Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.3 CrAccepted-Finance J HOUSE B 103 SOUTH CITY 1 SECT 30 NEAR SIGNATURE TOWN GURUGRAM 122001 | GURUGRAM | GURUGRAM | HARYANA | 122001 | ₹20.3 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹20.7 CrRejected-Finance BOMDILA AP | SHI YOMI | ARUNACHAL PRADESH | 791001 | ₹20.7 Cr | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technically Non-Responsive |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technically Non-Responsive |
| Sl No | Description | Qty | Unit | T.T.C. INFRA INDIA L2 | J INFRATECH LIMITED L1 |
|---|---|---|---|---|---|
| 1.01 | Maintenance of Earth Shoulder (stripping excess soil) (Stripping excess soil from the shoulder ( Average depth of 150 mm )surface to achieve the approved level and compacting with plate compactor) | 4,398 | Sqm | 35.54 ₹1.6 L | 60 ₹2.6 L |
| 1.02 | Sacarifying existing bituminous surface to a depth of 50 mm by mechanical means (Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 meters). | 1,46,600 | Sqm | 41.36 ₹60.6 L | 95 ₹1.4 Cr |
| 1.03 | Granular Sub-base with Close Graded Material (Table:- 400-1)
Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density,complete as per cl. 401 (with an initial lead of 5 Km.) (Including cost of testing of materials at site and laboratory as directed by the deptt.) , for grading- II Material | 700 | Cum | 2,949.37 ₹20.6 L | 1,850 ₹12.9 L |
| 1.04 | Wet Mix Macadam (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sb-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density ( including carriage up to initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant ) | 2,525 | Cum | 3,406.17 ₹86.0 L | 2,500 ₹63.1 L |
| 1.05 | Prime coat
A. Prime coat (Providing and applying primmer coat with bitumen emulsion on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.60kg/sqm using mechanical means.) (Including cost of testing of materials at site and laboratory as directed by the deptt.)
(ii) With Bitumen Emulsion-CSS-1 (IS- 8887-2004) | 1,46,600 | Sqm | 48.7 ₹71.4 L | 38 ₹55.7 L |
| 1.06 | Tack Coat (for DBM)
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. (Including cost of testing of materials at site and laboratory as directed by deptt.)
(II) With Bitumen Emulsion CSS-1 (IS:8887-2004)
(c) Granular Surfaces treated with primer | 1,46,600 | sqm | 32.51 ₹47.7 L | 14 ₹20.5 L |
| 1.07 | Tack Coat (for BC)
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. (Including cost of testing of materials at site and laboratory as directed by deptt.)
(II) With Bitumen Emulsion CSS-1 (IS:8887-2004)
(a) Normal Bituminous Surface | 1,46,600 | sqm | 32.51 ₹47.7 L | 15 ₹22.0 L |
| 1.08 | Dense Graded Bituminous Macadam (50mm) (Providing and laying dense bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5% by weight of total mix and filler transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the reqd. grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H cl. no. 507. complete in all respect. (Including cost of testing of materials at site and laboratory as directed by the deptt.)
(b) With rock dust as filler (refer table 500-9 of MoRT&H specification)
(i) with 60/70 or VG-30 grade bitumen
(ii) for Grading II (19 mm nominal size) | 7,330 | cum | 11,162.04 ₹8.2 Cr | 10,055 ₹7.4 Cr |
| 1.09 | Bituminous Concrete (40mm) (Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the reqd. grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoR&TH cl. no.509. complete in all respect. (including carriage up to initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant )( Including cost of testing of materials at site and laboratory as directed by the deptt.)
(b). With rock dust as filler (refer table 500-9 of MoRT&H Specification)
(I) with 60/70 or VG 30 -
(ii) for Grading II (13 mm nominal Size) | 5,864 | Cum | 12,452.42 ₹7.3 Cr | 13,970 ₹8.2 Cr |
| 1.10 | Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes and conforming to the MoRT&H specifications | 4,333 | sqm | 364.92 ₹15.8 L | 475 ₹20.6 L |
Tender Value
₹19.7 Cr
EMD Value
₹39.4 L
Closing Date
1 Sept 2025, 5:00 pmClosed
General Manager (P)
General Manager (P) National Highways and Infrastructure Development Corporation Limited. Regional Office, 2nd Floor, Agnishanti Business Park, Opp. AGP Office GNB Road, Ambari, Guwahati- 781001
One Time Improvement of Silchar-Jiribam section from km 33.262 to km 47.922 of old NH-53 (new NH-37) in the State of Assam during FY 2025-26 on Item Rate Basis
2025_NHIDC_872294_1
RO-GHY/Sil/NH37/SJ-2/OTI/25-26
Open Tender
Civil Works
90 days
Assam
Please refer Tender Documents
5 documents required · 5 mandatory
₹11,800
NHIDCL
₹39.4 L
NHIDCL, RO Guwahati
8 Nov 2025
7 Aug 2025
2 Sept 2025
7 Aug 2025
1 Sept 2025
7 Aug 2025
7 Aug 2025 - 13 Aug 2025
14 Aug 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid