Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹47,024
Closing Date
8 Oct 2026, 3:00 pm
Chief Executive Officer
Chief Executive Officer, District Panchayat, Daman
Construction of New Toilet block at Ground Floor and First Floor , Inside First floor painting in Govt.Primary School Bhimpore in Bhimpore G.G.Panchayat,Nani Daman.
2026_DAMAN_4986_1
15/2026-27
Open Tender
Civil Works
Works
90 days
Daman
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Chief Executive Officer
₹47,024
24 Sept 2026
24 Sept 2026
8 Oct 2026
24 Sept 2026
8 Oct 2026
24 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Items : | |||||
| 1.01 | Demolition of Brick work and stone masonry including Stacking of serviceable materilas and disposal of unserviceable materials with all lead and lift.(ii) In Cement Mortar. | 98.32 | cu.m | - | - |
| 1.02 | Demolition including stacking of serviceable materilas and disposal of unserviceable materials with all lead and lift. (i) R.C.C. Work | 1.51 | cu.m | - | - |
| 1.03 | Dismentling doors, windows, ventilators etc. (wood or steel) shutters including chowkhats architraves, holdfasts and other attachment etc. complete and stacking them within all lead and lift.(i) Not exceeding 3 Sq.M. in area | 4 | Each | - | - |
| 1.04 | Dismentaling tiled of stone floors laid in mortar including stacking of serviceable materilas and disposal of unserviceable materials with all lead and lift. | 10.09 | Sqm | - | - |
| 1.05 | Excavation for foundation upto 1.5 m depth including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(E)Hard Rock | 96.75 | cu.m | - | - |
| 1.06 | Excavation for foundation for depth from 1.5 m to 3.0 m including sorting out and stacking of useful materials and disposing off the excavated stuff upto50 Meter lead.(E) Hard Rock | 56.25 | cu.m | - | - |
| 1.07 | Filling in foundation and plinth with brick Bats Chhara in layers of 20cm. thickness including watering, remming and consolidating etc. complete. | 23.88 | cu.m | - | - |
| 1.08 | Providing and laying cement concrete 1:3:6 (1- Cement : 3 Coarse sand : 6- crushed stone aggregates 20 mm nominal size) and curing complete including cost of formwork in (A) Wall Caps / Coping | 9.68 | cu.m | - | - |
| 1.09 | Providing formwork of ordinary timber planking so as to give a rough finish including centering shuttering strutting and propping etc. Height of propping and centering below supporting floor to ceiling not exceeding 4 M. and removal of the same for in situ reinforced concrete and plain concrete work in. (A) Foundations Footings Bases of Columns etc. and Mass concrete. | 40.7 | Sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.87 MB
BOQ_5157.xls
BOQ • 3.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .