Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.9 LAccepted-Finance PHYANG LEH | LEH LADAKH | LADAKH | 194101 | ₹10.9 L | L1 | Accepted-Finance successfully quoted lowest rate |
| 2 | L2₹11.0 LAccepted-Finance | ₹11.0 L | L2 | Accepted-Finance quoted high rate |
| 3 | L3₹11.4 LAccepted-Finance | ₹11.4 L | L3 | Accepted-Finance quoted high rate |
| 4 | L4₹11.4 LAccepted-Finance | ₹11.4 L | L4 | Accepted-Finance quoted high rate |
| 5 | L5₹12.0 LAccepted-Finance | ₹12.0 L | L5 | Accepted-Finance quoted high rate |
Tender Value
₹16.3 L
EMD Value
₹33,000
Closing Date
6 Dec 2025, 2:00 pmClosed
Executive Engineer REW Leh
REW Leh
Construction Of Community Kitchen At Shar Tago Of Chemday
2025_RDD_18072_4
130- UTL REW Leh of 2025-26
Open Tender
Civil Works - Others
30 days
Leh
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Payable To Executive Engineer REW Leh
₹33,000
10 Mar 2026
29 Nov 2025
8 Dec 2025
29 Nov 2025
6 Dec 2025
29 Nov 2025
Earth work in excavation by mechanical means (Hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form for :Foundations, footings, bases of columns, etc. for mass concrete
Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Postsand Struts
Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers
Providing and laying in position Reinforced cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:1½:3 (1 Cement: 1½ coarse sand) : 3 graded stone aggregate 20 mm nominal size)Columns
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:1½:3 (1 Cement: 1½ coarse sand) : 3 graded stone aggregate 20 mm nominal size)Suspended floor beam etc.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:1½:3 (1 Cement: 1½ coarse sand) : 3 graded stone aggregate 20 mm nominal size)col. Above plinth lvl.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete
Providing & fixing upto floor five level precast sun dried mud bricks in mud mortar using approved quality mud with carriage of material complete.
Providing and fixing round beams (local Ballies), including hoisting, fixing in position and applying wood preservative for the unexposed surfaces, etc. complete job;
Providing and fixing local talboos (Second order branch willow tree) including providing an ornamental look and fixing with nails complete job
Providing and laying 200mm thick mud pushka over talboos with 5mm thick dry grass (Yakzes/spoto/dry paddy straw etc), including ramming at OMC
Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length ( hold fast lugs or dash fastener shall be paid for separately). Kiln seasoned and chemically treated hollock wood
Carriage of materials by MT Cement and steel avg lead 50 kms
Sand avg lead 30 kms
Stone aggregate avg lead 30 kms
Earth avg lead 1 kms
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.99 MB
BOQ_43722.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid