Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.0 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L1₹1.0 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1 L
EMD Value
₹3,000
Closing Date
3 Aug 2026, 6:00 pmClosed
Office of the Executive Engineer REW Anantnag
Office of the Executive Engineer REW Anantnag
C/O CROSSING FROM HOUSE OF GULZAR AHMAD SHAH, GH MOHD SHAH, TUMBIPOR, TELWANI
2026_RDPR_318062_4
ENIT78of2026-27
Open Tender
Civil Works
Percentage
30 days
Anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Office of the Executive Engineer REW Anantnag
₹3,000
5 Aug 2026
27 Jul 2026
4 Aug 2026
27 Jul 2026
3 Aug 2026
27 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earthwork in excavation by manual means incl disposal of excavated material upto alead of 25 m. | 5.61 | cum | - | - |
| 0.0 | P/L of stone Soling tightly handpacked and tamped manually incl carriage and 20% Voids deduction (to be paid as per actual) | 2 | cum | - | - |
| 0.0 | Providing and laying cement concrete of specified grade excluding the cost of centering & shuttering using M10 mix. (1:3:6) and by using 20 mm down aggregates. | 3.51 | Cum | - | - |
| 0.0 | Reinforced cement concrete work in Slab excluding cost of centring, shuttering, finishing and reinforcement,with 1:1.5:3 graded stone aggregate 20mm nominal size . | 3.43 | Cum | - | - |
| 0.0 | Reinforcement for RCC work including straightening,bending,cutting,placing in position and binding all complete, hot rolled deformed bars @ 80 kgs/cum | 274.43 | kgs | 1 | ₹274.16 |
| 0.0 | Centering/ shuttering incl.propping,strutting & removalof same SLAB | 7.95 | sqm | - | - |
| 0.0 | Centering/ shuttering incl.propping,strutting & removalof same ABUTS | 10.4 | sqm | - | - |
| 0.0 | Filling of approaches by using Nallah Muck | 1 | LS | - | - |
| 0.0 | Steel/cement | 1 | trip | - | - |
| 0.0 | Bajri | - | cum | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
BOQ_1045830.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .