if the approved quantity of binder as per design mixed is more than specified quantity.
2. The Contractor is advised to assess the realistic quantity of binder for the Design Mix specified above before quoting. If considered necessary, they may get the Design Mix done on their own before quoting the Tender. However, the Design Mix done prior to quoting of Tender shall not be considered for incorporation in the Work after conclusion of Contract and shall have to be done as specified above.complete all as spd and directed.
3. Contractor shall submit the authenticated weight batch receipt as per load material in site duly marked vehicle number | 40 | 10 Sqm | 3,700 ₹1,48,000 | 6,500 ₹2,60,000 |
| 10.00 | Material & labour for preparation of existing black top surfaces / BM surface by applying a tack coat over existing bituminous surface @ 0.5 Kg/Sqm of 20/30 bitumen including providing and laying 20mm thick bitumen mastic asphalt on prepared surface strictly in accordance with IS specification No5317-2002(As latest modified) with mastic i.e. bitumen of grade 20/30 @4.50 Kg /Sqm (minimum) mixed stone dust (lime stone powder with calcium value 80%) @0.008 Cum/Sqm and stone chipping of size 12.5mm and 10mm @0.0096 Cum/Sqm and sand @0.004 Cum per sqm and inerting stone graded of 22mm size with 0.017 Kg/Sqm of 20/30 bitumen per Sqm for anti skiding including all tools and plants etc complete all as specified and directed. | 385 | 10 Sqm | 9,000 ₹34,65,000 | 9,000 ₹34,65,000 |
Updated dates
Tender Value
₹59 L
EMD Value
₹1.1 L
Closing Date
18 May 2026, 6:00 pmClosed
CWE KOLKATA
Headquarter Commander Works Engineers Military Engineer Services No1 National Library Avenue Alipore Kolkata700 027
SPL REPAIR TO ROAD INSIDE BMC POCKET UNDER GE(C) KOLKATA
2026_MES_758671_1
C/8479/E-43/25-26
Open Tender
Civil Works - Roads
180 days
GE CENTRAL KOLKATA
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,000
GE CENTRAL KOLKATA
₹1.1 L
Yes
25 Jun 2026
30 Mar 2026
25 May 2026
30 Mar 2026
18 May 2026
4 May 2026
31 Mar 2026 - 7 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Material & labour of repair to pot holes of exc 30 cm depth, not exc 1.00 Sqm each incl sweeping free from dust and mud or water, scoring sunken surfaces in roads etc and cutting around edges to at least 25mm in depth and making good by applying tack coat of bitumineous primer VG-10 at 5 kg/ 10 Sqm putting in premixed bituminous macadam, well rammed and sealed with binder 9.8 kg per 10 sqm, binded with 0.09 cum of stone chippings, 6.3mm size and again well rammed complete all as spd & directed. | - | 10 Sqm | - | - | |
Material & labour of repair to pot holes of any depth not exc 1.00 Sqm each incl sweeping free from dust and mud or water, scoring sunken surfaces in roads, paths etc and cutting around edges to at least 25mm in depth and making good by filling in screened & graded road metal, watering and well ramming (including supply of road metal) complete all as spd & directed. . | - | 10 Sqm | - | - | |
Material & labour for preparation of WBM surfaces by brushing with wire brush for removing caked mud etc sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc complete all as specified and directed | - | 10 Sqm | - | - | |
Material & labour for applying evenly a priming / tack coat with bituminous primer by using paving bitumen VG-10 grade @10 Kg per 10 Sqm of road surface complete all as specified and directed | - | 10 Sqm | - | - | |
Material & labour for preparation of existing black top surfaces / BM surface by brushing with wire brush for removing caked mud etc sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc complete all as specified & directed. | - | 10 Sqm | - | - | |
Material & labour for applying evenly a priming / tack coat with bituminous primer by using paving bitumen VG-10 grade @5Kg per 10 Sqm of road surface complete all as specified and directed | - | 10 Sqm | - | - | |
Material & labour for premix bituminous macadam
40 mm (mix) consolidated thickness with 3.3% (minimum) paving bitumen(VG-30) as a binder by weight of total mix and grading of aggregates & design criteria as specified in SSR Part -I clause no 20.B.2.5.4(b) & 20.B.2.5.2, spread, rolled and consolidated to gradient and camber required and all as specified in para 20.B.3 & sub para 20.B.3 of MES Schedule Part I and as directed. | - | Cum | - | - | |
Material & Labour for Bituminous premix semi-dense asphaltic concrete 40mm consolidated thickness with 4.5% (minimum) paving bitumen(VG-30) as a binder by weight of total mix and grading of aggregates & design criteria as specified in SSR Part -I clause no 20.B.2.5.4(d) & 20.B.2.11 mixing & laying, rolled, consolidated to gradient and camber required as specified in para 20.B.4 & sub para 20.B.4 of MES Schedule Part I complete all as specified and directed.
Notes for Item No 12 & 13
1. No price adjustment shall be applicable if the approved quantity of binder as per design mixed is more than specified quantity.
2. The Contractor is advised to assess the realistic quantity of binder for the Design Mix specified above before quoting. If considered necessary, they may get the Design Mix done on their own before quoting the Tender. However, the Design Mix done prior to quoting of Tender shall not be considered for incorporation in the Work after conclusion of Contract and shall have to be done as specified above.complete all as spd and directed.
3. Contractor shall submit the authenticated weight batch receipt as per load material in site duly marked vehicle number | - | 10 Sqm | - | - | |
Material & labour for applying a tack coat over existing bituminous surface @ 0.5 Kg/Sqm of 20/30 bitumen and providing and laying 20mm thick bitumen mastic asphalt on prepared surface strictly in accordance with IS specification No5317-2002(As latest modified) with mastic i.e. bitumen of grade 20/30 @4.50 Kg /Sqm (minimum) mixed stone dust (lime stone powder with calcium value 80%) @0.008 Cum/Sqm and stone chipping of size 12.5mm and 10mm @0.0096 Cum/Sqm and sand @0.004 Cum per sqm and inerting stone graded of 22mm size with 0.017 Kg/Sqm of 20/30 bitumen per Sqm for anti skiding including all tools and plants etc complete all as specified and directed. | - | 10 Sqm | - | - | |
Material & labour for preparing bituminous surface of road and marking 2.5 mm thick centre lines, stop lines, dashes, arrows, letters, zebra cross etc and the like n.exc 10cm wide on roads, pavements with hot applied thermoplastic road marking paint of approved colour as per IRC 35 conforming to BS 3262-1989 with 20% glass beads (intermixed), spread and laid by automatic mechanical machine engine drive complete all as specified and as directed. | - | Sqm | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
TENDER.pdf
Tender Documents • 1.20 MB
BOQ_849775.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid