Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.4 LAccepted-AOC KALIPAHARI ASANSOL M BURDWAN ASANSOL SOUTH PASCHIM WEST BURDWAN BARDHAMAN PASCHIM WEST BURDWAN BARDHAMAN 713339 WEST BENGAL INDIA | PASCHIM BARDHAMAN | WEST BENGAL | 713339 | ₹13.4 L | L1 | Accepted-AOC SUCCESFUL |
| 2 | L2₹13.7 L+₹30,560.67 (2.29%)Rejected-Finance | ₹13.7 L+₹30,560.67 (2.29%) | L2 | Rejected-Finance As per TC recommendation |
| 3 | L3₹14.5 L+₹1.1 L (8.34%)Rejected-Finance | ₹14.5 L+₹1.1 L (8.34%) | L3 | Rejected-Finance As per TC recommendation |
Tender Value
₹14.5 L
EMD Value
₹18,200
Closing Date
3 Jun 2026, 5:00 pmClosed
Area Safety Officer, Satgram-Sripur Area
Office of the General Manager Satgram-Sripur Area P.O-Deochandnagar Dist-Paschim Bardhman West Bengal-713332
Erection of fence boundary around sealed pits and plantation over the area reclaimed from filling of the abandoned mine opening under final mine closure plan Jamuria Group of mines
2026_ECL_359952_1
SS/GM/ENV/26-27/07 Date-18.05.2026
Open Tender
Miscellaneous Works
Percentage
1460 days
Satgram-Sripur Area
Please refer Tender documents.
4 documents required · 4 mandatory
₹18,200
13 Aug 2026
22 May 2026
5 Jun 2026
23 May 2026
3 Jun 2026
23 May 2026
22 May 2026 - 2 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Work Description | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 all kinds of soil. | 41.07 | cum | 188.75 | ₹7,751.96 |
| 1.02 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-all work up to plinth level
1:3:6 (1 CEMENT:3 coarse sand (zone-III):6 Graded stone aggregate 20 mm nominal size) | 36.51 | cum | 5,434.55 | ₹1,98,415.42 |
| 1.03 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement- all work up to nlinth level.
1:2:4 (1 cement : 2 coarse sand (zone-III) :4 graded stone aggregate 20mm nominal size) | 18.25 | cum | 6,452.8 | ₹1,17,763.6 |
| 1.04 | Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Hot rolled deformed bars | 1,277.5 | kg | 95.75 | ₹1,22,320.63 |
| 1.05 | Centering and shuttering including strutting, propping etc. and removal of form for:
Foundation, footings, bases of columns, etc for mass concrete | 258.57 | sqm | 269.3 | ₹69,632.9 |
| 1.06 | Fencing with R.C.c post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 mt. between the two posts fitted and fixed with G.I staples on wooden plugs or G.I binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C posts, struts, earth work and concrete to be paid for separately) :payment to be made per metre cost of total length of barbed wire used
with G.I barbed wire | 7,416 | met | 10.45 | ₹77,497.2 |
| 1.07 | Creation of Misc. Plantation 2025-26 ( 1 ha. )
Survey and prepartion of Map after completion of Creation work | 1 | ha | 678.5 | ₹678.5 |
| 1.08 | Clearance of undergrowth in thick forest areas
Clear felling, burning, heaping and re-burning in thick undergrowth and bushes for Three Times | 3 | ha | 11,498.85 | ₹34,496.55 |
| 1.09 | Staking and alignment of plantation site, collection of stakes , pitching etc | 1.56 | Nos | 1,878.2 | ₹2,934.69 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.63 MB
Tendernotice_2.pdf
PDF • 1.33 MB
BOQ_372826.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .