| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-AOC | ₹1.7 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.8 Cr+₹7.7 L (4.52%)Rejected-AOC | ₹1.8 Cr+₹7.7 L (4.52%) | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | MOHANDHAS L2 | RADHA KRISHNAN L1 |
|---|---|---|---|---|---|
| 1.00 | Scaffolding charges for Vimanans and gopurams with casurina posts coconut or plam trees wherever necessary for main, form work and providing with coconut keeth coverings, providing ladder arrangements, country wood pland for working, inpection etc, complete hire charges only for erection, maintainance and removing the same on completion of the work 1 sq,ft. 15 feet height.. | 197 | Sqm | 293 ₹57,721 | 280.59 ₹55,276.23 Lowest |
| 2.00 | Scrapping the Existing Cement Paint in Corewalls& Vimanams wherever necessary for main, form work and providing with coconut keeth coverings, providing ladder arrangements, country wood pland for working, inpection etc, complete hire charges only for erection, maintainance and removing the same on completion of the work | 73 | Sqm | 10.41 ₹759.93 | 9.95 ₹726.35 Lowest |
| 3.00 | Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with C.M. 1:4 complete including shapping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embdding broken bricks of shaped/chiselled bricks, rough-plastering with C.M. 1:4 and finishing withfinal ornamental plastering and nayam theervani including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete inculding all axtra for folding and inculuding clearing from the vimanams/gopurams 100sft superficial area. for kalkaram | 73 | Sqm | 3,151 ₹2,30,023 | 3,014.35 ₹2,20,047.55 Lowest |
| 4.00 | Painting two coats (Ega varnam) of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. | 73 | Sqm | 260 ₹18,980 | 248.89 ₹18,168.97 Lowest |
| 5.00 | Restoration by providing water wash and appropriate methodology to restore the originalities of the existing Cutstone structures inclusive of necessary scaffolding charges, conveyance and all hire charges for all tools and plants and clearing the site after completion of work etc, complete | 2,410 | Sqm | 45 ₹1,08,450 | 42.78 ₹1,03,099.8 Lowest |
| 6.00 | Removing the damaged teak wood Rafters,Beams&Reepers including clearing away from site etc. complete complying with standard specification and as directed by the departmental officers. | 24 | Cum | 771 ₹18,504 | 737.69 ₹17,704.56 Lowest |
| 7.00 | Supplying and providing well matured teak wood wrougtht and putup and framed work for roof members such as wall plate including cutting and jointing as traditional method including all ornamental works etc complete using wooden nails and necessary cuttings beedings and carving works etc complete for Rafters in Moolavar Copper vimanam including cost and conveyance of all materials and Labour charges for laying complying with standard specification etc., complete. | 24 | Cum | 2,37,200 ₹56,92,800 | 2,26,939.6 ₹54,46,550.4 Lowest |
| 8.00 | Supplying and fixing of Teak wood reeper of 0.05x.025m size including cost and conveyance of all materials and Labour charges for laying complying with standard specification etc., complete. | 284 | RM | 81 ₹23,004 | 77.61 ₹22,041.24 Lowest |
| 9.00 | Removing the mangalore tiles roofing including clearing away from site etc. complete complying with standard specification and as directed by the departmental officers. | 150 | Sqm | 29 ₹4,350 | 27.69 ₹4,153.5 Lowest |
| 10.00 | Refixing the old mangalore tiles Set in lime Mortor 1:2, over hip Tiles including cost and conveyance of all labour charges for fixing etc complete with standard specification as directed by the department officers etc,. | 150 | Sqm | 1,302 ₹1,95,300 | 1,246.03 ₹1,86,904.5 Lowest |
Tender Value
₹1.7 Cr
EMD Value
₹96,100
Closing Date
13 Mar 2025, 11:00 amClosed
Joint Commissioner / Executive Officier
Kanyakumari District Temples, Suchindrum
Thiruppani works in Arulmigu Ramaswamy Temple at Padmanathapuram Kalkualm Taluk in Kanniyakumari District
2025_HRCE_527781_1
J.C./E.O.R.C.No.7373/2024/G4
Open Tender
Maintenance Works
Lump-sum
540 days
Padmanabhapuram
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹96,100
8 Aug 2025
25 Feb 2025
13 Mar 2025
25 Feb 2025
13 Mar 2025
25 Feb 2025
Amount
Scaffolding charges for Vimanans and gopurams with casurina posts coconut or plam trees wherever necessary for main, form work and providing with coconut keeth coverings, providing ladder arrangements, country wood pland for working, inpection etc, complete hire charges only for erection, maintainance and removing the same on completion of the work 1 sq,ft. 15 feet height..
Scrapping the Existing Cement Paint in Corewalls& Vimanams wherever necessary for main, form work and providing with coconut keeth coverings, providing ladder arrangements, country wood pland for working, inpection etc, complete hire charges only for erection, maintainance and removing the same on completion of the work
Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with C.M. 1:4 complete including shapping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embdding broken bricks of shaped/chiselled bricks, rough-plastering with C.M. 1:4 and finishing withfinal ornamental plastering and nayam theervani including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete inculding all axtra for folding and inculuding clearing from the vimanams/gopurams 100sft superficial area. for kalkaram
Painting two coats (Ega varnam) of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Restoration by providing water wash and appropriate methodology to restore the originalities of the existing Cutstone structures inclusive of necessary scaffolding charges, conveyance and all hire charges for all tools and plants and clearing the site after completion of work etc, complete
Removing the damaged teak wood Rafters,Beams&Reepers including clearing away from site etc. complete complying with standard specification and as directed by the departmental officers.
Supplying and providing well matured teak wood wrougtht and putup and framed work for roof members such as wall plate including cutting and jointing as traditional method including all ornamental works etc complete using wooden nails and necessary cuttings beedings and carving works etc complete for Rafters in Moolavar Copper vimanam including cost and conveyance of all materials and Labour charges for laying complying with standard specification etc., complete.
Supplying and fixing of Teak wood reeper of 0.05x.025m size including cost and conveyance of all materials and Labour charges for laying complying with standard specification etc., complete.
Removing the mangalore tiles roofing including clearing away from site etc. complete complying with standard specification and as directed by the departmental officers.
Refixing the old mangalore tiles Set in lime Mortor 1:2, over hip Tiles including cost and conveyance of all labour charges for fixing etc complete with standard specification as directed by the department officers etc,.
Removing the Flat tiles roofing including clearing away from site etc. complete complying with standard specification and as directed by the departmental officers
Refixing the Flat tiles roofing Set in lime Mortor 1:2, over hip Tiles including cost and conveyance of all labour charges for fixing etc complete with standard specification as directed by the department officers etc,.
Varnish two coats over old wood work including cost and conveyance of all labour charges for fixing etc complete with standard specification as directed by the department officers etc,.
Painting old wood work with two coats of synthetic enamel paint of approved quality and colour over one coat of white primer in all floors the rate is to include cost of all materials, brushes scaffolding charges etc., complete complying with standard specifications.
Scrapping the Existing Cement/Lime plastering including clearing away from site etc. complete complying with standard specification and as directed by the departmental officers.
Dismantling the Existing Cement concrete including clearing away from site etc. complete complying with standard specification and as directed by the departmental officers.
Earth work excavation for foundation in all classes of soils and sub soils and todepth as may be directed except in hard rock, requiring blasting, including infinal leads and lifts and re-filling the sides of foundation, with excavated earth in 150mm layers well watered rammed and consolidated, including depositing surplus earth clearing and levelling the site, shoring shuttering baling out water wherever necessary etc., complete complying with standard specification..
Providing Cut stone flooring using New Cut stone slabs of 100mm thick including cost and conveyance of all materials and Labour charges for laying, fixing in position and pointing with cement mortar 1:3 (One part of Cement, Three parts of sand)and as directed by the officer in charge etc., complete complying with standard specifications etc complete. (The lime sourced from pollachi which is highly iron fortified and suitable for structual and masonry works etc.,to be used) Single Line Dressing.
Cement concrete 1:5:10 (one cement five sand ten aggregate) using 40mm gauge hard granite broken stone jelly for foundation including cost and conveyance of all materials labour for mixing,l aying, compacting, curing, dewatering, side shuttering, wherever necessary including curing etc.,complete complying with standard specification and as directed.
Plastering with Cement Mortar 1:3 (One cement and Three Plastering sand), 20mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Supplying and filling in foundation in basement with filling sand in layars of 150mm thickness well watered rammed and consolidated complyiny with relevant std specification including cost of supplying filling sand.
Pointing with Lime mortar 1:1.5 (One lime and one and half sand) including scaffolding finishing curing etc., complete complying with standard specification and as directed.
Brick work in following Cement Mortar 1:5 using best quality of country bricks of size 8-3/4" x 4-1/4" x 2-1/4" for foundation and basement including curing, etc., complete complying with standard specifiction.
Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Plastering with Lime Mortar 1:4 (One Lime and Four Plastering sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Supplying and fixing mild steel grills for windows, ventilators, rtc., including priming coat .including cost and conveyance of all materials into the site and all labour charges etc complete with standard specification etc complete.as directed by the department officers etc
Painting New iron work with two coats of synthetic enamel paint of approved quality and color over one coat of white primer in all floors the rate is to include cost of all materials, brushes scaffolding charges etc., complete complying with standard specifications
Painting old wood work with two finishing coats of synthetic enamel ready mixed paint of approved quality and colour complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)
Dismantling the existing Weathering Course and Pressed tilles including clearing away from site etc. complete complying with standard specification and as directed by the departmental officers.
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers.
Sub total
MOHANDHAS (BID ID -1268087)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_628457.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .