Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.4 LAdmitted-Fee/PreQual/Technical/Finance | -0.08% | ₹8.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹8.4 L+₹502.35 (0.06%)Admitted-Fee/PreQual/Technical/Finance | -0.02% | ₹8.4 L+₹502.35 (0.06%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹8.4 L+₹586.08 (0.07%)Admitted-Fee/PreQual/Technical/Finance | -0.01% | ₹8.4 L+₹586.08 (0.07%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹9.9 L
EMD Value
₹19,900
Closing Date
20 Jul 2026, 12:00 pmClosed
B.D.O. MARDAH GHAZIPUR
OFFICE B.D.O. MARDAH GHAZIPUR
GRAM SABHA PANDEYPUR RADHE ME NAWPURA ME BAHUDDESHIYA STHAL KA NIRMAN KARYA
2026_RDUP_1169176_2
504 date13-07-2026
Open Tender
Civil Works
Percentage
90 days
MARDAH GHAZIPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹677
B.D.O. MARDAH GHAZIPUR
₹19,900
Yes
20 Jul 2026
14 Jul 2026
20 Jul 2026
14 Jul 2026
20 Jul 2026
14 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in Excavation in foundation in Ordinary Soil including Lift up to 1.50 M. and Lead up to 30.00m. Including all Complete as per S.I.NO. 251 | 48.23 | Cum | 130 | ₹6,269.9 |
| 2 | Concrete with 40 mm gauge B/Ballast,Fine sand of 1.25 FM.and Cement in proportion of 12:6:1 in Foundation and under Floor I/C Supply of all material labour and T&P etc.all complete as per S.I.No.273. | 36.47 | Cum | 4,060 | ₹1,48,068.2 |
| 3 | CLASS M150 BRICK WORK IN CEMENT & FINE SAND MORTER IN 1:4 IN FOUNDATION INCLUDING SUPPLY OF ALL LABOUR MATERIAL ETC. UP TO PROPER COMPLETION OF WORKS. ASPER SI NO. 305 | 44.79 | Cum | 5,450 | ₹2,44,105.5 |
| 4 | 12 mm Thick Plastering in 1:4 Cement and fine sand morter on rough surface I/C all complete as per S.I NO 584 | 328.01 | SQM | 165 | ₹54,121.65 |
| 5 | R.c.c work with cement,c.sand and 20mm stone grit in proportion 1:2:4 for Rcc cover,I/c for proper completion of work as per s.i no 283 | 0.88 | Cum | 8,050 | ₹7,084 |
| 6 | M.S. or Iron work in plain work such as in R.B or R.c.c work I/c as per S.i no 504 | 0.69 | qtl | 6,350 | ₹4,381.5 |
| 7 | finishing walls with water proof cement paint of approved make and quality on new work with(2coat) to give an even shed including supply of all materials labour&T&P I/c required for proper completion of work as per s.i no 660+661 | 317.81 | SQM | 80 | ₹25,424.8 |
| 8 | painting or varnishing new iron work in small area or new wood work with 1coat of ready mixed priming paint and 2coat of approved superior quality ready mix paint of approved brand i.e british paint,shalimar paint,asian or equivalent paint I/c for proper completion of work as per s.i no 641&642 | 4.5 | SQM | 94.5 | ₹425.25 |
| 9 | Mild steel or iron work in heavy sizes such as trusses built up gates record rakes roof work gates etc wroughr required from including grilling holes rivetting or welding where necessary & theur fixing required for proper completion of work as per si no 503 | 180 | kg | 70 | ₹12,600 |
| 10 | Providing and laying of interlocking concrete block pavements having thickness 80mm including leveling & dressing of surface of required level & slope spreading & moisting 30mm thick local sand on bed filling joints with local sands etc. For proper comple | 250 | SQM | 835 | ₹2,08,750 |
stage.html
html • 0.02 MB
finance_2193987.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
BOQ_2193987.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .