Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.2 LAccepted-Finance | ₹18.2 L | L1 | Accepted-Finance being 1st lowest |
| 2 | L2₹18.9 LRejected-Finance | ₹18.9 L | L2 | Rejected-Finance being 2nd lowest |
| 3 | L3₹19.3 LRejected-Finance | ₹19.3 L | L3 | Rejected-Finance being 3rd lowest |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Not upload ITR and Workdone |
| Sl No | Description | Qty | Unit | SUMIT NEGI L2 | PITAMBER NEGI L3 | MUKESH KUMAR CONTRACTOR L1 |
|---|---|---|---|---|---|---|
| 1.00Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceed 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottom, lift upto 1.5 m, including getting out the excavated soil and disposal surplus excavated soil as directed, within a lead of 50 m. | ||||||
| 1.01 | 2.8.1 All kind of Soil | 8.54 | cum | 286.45 ₹2,446.28 | 290 ₹2,476.60 | 285 ₹2,433.90 |
| 2.00Random rubble masonry with hardstone in foundation and plinth including levelling up with cement concrete 1:6:12 (1cement : 6 coarsesand : 12 gradedstone aggregate 20 mm nominal size) upto plinth level with : | ||||||
| 2.01 | 7.1.1 Cement mortar 1:6 (1 cement : 6 coarse
sand) | 10.68 | cum | 7,265.95 ₹77,600.35 | 7,400 ₹79,032 | 7,000 ₹74,760 |
| 3.00Supplying and stacking of hard stone (for stone pitching) 22.5 cm thick at site. | ||||||
| 3.01 | Toilets | 5.96 | cum | 1,003.4 ₹5,980.26 | 1,050 ₹6,258 | 1,000 ₹5,960 |
| 4.00Dry stone pitching 22.5 cm thick laid in courses and required profile with hammer dressed stones having no side less than 15 cm, with minium depth of 20 cm including preparing the bedding surface etc. all complete. (Payment for Stone to be made separately) | ||||||
| 4.01 | Toilets | 39.72 | sqm | 556.65 ₹22,110.14 | 560 ₹22,243.20 | 550 ₹21,846 |
| 5.00Stone work in plain ashlar in super structure upto floor five level in cement mortar 1:6 (1 cement : 6 coarse sand) including pointing with cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment matching the stone shade | ||||||
| 5.01 | 7.12.2.2 White sand stone | 13.78 | cum | 88,000 ₹12.1 L | 94,800 ₹13.1 L | 85,700 ₹11.8 L |
Tender Value
₹20.9 L
EMD Value
₹62,800
Closing Date
24 Apr 2026, 5:00 pmClosed
DCF Sarahan
Deputy Conservator of Forest Wildlife Division, Sarahan
Construction of Toilet at Rakchham
2026_FD_134603_1
25 dated 18/04/2026
Open Tender
Civil Works
Sarahan
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,500
DCF Sarahan
₹62,800
25 Apr 2026
18 Apr 2026
25 Apr 2026
18 Apr 2026
24 Apr 2026
18 Apr 2026
18 Apr 2026 - 24 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceed 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottom, lift upto 1.5 m, including getting out the excavated soil and disposal surplus excavated soil as directed, within a lead of 50 m. | |||||
| 1.01 | 2.8.1 All kind of Soil | - | cum | - | - |
| 2Random rubble masonry with hardstone in foundation and plinth including levelling up with cement concrete 1:6:12 (1cement : 6 coarsesand : 12 gradedstone aggregate 20 mm nominal size) upto plinth level with : | |||||
| 2.01 | 7.1.1 Cement mortar 1:6 (1 cement : 6 coarse
sand) | - | cum | - | - |
| 3Supplying and stacking of hard stone (for stone pitching) 22.5 cm thick at site. | |||||
| 3.01 | Toilets | - | cum | - | - |
| 4Dry stone pitching 22.5 cm thick laid in courses and required profile with hammer dressed stones having no side less than 15 cm, with minium depth of 20 cm including preparing the bedding surface etc. all complete. (Payment for Stone to be made separately) | |||||
| 4.01 | Toilets | - | sqm | - | - |
| 5Stone work in plain ashlar in super structure upto floor five level in cement mortar 1:6 (1 cement : 6 coarse sand) including pointing with cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment matching the stone shade | |||||
| 5.01 | 7.12.2.2 White sand stone | - | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
TenderNotice.pdf
Tender Documents • 0.76 MB
BOQ_199193.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid