Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.1 LAdmitted-Fee/PreQual/Technical/Finance AT JAGANNATH COLONY PO SOUTH BALANDA ANGUL ODISHA 759116 | ANGUL | ANGUL | ODISHA | 759116 | -38.21% | ₹5.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹5.2 L+₹9,974.97 (1.96%)Admitted-Fee/PreQual/Technical/Finance AT PO GOBARA TALCHER DIST ANGUL ODISHA PIN 759103 | TALCHER | ANGUL | ODISHA | 759103 | -37.00% | ₹5.2 L+₹9,974.97 (1.96%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹5.3 L+₹23,494.78 (4.61%)Admitted-Fee/PreQual/Technical/Finance AT PO KARNAPUR TALCHER DIST ANGUL ODISHA 759103 | TALCHER | ANGUL | ODISHA | 759103 | -35.36% | ₹5.3 L+₹23,494.78 (4.61%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹6.2 L+₹1.1 L (20.9%)Admitted-Fee/PreQual/Technical/Finance | -25.30% | ₹6.2 L+₹1.1 L (20.9%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹9.7 L
EMD Value
₹12,200
Closing Date
10 Aug 2026, 5:00 pmClosed
STAFF OFFICER (CIVIL), HINGULA AREA
SO (CIVIL), OFFICE OF THE GM, HINGULA AREA, P.O._N.S.NAGAR, TALCHER, ANGUL_759148, ODISHA, INDIA
Making 08 nos Goal post and 08 Nos of drop gate at different locations of mines as and when required at Balram OCP under Hingula Area.
2026_MCL_362796_1
MCL/GM(HA)/Civil/e-Tender/ 26-27/42 Dt.30.07.2026
Open Tender
Civil Works - Others
Percentage
60 days
BALRAM OCP
Please refer Tender documents.
3 documents required · 3 mandatory
₹12,200
12 Aug 2026
31 Jul 2026
12 Aug 2026
31 Jul 2026
10 Aug 2026
31 Jul 2026
31 Jul 2026 - 3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Item Description | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | 8.12 | cum | 217 | ₹1,762.58 |
| 1.02 | Providing and laying in position excluding cement concrete of level: specified grade the cost of centering and shuttering - All work up to plinth 1:3:6 (1 Cement : 3 coarse sand (zone-Ill) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources) | 8.12 | cum | 5,219.9 | ₹42,398.64 |
| 1.03 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 5,962.83 | Kg | 124 | ₹7,39,391.17 |
| 1.04 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two or more coats on new work | 168.55 | Sqm | 114.65 | ₹19,324.26 |
| 1.05 | Providing of Nylone rope 12mm dia | 25 | Mtr | 27.6 | ₹690 |
| 1.06 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade:One or more coats on old work | 168.55 | Sqm | 75.05 | ₹12,649.68 |
| 2Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC | |||||
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.62 MB
Tendernotice_2.pdf
PDF • 1.33 MB
BOQ_375706.xls
BOQ • 0.33 MB
Corrigendum262742.pdf
PDF • 1.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .